Southern Nuclear Operating Company, Inc; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria, 50381-50382 [2021-19306]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 171 / Wednesday, September 8, 2021 / Notices
experience in seismic analysis. The
candidates must also have at least 20
years of education and experience and
a distinguished record of achievement
in one or more areas of nuclear science
and technology or related engineering
disciplines. Candidates with pertinent
graduate level experience will be given
additional consideration.
Consistent with the requirements of
the Federal Advisory Committee Act,
the Commission seeks candidates with
diverse backgrounds, so that the
membership on the Committee is fairly
balanced in terms of the points of view
represented and functions to be
performed by the Committee.
Candidates will undergo a thorough
security background check to obtain the
security clearance that is mandatory for
all ACRS members. The security
background check will involve the
completion and submission of
paperwork to the NRC.
Candidates for ACRS appointment
may be involved in or have financial
interests related to NRC-regulated
aspects of the nuclear industry.
However, because conflict-of-interest
considerations may restrict the
participation of a candidate in ACRS
activities, the degree and nature of any
such restriction on an individual’s
activities as a member will be
considered in the selection process.
Each qualified candidate’s financial
interests must be reconciled with
applicable Federal and NRC rules and
regulations prior to final appointment.
This might require divestiture of
securities or discontinuance of certain
contracts or grants. Information
regarding these restrictions will be
provided upon request. As a part of the
Stop Trading on Congressional
Knowledge Act of 2012, which bans
insider trading by members of Congress,
their staff, and other high-level federal
employees, candidates for appointments
will be required to disclose additional
financial transactions.
A resume describing the educational
and professional background of each
candidate, including any special
accomplishments, publications, and
professional references should be
provided. Candidates should provide
their current address, telephone
number, and email address. All
candidates will receive careful
consideration. Appointment will be
made without regard to factors such as
race, color, religion, national origin, sex,
age, or disabilities. Candidates must be
citizens of the United States and be able
to devote approximately 100 days per
year to Committee business, but may not
be compensated for more than 130
calendar days. As a part of ACRS’
VerDate Sep<11>2014
17:21 Sep 07, 2021
Jkt 253001
transformative practice, appointees may
be able to virtually devote some of the
130 days to Committee business.
Resumes will be accepted until
December 7, 2021.
Dated: September 1, 2021.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
[FR Doc. 2021–19179 Filed 9–7–21; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2008–0252]
Southern Nuclear Operating Company,
Inc; Vogtle Electric Generating Plant,
Units 3 and 4; Inspections, Tests,
Analyses, and Acceptance Criteria
Nuclear Regulatory
Commission.
ACTION: Determination of the successful
completion of inspections, tests, and
analyses.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has determined
that specified inspections, tests, and
analyses have been successfully
completed, and that specified
acceptance criteria are met for the
Vogtle Electric Generating Plant (VEGP),
Units 3 and 4. The NRC staff is also
rescinding a prior determination of the
successful completion of particular
inspections, tests, analyses, and
acceptance criteria (ITAAC) for VEGP
Units 3 and 4.
DATES: Determinations of the successful
completion of inspections, tests, and
analyses for VEGP Units 3 and 4 are
effective on the dates indicated in the
NRC staff’s verification evaluation forms
for the ITAAC. The NRC staff’s
rescission of its prior determination of
the successful completion of particular
ITAAC for VEGP Units 3 and 4 was
effective on August 12, 2021.
ADDRESSES: Please refer to Docket ID
NRC–2008–0252 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly available
information related to this document
using any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2008–0252. Address
questions about Docket IDs in
Regulations.gov to Stacy Schumann;
telephone: 301–415–0624; email:
Stacy.Schumann@nrc.gov. For technical
questions, contact the individual listed
SUMMARY:
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
50381
in the FOR FURTHER INFORMATION
CONTACT section of this document.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number
for each document referenced in this
document (if that document is available
in ADAMS) is provided the first time
that a document is referenced.
• Attention: The PDR, where you may
examine and order copies of public
documents, is currently closed. You
may submit your request to the PDR via
email at pdr.resource@nrc.gov or call
1–800–397–4209 or 301–415–4737,
between 8:00 a.m. and 4:00 p.m. (ET),
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT:
Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
7270, email: Cayetano.Santos@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion
of ITAAC
Southern Nuclear Operating
Company, Inc. (SNC) (hereafter called
the licensee) has submitted ITAAC
closure notifications (ICNs) under
section 52.99(c)(1) of title 10 of the Code
of Federal Regulations (10 CFR),
informing the NRC that the licensee has
successfully performed the required
inspections, tests, and analyses, and that
the acceptance criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.09c (44), 2.1.02.12a.iii (55),
2.1.02.13a (63), 2.1.02.13b (64),
2.1.02.14 (66), 2.2.01.01 (90),
2.2.04.09a.ii (241), 2.2.05.02a (253),
2.3.02.08a.i (301), 2.3.02.14 (317),
2.3.04.05 (332), 2.3.06.11a (382),
2.3.07.05.i (396), 2.3.13.08 (470),
2.3.29.02 (489), 2.4.01.02 (493),
2.5.01.03a (511), 2.5.01.04 (519),
C.2.5.04.04a (561), 2.5.06.02 (574),
2.6.03.05d.i (613), C.2.6.09.05a (664),
C.2.6.09.06 (666), 2.7.03.03 (710),
2.7.07.02 (732), 3.2.00.04 (751),
3.3.00.02a.i.a (760), and 2.3.10.12 (879).
VEGP Unit 4 ITAAC
2.2.03.08c.iv.01 (183), 2.2.03.08c.iv.02
(184), 2.2.03.08c.iv.03 (185),
E:\FR\FM\08SEN1.SGM
08SEN1
50382
Federal Register / Vol. 86, No. 171 / Wednesday, September 8, 2021 / Notices
2.3.07.07b.ii (403), and 3.3.00.02a.ii.f
(769).
The ITAAC for VEGP Unit 3 are in
Appendix C of the VEGP Unit 3
combined license (ADAMS Accession
No. ML14100A106). The ITAAC for
VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license (ADAMS
Accession No. ML14100A135).
jbell on DSKJLSW7X2PROD with NOTICES
II. Licensee ITAAC Post-Closure
Notifications (IPCNs)
Since the last Federal Register notice
of the NRC staff’s determinations of
successful completion of inspections,
tests, and analyses for VEGP Units 3 and
4 (86 FR 23756; May 4, 2021), the NRC
staff has not made additional
determinations of the successful
completion of inspections, tests, and
analyses based on licensee IPCNs
submitted under 10 CFR 52.99(c)(2).
III. NRC Staff Determination of
Completion of ITAAC
The NRC staff has determined that the
specified inspections, tests, and
analyses have been successfully
completed, and that the specified
acceptance criteria are met. The
documentation of the NRC staff’s
determination is in the ITAAC Closure
Verification Evaluation Form (VEF) for
each ITAAC. The VEF is a form that
represents the NRC staff’s structured
process for reviewing ICNs and IPCNs.
Each ICN presents a narrative
description of how the ITAAC was
completed. The NRC’s ICN review
process involves a determination on
whether, among other things: (1) Each
ICN provides sufficient information,
including a summary of the
methodology used to perform the
ITAAC, to demonstrate that the
inspections, tests, and analyses have
been successfully completed; (2) each
ICN provides sufficient information to
demonstrate that the acceptance criteria
of the ITAAC are met; and (3) any NRC
inspections for the ITAAC have been
completed and any ITAAC findings
associated with that ITAAC have been
closed. The NRC’s review process for
IPCNs is similar to that for ICNs but
focuses on how the licensee addressed
the new, material information giving
rise to the IPCN.
The NRC staff’s determination of the
successful completion of these ITAAC is
based on information available at this
time and is subject to the licensee’s
ability to maintain the condition that
the acceptance criteria are met. If the
NRC staff receives new information that
suggests the NRC staff’s determination
on any of these ITAAC is incorrect, then
the NRC staff will determine whether to
reopen that ITAAC (including
VerDate Sep<11>2014
17:21 Sep 07, 2021
Jkt 253001
withdrawing the NRC staff’s
determination on that ITAAC). The NRC
staff’s determination will be used to
support a subsequent finding, pursuant
to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria
in the combined license are met. The
ITAAC closure process is not finalized
for these ITAAC until the NRC makes an
affirmative finding under 10 CFR
52.103(g). Any future updates to the
status of these ITAAC can be found by
selecting the link ‘‘ITAAC Status
Report’’ on the NRC’s websites: https://
www.nrc.gov/reactors/new-reactors/colholder/vog3.html and https://
www.nrc.gov/reactors/new-reactors/colholder/vog4.html.
This notice fulfills the NRC staff’s
obligations under 10 CFR 52.99(e)(1) to
publish a notice in the Federal Register
of the NRC staff’s determination of the
successful completion of inspections,
tests, and analyses.
Note: As of August 12, 2021, NRC staff
rescinds its previous determination of the
successful completion of ITAAC 2.5.05.03b
(570) for both VEGP Units 3 and 4 due to the
subsequent determination by NRC staff that
this ITAAC is not met for both units. The
NRC’s prior determination of the successful
completion of ITAAC 2.5.05.03b (570) was
originally published in the Federal Register
(85 FR 67017) on October 21, 2020. The
licensee will resubmit the ICNs related to
ITAAC 2.5.05.03b (570) for both Units.
Vogtle Electric Generating Plant Unit 3,
Docket No. 5200025
A complete list of the review status
for VEGP Unit 3 ITAAC, including the
submission date and ADAMS accession
number for each ICN received, the
ADAMS accession number for each
VEF, and the ADAMS accession
numbers for the inspection reports
associated with these specific ITAAC
can be found by selecting the link
‘‘ITAAC Status Report’’ at the NRC’s
website https://www.nrc.gov/reactors/
new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4,
Docket No. 5200026
A complete list of the review status
for VEGP Unit 4 ITAAC, including the
submission date and ADAMS accession
number for each ICN and IPCN received,
the ADAMS accession number for each
VEF, and the ADAMS accession
numbers for the inspection reports
associated with these specific ITAAC,
can be found by selecting the link
‘‘ITAAC Status Report’’ at the NRC’s
website https://www.nrc.gov/reactors/
new-reactors/col-holder/vog4.html.
Dated: September 1, 2021.
PO 00000
Frm 00060
Fmt 4703
Sfmt 4703
For the Nuclear Regulatory Commission.
Philip J. McKenna,
Acting Chief, Vogtle Project Office, Office of
Nuclear Reactor Regulation.
[FR Doc. 2021–19306 Filed 9–7–21; 8:45 am]
BILLING CODE 7590–01–P
OFFICE OF PERSONNEL
MANAGEMENT
Federal Employees’ Group Life
Insurance Program; Premium
Office of Personnel
Management.
ACTION: Notice.
AGENCY:
The Office of Personnel
Management (OPM) is announcing
changes in premium rates for certain
Federal Employees’ Group Life
Insurance (FEGLI) categories. These
include changes to premium rates for
Employee Basic Insurance, Option A
(most age bands), Option B (most age
bands), Option C (most age bands), and
Post-Retirement Basic Insurance. These
rates will be effective the first pay
period beginning on or after October 1,
2021.
DATES: These rates will be effective the
first pay period beginning on or after
October 1, 2021.
FOR FURTHER INFORMATION CONTACT:
Marthine Mason-Martin, FEGLI@
opm.gov, (202) 606–1413.
SUPPLEMENTARY INFORMATION: This
notice announces changes to FEGLI
Employee Basic, Option A (most age
bands), Option B (most age bands),
Option C (most age bands), and PostRetirement Basic Insurance.
FEGLI premium rates are assessed
based on Program experience in
accordance with FEGLI statutes at
8711(b), 8714a(e), 8714b(e), and
8714c(e), and OPM’s Annual FEGLI Rate
Review Process. The premium rates in
the FEGLI program represent estimates
of premium income necessary to pay
future expected benefits costs. The rates
for all coverage categories are specific to
the experience of the FEGLI group and
are not based on mortality rates within
the general population. Actuarial
analysis of changing mortality rates
makes periodic premium adjustments
necessary.
OPM has completed a study of
funding and claims experience within
the FEGLI Program. Based on this
updated actuarial analysis of actual
claims experience, OPM has determined
that changes are required to Employee
Basic, Option A, Option B, Option C
and Post-Retirement Basic Insurance
premiums. These changes reflect
SUMMARY:
E:\FR\FM\08SEN1.SGM
08SEN1
Agencies
[Federal Register Volume 86, Number 171 (Wednesday, September 8, 2021)]
[Notices]
[Pages 50381-50382]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-19306]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 52-025 and 52-026; NRC-2008-0252]
Southern Nuclear Operating Company, Inc; Vogtle Electric
Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and
Acceptance Criteria
AGENCY: Nuclear Regulatory Commission.
ACTION: Determination of the successful completion of inspections,
tests, and analyses.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
determined that specified inspections, tests, and analyses have been
successfully completed, and that specified acceptance criteria are met
for the Vogtle Electric Generating Plant (VEGP), Units 3 and 4. The NRC
staff is also rescinding a prior determination of the successful
completion of particular inspections, tests, analyses, and acceptance
criteria (ITAAC) for VEGP Units 3 and 4.
DATES: Determinations of the successful completion of inspections,
tests, and analyses for VEGP Units 3 and 4 are effective on the dates
indicated in the NRC staff's verification evaluation forms for the
ITAAC. The NRC staff's rescission of its prior determination of the
successful completion of particular ITAAC for VEGP Units 3 and 4 was
effective on August 12, 2021.
ADDRESSES: Please refer to Docket ID NRC-2008-0252 when contacting the
NRC about the availability of information regarding this document. You
may obtain publicly available information related to this document
using any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2008-0252. Address
questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 301-415-0624; email: [email protected]. For technical
questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The ADAMS accession number for each
document referenced in this document (if that document is available in
ADAMS) is provided the first time that a document is referenced.
Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at [email protected] or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through
Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: Cayetano Santos, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-7270, email: [email protected].
SUPPLEMENTARY INFORMATION:
I. Licensee Notification of Completion of ITAAC
Southern Nuclear Operating Company, Inc. (SNC) (hereafter called
the licensee) has submitted ITAAC closure notifications (ICNs) under
section 52.99(c)(1) of title 10 of the Code of Federal Regulations (10
CFR), informing the NRC that the licensee has successfully performed
the required inspections, tests, and analyses, and that the acceptance
criteria are met for:
VEGP Unit 3 ITAAC
2.1.02.09c (44), 2.1.02.12a.iii (55), 2.1.02.13a (63), 2.1.02.13b
(64), 2.1.02.14 (66), 2.2.01.01 (90), 2.2.04.09a.ii (241), 2.2.05.02a
(253), 2.3.02.08a.i (301), 2.3.02.14 (317), 2.3.04.05 (332), 2.3.06.11a
(382), 2.3.07.05.i (396), 2.3.13.08 (470), 2.3.29.02 (489), 2.4.01.02
(493), 2.5.01.03a (511), 2.5.01.04 (519), C.2.5.04.04a (561), 2.5.06.02
(574), 2.6.03.05d.i (613), C.2.6.09.05a (664), C.2.6.09.06 (666),
2.7.03.03 (710), 2.7.07.02 (732), 3.2.00.04 (751), 3.3.00.02a.i.a
(760), and 2.3.10.12 (879).
VEGP Unit 4 ITAAC
2.2.03.08c.iv.01 (183), 2.2.03.08c.iv.02 (184), 2.2.03.08c.iv.03
(185),
[[Page 50382]]
2.3.07.07b.ii (403), and 3.3.00.02a.ii.f (769).
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license (ADAMS Accession No. ML14100A106). The ITAAC for VEGP
Unit 4 are in Appendix C of VEGP Unit 4 combined license (ADAMS
Accession No. ML14100A135).
II. Licensee ITAAC Post-Closure Notifications (IPCNs)
Since the last Federal Register notice of the NRC staff's
determinations of successful completion of inspections, tests, and
analyses for VEGP Units 3 and 4 (86 FR 23756; May 4, 2021), the NRC
staff has not made additional determinations of the successful
completion of inspections, tests, and analyses based on licensee IPCNs
submitted under 10 CFR 52.99(c)(2).
III. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests,
and analyses have been successfully completed, and that the specified
acceptance criteria are met. The documentation of the NRC staff's
determination is in the ITAAC Closure Verification Evaluation Form
(VEF) for each ITAAC. The VEF is a form that represents the NRC staff's
structured process for reviewing ICNs and IPCNs.
Each ICN presents a narrative description of how the ITAAC was
completed. The NRC's ICN review process involves a determination on
whether, among other things: (1) Each ICN provides sufficient
information, including a summary of the methodology used to perform the
ITAAC, to demonstrate that the inspections, tests, and analyses have
been successfully completed; (2) each ICN provides sufficient
information to demonstrate that the acceptance criteria of the ITAAC
are met; and (3) any NRC inspections for the ITAAC have been completed
and any ITAAC findings associated with that ITAAC have been closed. The
NRC's review process for IPCNs is similar to that for ICNs but focuses
on how the licensee addressed the new, material information giving rise
to the IPCN.
The NRC staff's determination of the successful completion of these
ITAAC is based on information available at this time and is subject to
the licensee's ability to maintain the condition that the acceptance
criteria are met. If the NRC staff receives new information that
suggests the NRC staff's determination on any of these ITAAC is
incorrect, then the NRC staff will determine whether to reopen that
ITAAC (including withdrawing the NRC staff's determination on that
ITAAC). The NRC staff's determination will be used to support a
subsequent finding, pursuant to 10 CFR 52.103(g), at the end of
construction that all acceptance criteria in the combined license are
met. The ITAAC closure process is not finalized for these ITAAC until
the NRC makes an affirmative finding under 10 CFR 52.103(g). Any future
updates to the status of these ITAAC can be found by selecting the link
``ITAAC Status Report'' on the NRC's websites: https://www.nrc.gov/reactors/new-reactors/col-holder/vog3.html and https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
This notice fulfills the NRC staff's obligations under 10 CFR
52.99(e)(1) to publish a notice in the Federal Register of the NRC
staff's determination of the successful completion of inspections,
tests, and analyses.
Note: As of August 12, 2021, NRC staff rescinds its previous
determination of the successful completion of ITAAC 2.5.05.03b (570)
for both VEGP Units 3 and 4 due to the subsequent determination by
NRC staff that this ITAAC is not met for both units. The NRC's prior
determination of the successful completion of ITAAC 2.5.05.03b (570)
was originally published in the Federal Register (85 FR 67017) on
October 21, 2020. The licensee will resubmit the ICNs related to
ITAAC 2.5.05.03b (570) for both Units.
Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC,
including the submission date and ADAMS accession number for each ICN
received, the ADAMS accession number for each VEF, and the ADAMS
accession numbers for the inspection reports associated with these
specific ITAAC can be found by selecting the link ``ITAAC Status
Report'' at the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC,
including the submission date and ADAMS accession number for each ICN
and IPCN received, the ADAMS accession number for each VEF, and the
ADAMS accession numbers for the inspection reports associated with
these specific ITAAC, can be found by selecting the link ``ITAAC Status
Report'' at the NRC's website https://www.nrc.gov/reactors/new-reactors/col-holder/vog4.html.
Dated: September 1, 2021.
For the Nuclear Regulatory Commission.
Philip J. McKenna,
Acting Chief, Vogtle Project Office, Office of Nuclear Reactor
Regulation.
[FR Doc. 2021-19306 Filed 9-7-21; 8:45 am]
BILLING CODE 7590-01-P