Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 50341-50342 [2021-19358]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 171 / Wednesday, September 8, 2021 / Notices
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL21–100–000.
Applicants: Nebraska Public Power
District v. Tri-State Generation and
Transmission Association, Inc., and
Southwest Power Pool, Inc.
Description: Complaint of Nebraska
Public Power District.
Filed Date: 9/1/21.
Accession Number: 20210901–5220.
Comment Date: 5 p.m. ET 9/21/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–676–005.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: Compliance filing:
Settlement Compliance Filing to be
effective 3/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5169.
Comment Date: 5 p.m. ET 9/22/21.
Docket Numbers: ER21–2438–001.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
3630SR1 Maverick Wind Project GIA to
be effective 6/29/2021.
Filed Date: 9/2/21.
Accession Number: 20210902–5083.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2490–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment: Errata
to Amendment to ISA No.2967, in
Docket No. ER21–2490–000 to be
effective 6/17/2011.
Filed Date: 9/2/21.
Accession Number: 20210902–5090.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2818–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Revisions to Rate Schedule FERC No.
281 (Modified CTP Methodology) to be
effective 11/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5171.
Comment Date: 5 p.m. ET 9/22/21.
Docket Numbers: ER21–2819–000.
Applicants: South Field Energy LLC.
Description: § 205(d) Rate Filing:
Reactive Power Rate Schedule and
Request for Waiver and Expedited
Action to be effective 10/1/2021.
Filed Date: 9/2/21.
Accession Number: 20210902–5000.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2820–000.
Applicants: York Generation
Company LLC.
Description: Tariff Amendment:
Notice of Cancellation to be effective 9/
20/2021.
VerDate Sep<11>2014
17:21 Sep 07, 2021
Jkt 253001
Filed Date: 9/2/21.
Accession Number: 20210902–5033.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2821–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3558R1 WAPA, MDU & MISO
Interconnection Agreement to be
effective 12/31/9998.
Filed Date: 9/2/21.
Accession Number: 20210902–5046.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2822–000.
Applicants: Commonwealth Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Commonwealth Edison Company
submits tariff filing per 35.13(a)(2)(iii):
ComEd submits revisions to Att. H–13
re: Sterling Rail, L.L.C. to be effective 9/
3/2021.
Filed Date: 9/2/21.
Accession Number: 20210902–5078.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2823–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–09–02_SA 3313 WAPA–MDU 1st
Revised Interconnection Agreement to
be effective 12/31/9998.
Filed Date: 9/2/21.
Accession Number: 20210902–5113.
Comment Date: 5 p.m. ET 9/23/21.
Docket Numbers: ER21–2824–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: Tariff Amendment: DECBroad River Energy, LLC SA No. 240—
Notice of Cancellation to be effective 11/
2/2021.
Filed Date: 9/2/21.
Accession Number: 20210902–5117.
Comment Date: 5 p.m. ET 9/23/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
50341
Dated: September 2, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–19458 Filed 9–7–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1121–132]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Application for
Temporary Variance of Flow
Requirements.
b. Project No: 1121–132.
c. Date Filed: August 25, 2021.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Project: Battle Creek
Hydroelectric Project.
f. Location: The project is located on
Battle Creek and its tributaries in Shasta
and Tehama counties, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ms. Megan
Young, License Coordinator, Pacific Gas
and Electric Company, Mail Code:
N11D, P.O. Box 770000, San Francisco,
CA 94177, Phone: (530) 364–6009.
i. FERC Contact: John Aedo, (415)
369–3335, john.aedo@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 21, 2021.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
E:\FR\FM\08SEN1.SGM
08SEN1
jbell on DSKJLSW7X2PROD with NOTICES
50342
Federal Register / Vol. 86, No. 171 / Wednesday, September 8, 2021 / Notices
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–1121–132. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee requests a temporary variance
of the minimum flow requirements at
three project locations, including North
Fork Battle Creek below North Battle
Creek Dam, North Fork Battle Creek
below Macumber Reservoir, and Battle
Creek below Coleman Powerhouse.
Specifically, the licensee requests
Commission approval to reduce flows
below North Battle Creek Reservoir and
Macumber Reservoir from a 0.3 cubic
feet per second (cfs) instantaneous
requirement to a 24-hour average flow.
Similarly, the licensee proposes to
reduce flows in Battle Creek from a 150
cfs instantaneous minimum flow to a
24-hour average flow. The licensee
states that the flow modification would
conserve limited water resources during
the current drought conditions and to
maintain reservoir elevation and water
quality in project reservoirs. The
licensee requests the variance through
October 31, 2021.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
VerDate Sep<11>2014
17:21 Sep 07, 2021
Jkt 253001
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: September 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–19358 Filed 9–7–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP21–1086–000.
Applicants: Alliance Pipeline L.P.
Description: § 4(d) Rate Filing:
Negotiated Rates—Various September 1
Capacity Releases to be effective 9/1/
2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5072.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: RP21–1087–000.
Applicants: Equitrans, L.P.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Description: § 4(d) Rate Filing:
Negotiated Rate Capacity Release
Agreements—9/1/2021 to be effective 9/
1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5075.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: RP21–1088–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmts (Marathon releasese
effective 9–1–2021) to be effective 9/1/
2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5090.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: RP21–1089–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rate—UGI Energy 8967380
eff 09–01–2021 to be effective 9/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5092.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: RP21–1090–000.
Applicants: NEXUS Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Releases eff 09–01–
2021 to be effective 9/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5094.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: RP21–1091–000.
Applicants: NEXUS Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate—Amended DTE Gas
860003 eff 9–1–2021 to be effective 9/
1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5097.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: RP21–1092–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing:
Amendment to Neg Rate Agmt and Cap
Rel Agmt (Calyx 51762) to be effective
9/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5102.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: RP21–1093–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing: Adding
Firm PALS Option Under Rate Schedule
PHS to be effective 10/1/2021.
Filed Date: 9/1/21.
Accession Number: 20210901–5153.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: RP21–1094–000.
Applicants: NEXUS Gas
Transmission, LLC.
E:\FR\FM\08SEN1.SGM
08SEN1
Agencies
[Federal Register Volume 86, Number 171 (Wednesday, September 8, 2021)]
[Notices]
[Pages 50341-50342]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-19358]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1121-132]
Pacific Gas and Electric Company; Notice of Application Accepted
for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Temporary Variance of Flow
Requirements.
b. Project No: 1121-132.
c. Date Filed: August 25, 2021.
d. Applicant: Pacific Gas and Electric Company (licensee).
e. Name of Project: Battle Creek Hydroelectric Project.
f. Location: The project is located on Battle Creek and its
tributaries in Shasta and Tehama counties, California.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Ms. Megan Young, License Coordinator, Pacific
Gas and Electric Company, Mail Code: N11D, P.O. Box 770000, San
Francisco, CA 94177, Phone: (530) 364-6009.
i. FERC Contact: John Aedo, (415) 369-3335, [email protected].
j. Deadline for filing comments, motions to intervene, and
protests: September 21, 2021.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
[[Page 50342]]
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include the docket number P-1121-132. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee requests a temporary
variance of the minimum flow requirements at three project locations,
including North Fork Battle Creek below North Battle Creek Dam, North
Fork Battle Creek below Macumber Reservoir, and Battle Creek below
Coleman Powerhouse. Specifically, the licensee requests Commission
approval to reduce flows below North Battle Creek Reservoir and
Macumber Reservoir from a 0.3 cubic feet per second (cfs) instantaneous
requirement to a 24-hour average flow. Similarly, the licensee proposes
to reduce flows in Battle Creek from a 150 cfs instantaneous minimum
flow to a 24-hour average flow. The licensee states that the flow
modification would conserve limited water resources during the current
drought conditions and to maintain reservoir elevation and water
quality in project reservoirs. The licensee requests the variance
through October 31, 2021.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: September 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-19358 Filed 9-7-21; 8:45 am]