Download as PDF 50340 Federal Register / Vol. 86, No. 171 / Wednesday, September 8, 2021 / Notices all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ ferc-online/overview to register for eSubscription. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC website (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ (i.e., CP20–48), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC website also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: September 2, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–19456 Filed 9–7–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 10489–020] City of River Falls Municipal Utilities; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent License. b. Project No.: 10489–020. c. Date Filed: August 26, 2021. d. Applicant: City of River Falls Municipal Utilities (City of River Falls). e. Name of Project: River Falls Hydroelectric Project (River Falls Project). f. Location: The River Falls Project is located on the Kinnickinnic River in the City of River Falls in Pierce County, Wisconsin. The project does not occupy federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Kevin Westhuis, Utility Director of the City of River Falls Municipal Utilities; kwesthuis@rfcity.org (preferred contact) or (715) 426–3442. i. FERC Contact: Shana Wiseman at (202) 502–8736 or email at shana.wiseman@ferc.gov. j. This application is not ready for environmental analysis at this time. k. The River Falls Project consists of: (1) A 140-foot-long, 32-foot-high concrete dam; (2) an impoundment with a surface area of 15.5 acres; (3) a 200foot-long, 6-foot-diameter penstock; (4) a powerhouse containing one generating unit rated at 250 kilowatts; (5) a 50-footlong transmission line; and (6) appurtenant facilities. The River Falls Project is operated in a run-of-river mode with an estimated annual energy production of approximately 1,220,000 kilowatt hours. The City of River Falls proposes to continue operating the project as a runof-river facility and does not propose any new construction to the project. l. A copy of the application can be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19) issued on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Milestone Target date Issue Deficiency Letter (if necessary) .......................................................................................................................................... Request Additional Information .................................................................................................................................................... Notice of Acceptance/Notice of Ready for Environmental Analysis ............................................................................................ o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. jbell on DSKJLSW7X2PROD with NOTICES Dated: September 2, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–19454 Filed 9–7–21; 8:45 am] 17:21 Sep 07, 2021 Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC06–129–008. Applicants: Capital Research and Management Company. Description: Request for Extension of Blanket Authorization Under Section 203 of the Federal Power Act of Capital BILLING CODE 6717–01–P VerDate Sep<11>2014 DEPARTMENT OF ENERGY Jkt 253001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 September 2021. October 2021. February 2021. Research and Management Company, et al. Filed Date: 8/30/21. Accession Number: 20210830–5177. Comment Date: 5 p.m. ET 9/20/21. Docket Numbers: EC21–124–000. Applicants: Gruver Wind Interconnection, LLC, Gruver Wind, LLC, KODE Novus I, LLC. Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Gruver Wind Interconnection, LLC, et al. Filed Date: 9/1/21. Accession Number: 20210901–5234. Comment Date: 5 p.m. ET 9/22/21. E:\FR\FM\08SEN1.SGM 08SEN1 jbell on DSKJLSW7X2PROD with NOTICES Federal Register / Vol. 86, No. 171 / Wednesday, September 8, 2021 / Notices Take notice that the Commission received the following Complaints and Compliance filings in EL Dockets: Docket Numbers: EL21–100–000. Applicants: Nebraska Public Power District v. Tri-State Generation and Transmission Association, Inc., and Southwest Power Pool, Inc. Description: Complaint of Nebraska Public Power District. Filed Date: 9/1/21. Accession Number: 20210901–5220. Comment Date: 5 p.m. ET 9/21/21. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER20–676–005. Applicants: Tri-State Generation and Transmission Association, Inc. Description: Compliance filing: Settlement Compliance Filing to be effective 3/1/2021. Filed Date: 9/1/21. Accession Number: 20210901–5169. Comment Date: 5 p.m. ET 9/22/21. Docket Numbers: ER21–2438–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 3630SR1 Maverick Wind Project GIA to be effective 6/29/2021. Filed Date: 9/2/21. Accession Number: 20210902–5083. Comment Date: 5 p.m. ET 9/23/21. Docket Numbers: ER21–2490–001. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Errata to Amendment to ISA No.2967, in Docket No. ER21–2490–000 to be effective 6/17/2011. Filed Date: 9/2/21. Accession Number: 20210902–5090. Comment Date: 5 p.m. ET 9/23/21. Docket Numbers: ER21–2818–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Revisions to Rate Schedule FERC No. 281 (Modified CTP Methodology) to be effective 11/1/2021. Filed Date: 9/1/21. Accession Number: 20210901–5171. Comment Date: 5 p.m. ET 9/22/21. Docket Numbers: ER21–2819–000. Applicants: South Field Energy LLC. Description: § 205(d) Rate Filing: Reactive Power Rate Schedule and Request for Waiver and Expedited Action to be effective 10/1/2021. Filed Date: 9/2/21. Accession Number: 20210902–5000. Comment Date: 5 p.m. ET 9/23/21. Docket Numbers: ER21–2820–000. Applicants: York Generation Company LLC. Description: Tariff Amendment: Notice of Cancellation to be effective 9/ 20/2021. VerDate Sep<11>2014 17:21 Sep 07, 2021 Jkt 253001 Filed Date: 9/2/21. Accession Number: 20210902–5033. Comment Date: 5 p.m. ET 9/23/21. Docket Numbers: ER21–2821–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3558R1 WAPA, MDU & MISO Interconnection Agreement to be effective 12/31/9998. Filed Date: 9/2/21. Accession Number: 20210902–5046. Comment Date: 5 p.m. ET 9/23/21. Docket Numbers: ER21–2822–000. Applicants: Commonwealth Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Commonwealth Edison Company submits tariff filing per 35.13(a)(2)(iii): ComEd submits revisions to Att. H–13 re: Sterling Rail, L.L.C. to be effective 9/ 3/2021. Filed Date: 9/2/21. Accession Number: 20210902–5078. Comment Date: 5 p.m. ET 9/23/21. Docket Numbers: ER21–2823–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2021–09–02_SA 3313 WAPA–MDU 1st Revised Interconnection Agreement to be effective 12/31/9998. Filed Date: 9/2/21. Accession Number: 20210902–5113. Comment Date: 5 p.m. ET 9/23/21. Docket Numbers: ER21–2824–000. Applicants: Duke Energy Carolinas, LLC. Description: Tariff Amendment: DECBroad River Energy, LLC SA No. 240— Notice of Cancellation to be effective 11/ 2/2021. Filed Date: 9/2/21. Accession Number: 20210902–5117. Comment Date: 5 p.m. ET 9/23/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 50341 Dated: September 2, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–19458 Filed 9–7–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1121–132] Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for Temporary Variance of Flow Requirements. b. Project No: 1121–132. c. Date Filed: August 25, 2021. d. Applicant: Pacific Gas and Electric Company (licensee). e. Name of Project: Battle Creek Hydroelectric Project. f. Location: The project is located on Battle Creek and its tributaries in Shasta and Tehama counties, California. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Ms. Megan Young, License Coordinator, Pacific Gas and Electric Company, Mail Code: N11D, P.O. Box 770000, San Francisco, CA 94177, Phone: (530) 364–6009. i. FERC Contact: John Aedo, (415) 369–3335, john.aedo@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: September 21, 2021. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. E:\FR\FM\08SEN1.SGM 08SEN1

Agencies

[Federal Register Volume 86, Number 171 (Wednesday, September 8, 2021)]
[Notices]
[Pages 50340-50341]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-19458]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC06-129-008.
    Applicants: Capital Research and Management Company.
    Description: Request for Extension of Blanket Authorization Under 
Section 203 of the Federal Power Act of Capital Research and Management 
Company, et al.
    Filed Date: 8/30/21.
    Accession Number: 20210830-5177.
    Comment Date: 5 p.m. ET 9/20/21.

    Docket Numbers: EC21-124-000.
    Applicants: Gruver Wind Interconnection, LLC, Gruver Wind, LLC, 
KODE Novus I, LLC.
    Description: Joint Application for Authorization Under Section 203 
of the Federal Power Act of Gruver Wind Interconnection, LLC, et al.
    Filed Date: 9/1/21.
    Accession Number: 20210901-5234.
    Comment Date: 5 p.m. ET 9/22/21.


[[Page 50341]]


    Take notice that the Commission received the following Complaints 
and Compliance filings in EL Dockets:

    Docket Numbers: EL21-100-000.
    Applicants: Nebraska Public Power District v. Tri-State Generation 
and Transmission Association, Inc., and Southwest Power Pool, Inc.
    Description: Complaint of Nebraska Public Power District.
    Filed Date: 9/1/21.
    Accession Number: 20210901-5220.
    Comment Date: 5 p.m. ET 9/21/21.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER20-676-005.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Compliance filing: Settlement Compliance Filing to be 
effective 3/1/2021.
    Filed Date: 9/1/21.
    Accession Number: 20210901-5169.
    Comment Date: 5 p.m. ET 9/22/21.

    Docket Numbers: ER21-2438-001.
    Applicants: Southwest Power Pool, Inc.
    Description: Tariff Amendment: 3630SR1 Maverick Wind Project GIA to 
be effective 6/29/2021.
    Filed Date: 9/2/21.
    Accession Number: 20210902-5083.
    Comment Date: 5 p.m. ET 9/23/21.

    Docket Numbers: ER21-2490-001.
    Applicants: PJM Interconnection, L.L.C.
    Description: Tariff Amendment: Errata to Amendment to ISA No.2967, 
in Docket No. ER21-2490-000 to be effective 6/17/2011.
    Filed Date: 9/2/21.
    Accession Number: 20210902-5090.
    Comment Date: 5 p.m. ET 9/23/21.

    Docket Numbers: ER21-2818-000.
    Applicants: Tri-State Generation and Transmission Association, Inc.
    Description: Sec.  205(d) Rate Filing: Revisions to Rate Schedule 
FERC No. 281 (Modified CTP Methodology) to be effective 11/1/2021.
    Filed Date: 9/1/21.
    Accession Number: 20210901-5171.
    Comment Date: 5 p.m. ET 9/22/21.

    Docket Numbers: ER21-2819-000.
    Applicants: South Field Energy LLC.
    Description: Sec.  205(d) Rate Filing: Reactive Power Rate Schedule 
and Request for Waiver and Expedited Action to be effective 10/1/2021.
    Filed Date: 9/2/21.
    Accession Number: 20210902-5000.
    Comment Date: 5 p.m. ET 9/23/21.

    Docket Numbers: ER21-2820-000.
    Applicants: York Generation Company LLC.
    Description: Tariff Amendment: Notice of Cancellation to be 
effective 9/20/2021.
    Filed Date: 9/2/21.
    Accession Number: 20210902-5033.
    Comment Date: 5 p.m. ET 9/23/21.

    Docket Numbers: ER21-2821-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3558R1 WAPA, MDU & MISO 
Interconnection Agreement to be effective 12/31/9998.
    Filed Date: 9/2/21.
    Accession Number: 20210902-5046.
    Comment Date: 5 p.m. ET 9/23/21.

    Docket Numbers: ER21-2822-000.
    Applicants: Commonwealth Edison Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: Commonwealth Edison Company 
submits tariff filing per 35.13(a)(2)(iii): ComEd submits revisions to 
Att. H-13 re: Sterling Rail, L.L.C. to be effective 9/3/2021.
    Filed Date: 9/2/21.
    Accession Number: 20210902-5078.
    Comment Date: 5 p.m. ET 9/23/21.

    Docket Numbers: ER21-2823-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2021-09-02_SA 3313 WAPA-MDU 
1st Revised Interconnection Agreement to be effective 12/31/9998.
    Filed Date: 9/2/21.
    Accession Number: 20210902-5113.
    Comment Date: 5 p.m. ET 9/23/21.

    Docket Numbers: ER21-2824-000.
    Applicants: Duke Energy Carolinas, LLC.
    Description: Tariff Amendment: DEC-Broad River Energy, LLC SA No. 
240--Notice of Cancellation to be effective 11/2/2021.
    Filed Date: 9/2/21.
    Accession Number: 20210902-5117.
    Comment Date: 5 p.m. ET 9/23/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: September 2, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-19458 Filed 9-7-21; 8:45 am]