Combined Notice of Filings #1, 50340-50341 [2021-19458]
Download as PDF
50340
Federal Register / Vol. 86, No. 171 / Wednesday, September 8, 2021 / Notices
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ (i.e., CP20–48), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: September 2, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–19456 Filed 9–7–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10489–020]
City of River Falls Municipal Utilities;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
License.
b. Project No.: 10489–020.
c. Date Filed: August 26, 2021.
d. Applicant: City of River Falls
Municipal Utilities (City of River Falls).
e. Name of Project: River Falls
Hydroelectric Project (River Falls
Project).
f. Location: The River Falls Project is
located on the Kinnickinnic River in the
City of River Falls in Pierce County,
Wisconsin. The project does not occupy
federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Kevin
Westhuis, Utility Director of the City of
River Falls Municipal Utilities;
kwesthuis@rfcity.org (preferred contact)
or (715) 426–3442.
i. FERC Contact: Shana Wiseman at
(202) 502–8736 or email at
shana.wiseman@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The River Falls Project consists of:
(1) A 140-foot-long, 32-foot-high
concrete dam; (2) an impoundment with
a surface area of 15.5 acres; (3) a 200foot-long, 6-foot-diameter penstock; (4) a
powerhouse containing one generating
unit rated at 250 kilowatts; (5) a 50-footlong transmission line; and (6)
appurtenant facilities.
The River Falls Project is operated in
a run-of-river mode with an estimated
annual energy production of
approximately 1,220,000 kilowatt hours.
The City of River Falls proposes to
continue operating the project as a runof-river facility and does not propose
any new construction to the project.
l. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19)
issued on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Milestone
Target date
Issue Deficiency Letter (if necessary) ..........................................................................................................................................
Request Additional Information ....................................................................................................................................................
Notice of Acceptance/Notice of Ready for Environmental Analysis ............................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
jbell on DSKJLSW7X2PROD with NOTICES
Dated: September 2, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–19454 Filed 9–7–21; 8:45 am]
17:21 Sep 07, 2021
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC06–129–008.
Applicants: Capital Research and
Management Company.
Description: Request for Extension of
Blanket Authorization Under Section
203 of the Federal Power Act of Capital
BILLING CODE 6717–01–P
VerDate Sep<11>2014
DEPARTMENT OF ENERGY
Jkt 253001
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
September 2021.
October 2021.
February 2021.
Research and Management Company, et
al.
Filed Date: 8/30/21.
Accession Number: 20210830–5177.
Comment Date: 5 p.m. ET 9/20/21.
Docket Numbers: EC21–124–000.
Applicants: Gruver Wind
Interconnection, LLC, Gruver Wind,
LLC, KODE Novus I, LLC.
Description: Joint Application for
Authorization Under Section 203 of the
Federal Power Act of Gruver Wind
Interconnection, LLC, et al.
Filed Date: 9/1/21.
Accession Number: 20210901–5234.
Comment Date: 5 p.m. ET 9/22/21.
E:\FR\FM\08SEN1.SGM
08SEN1
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 171 / Wednesday, September 8, 2021 / Notices
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL21–100–000.
Applicants: Nebraska Public Power
District v. Tri-State Generation and
Transmission Association, Inc., and
Southwest Power Pool, Inc.
Description: Complaint of Nebraska
Public Power District.
Filed Date: 9/1/21.
Accession Number: 20210901–5220.
Comment Date: 5 p.m. ET 9/21/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–676–005.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Compliance filing:
Settlement Compliance Filing to be
effective 3/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5169.
Comment Date: 5 p.m. ET 9/22/21.
Docket Numbers: ER21–2438–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
3630SR1 Maverick Wind Project GIA to
be effective 6/29/2021.
Filed Date: 9/2/21.
Accession Number: 20210902–5083.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2490–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment: Errata
to Amendment to ISA No.2967, in
Docket No. ER21–2490–000 to be
effective 6/17/2011.
Filed Date: 9/2/21.
Accession Number: 20210902–5090.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2818–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Revisions to Rate Schedule FERC No.
281 (Modified CTP Methodology) to be
effective 11/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5171.
Comment Date: 5 p.m. ET 9/22/21.
Docket Numbers: ER21–2819–000.
Applicants: South Field Energy LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule and
Request for Waiver and Expedited
Action to be effective 10/1/2021.
Filed Date: 9/2/21.
Accession Number: 20210902–5000.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2820–000.
Applicants: York Generation
Company LLC.
Description: Tariff Amendment:
Notice of Cancellation to be effective 9/
20/2021.
VerDate Sep<11>2014
17:21 Sep 07, 2021
Jkt 253001
Filed Date: 9/2/21.
Accession Number: 20210902–5033.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2821–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3558R1 WAPA, MDU & MISO
Interconnection Agreement to be
effective 12/31/9998.
Filed Date: 9/2/21.
Accession Number: 20210902–5046.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2822–000.
Applicants: Commonwealth Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Commonwealth Edison Company
submits tariff filing per 35.13(a)(2)(iii):
ComEd submits revisions to Att. H–13
re: Sterling Rail, L.L.C. to be effective 9/
3/2021.
Filed Date: 9/2/21.
Accession Number: 20210902–5078.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2823–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–09–02_SA 3313 WAPA–MDU 1st
Revised Interconnection Agreement to
be effective 12/31/9998.
Filed Date: 9/2/21.
Accession Number: 20210902–5113.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2824–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: Tariff Amendment: DECBroad River Energy, LLC SA No. 240—
Notice of Cancellation to be effective 11/
2/2021.
Filed Date: 9/2/21.
Accession Number: 20210902–5117.
Comment Date: 5 p.m. ET 9/23/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
50341
Dated: September 2, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–19458 Filed 9–7–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1121–132]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Application for
Temporary Variance of Flow
Requirements.
b. Project No: 1121–132.
c. Date Filed: August 25, 2021.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Project: Battle Creek
Hydroelectric Project.
f. Location: The project is located on
Battle Creek and its tributaries in Shasta
and Tehama counties, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ms. Megan
Young, License Coordinator, Pacific Gas
and Electric Company, Mail Code:
N11D, P.O. Box 770000, San Francisco,
CA 94177, Phone: (530) 364–6009.
i. FERC Contact: John Aedo, (415)
369–3335, john.aedo@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 21, 2021.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
E:\FR\FM\08SEN1.SGM
08SEN1
Agencies
[Federal Register Volume 86, Number 171 (Wednesday, September 8, 2021)]
[Notices]
[Pages 50340-50341]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-19458]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC06-129-008.
Applicants: Capital Research and Management Company.
Description: Request for Extension of Blanket Authorization Under
Section 203 of the Federal Power Act of Capital Research and Management
Company, et al.
Filed Date: 8/30/21.
Accession Number: 20210830-5177.
Comment Date: 5 p.m. ET 9/20/21.
Docket Numbers: EC21-124-000.
Applicants: Gruver Wind Interconnection, LLC, Gruver Wind, LLC,
KODE Novus I, LLC.
Description: Joint Application for Authorization Under Section 203
of the Federal Power Act of Gruver Wind Interconnection, LLC, et al.
Filed Date: 9/1/21.
Accession Number: 20210901-5234.
Comment Date: 5 p.m. ET 9/22/21.
[[Page 50341]]
Take notice that the Commission received the following Complaints
and Compliance filings in EL Dockets:
Docket Numbers: EL21-100-000.
Applicants: Nebraska Public Power District v. Tri-State Generation
and Transmission Association, Inc., and Southwest Power Pool, Inc.
Description: Complaint of Nebraska Public Power District.
Filed Date: 9/1/21.
Accession Number: 20210901-5220.
Comment Date: 5 p.m. ET 9/21/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER20-676-005.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Compliance filing: Settlement Compliance Filing to be
effective 3/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901-5169.
Comment Date: 5 p.m. ET 9/22/21.
Docket Numbers: ER21-2438-001.
Applicants: Southwest Power Pool, Inc.
Description: Tariff Amendment: 3630SR1 Maverick Wind Project GIA to
be effective 6/29/2021.
Filed Date: 9/2/21.
Accession Number: 20210902-5083.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21-2490-001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment: Errata to Amendment to ISA No.2967,
in Docket No. ER21-2490-000 to be effective 6/17/2011.
Filed Date: 9/2/21.
Accession Number: 20210902-5090.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21-2818-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Revisions to Rate Schedule
FERC No. 281 (Modified CTP Methodology) to be effective 11/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901-5171.
Comment Date: 5 p.m. ET 9/22/21.
Docket Numbers: ER21-2819-000.
Applicants: South Field Energy LLC.
Description: Sec. 205(d) Rate Filing: Reactive Power Rate Schedule
and Request for Waiver and Expedited Action to be effective 10/1/2021.
Filed Date: 9/2/21.
Accession Number: 20210902-5000.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21-2820-000.
Applicants: York Generation Company LLC.
Description: Tariff Amendment: Notice of Cancellation to be
effective 9/20/2021.
Filed Date: 9/2/21.
Accession Number: 20210902-5033.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21-2821-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 3558R1 WAPA, MDU & MISO
Interconnection Agreement to be effective 12/31/9998.
Filed Date: 9/2/21.
Accession Number: 20210902-5046.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21-2822-000.
Applicants: Commonwealth Edison Company, PJM Interconnection,
L.L.C.
Description: Sec. 205(d) Rate Filing: Commonwealth Edison Company
submits tariff filing per 35.13(a)(2)(iii): ComEd submits revisions to
Att. H-13 re: Sterling Rail, L.L.C. to be effective 9/3/2021.
Filed Date: 9/2/21.
Accession Number: 20210902-5078.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21-2823-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2021-09-02_SA 3313 WAPA-MDU
1st Revised Interconnection Agreement to be effective 12/31/9998.
Filed Date: 9/2/21.
Accession Number: 20210902-5113.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21-2824-000.
Applicants: Duke Energy Carolinas, LLC.
Description: Tariff Amendment: DEC-Broad River Energy, LLC SA No.
240--Notice of Cancellation to be effective 11/2/2021.
Filed Date: 9/2/21.
Accession Number: 20210902-5117.
Comment Date: 5 p.m. ET 9/23/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: September 2, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-19458 Filed 9-7-21; 8:45 am]
BILLING CODE 6717-01-P