Roaring Fork Interstate Gas Transmission, LLC; Notice of Amendment to Application and Establishing Intervention Deadline, 50097-50098 [2021-19372]
Download as PDF
Federal Register / Vol. 86, No. 170 / Tuesday, September 7, 2021 / Notices
annually, and 4 hours and $332 per
response. The total estimated burdens
per year are 1,284 hours and $106,572.
These burdens are itemized in the
following table:
Number of
respondents
Annual
number of
responses per
respondent
Total
number of
responses
(column A
× column B)
Average
burden &
cost per
response 2
Total annual
burden hours
& total
annual cost
(column C
× column D)
Cost per
respondent
($)
(column E
÷ column A)
A.
B.
C.
D.
E.
F.
4 hrs.; $348 ......................................
1,284 hrs.; $111,708 ........................
321 .................
1
321
Comments are invited on: (1) Whether
the collection of information is
necessary for the proper performance of
the functions of the Commission,
including whether the information will
have practical utility; (2) the accuracy of
the agency’s estimate of the burden and
cost of the collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information collection; and
(4) ways to minimize the burden of the
collection of information on those who
are to respond, including the use of
automated collection techniques or
other forms of information technology.
Dated: September 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–19359 Filed 9–3–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–462–001]
Roaring Fork Interstate Gas
Transmission, LLC; Notice of
Amendment to Application and
Establishing Intervention Deadline
sradovich on DSKJLST7X2PROD with NOTICES
50097
Take notice that on August 26, 2021,
Roaring Fork Interstate Gas
Transmission, LLC (RFIGT), 1125 17th
Street, Suite 650, Denver, Colorado
80202, filed, pursuant to section 7(c) of
the Natural Gas Act (NGA) and Part 157
of the Commission’s regulations an
amendment to its application in Docket
No. CP21–462–000 to acquire certain
facilities from Kaiser-Frontier
Midstream, LLC in Laramie County,
Wyoming and Weld County, Colorado.
RFIGT filed revised versions of Exhibits
N, P, and S, which includes an
2 Commission staff estimates that the average
industry hourly cost for this information collection
is approximated by the current FERC 2021 average
hourly costs for wages and benefits, i.e., $87.00/
hour.
VerDate Sep<11>2014
00:30 Sep 04, 2021
Jkt 253001
acquisition adjustment in its rate base
and cost of service. Thus, RFIGT
amends its proposal to reflect a
maximum monthly reservation recourse
rate for Rate Schedule FT of $12.59 per
dekatherm (Dth) per month and a
commodity rate for interruptible
services under Rate Schedule IT to
$0.41 per Dth, all as more fully set forth
in the application which is on file with
the Commission and open for public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding RFIGT’s
application may be directed to Mark R.
Haskell, Counsel for Roaring Fork
Interstate Gas Transmission, LLC, Blank
Rome LLP, 1825 Eye Street NW,
Washington, DC 20006, by telephone at
(202) 420–2654 or by email at
mhaskell@blankrome.com.
Pursuant to Section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
Complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
1 18
PO 00000
CFR (Code of Federal Regulations) 157.9.
Frm 00086
Fmt 4703
Sfmt 4703
U:\07SEN1.SGM
$348
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on September 22, 2021.
How to file comments and motions to
intervene is explained below.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before September
22, 2021. However, the filing of a
comment alone will not serve to make
the filer a party to the proceeding. To
become a party, you must intervene in
the proceeding.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
environmental mailing list, and will
receive notification when the
environmental documents (EA or EIS)
are issued for this project and will be
07SEN1
50098
Federal Register / Vol. 86, No. 170 / Tuesday, September 7, 2021 / Notices
notified of meetings associated with the
Commission’s environmental review
process.
sradovich on DSKJLST7X2PROD with NOTICES
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,2 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 3 and the regulations under
the NGA 4 by the intervention deadline
for the project, which is September 22,
2021. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. [For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene.] For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
How To File Comments and
Interventions
There are two ways to submit your
comments and motions to intervene to
the Commission. In all instances, please
reference the Project docket number
CP21–462–001 in your submission. The
Commission encourages electronic filing
of submissions.
2 18
CFR 385.102(d).
CFR 385.214.
4 18 CFR 157.10.
3 18
VerDate Sep<11>2014
00:30 Sep 04, 2021
Jkt 253001
(1) You may file your comments or
motions to intervene electronically by
using the eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select ‘‘General’’ and then
select ‘‘Comment on a Filing’’ or
‘‘Intervention’’; or
(2) You can file a paper copy of your
comments by mailing them to the
following address below. Your written
comments must reference the Project
docket number (CP21–462–001).
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852
Motions to intervene must be served
on the applicants either by mail or email
(with a link to the document) at: Blank
Rome LLP, 1825 Eye Street NW,
Washington, DC 20006 or at mhaskell@
blankrome.com. Any subsequent
submissions by an intervenor must be
served on the applicants and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 5 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).6 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.7
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the
5 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
6 18 CFR 385.214(c)(1).
7 18 CFR 385.214(b)(3) and (d).
PO 00000
Frm 00087
Fmt 4703
Sfmt 4703
U:\07SEN1.SGM
projects will be available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
‘‘eLibrary’’ link as described above. The
eLibrary link also provides access to the
texts of all formal documents issued by
the Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on September 22, 2021.
Dated: September 1, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–19372 Filed 9–3–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EF21–6–000]
Western Area Power Administration;
Notice of Filing
Take notice that on August 24, 2021,
Western Area Power Administration
submitted tariff filing: Extension of
Western Area Power Administration
Formula Rates—Rate Order No. WAPA–
200, to be effective 10/1/2021.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
07SEN1
Agencies
[Federal Register Volume 86, Number 170 (Tuesday, September 7, 2021)]
[Notices]
[Pages 50097-50098]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-19372]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-462-001]
Roaring Fork Interstate Gas Transmission, LLC; Notice of
Amendment to Application and Establishing Intervention Deadline
Take notice that on August 26, 2021, Roaring Fork Interstate Gas
Transmission, LLC (RFIGT), 1125 17th Street, Suite 650, Denver,
Colorado 80202, filed, pursuant to section 7(c) of the Natural Gas Act
(NGA) and Part 157 of the Commission's regulations an amendment to its
application in Docket No. CP21-462-000 to acquire certain facilities
from Kaiser-Frontier Midstream, LLC in Laramie County, Wyoming and Weld
County, Colorado. RFIGT filed revised versions of Exhibits N, P, and S,
which includes an acquisition adjustment in its rate base and cost of
service. Thus, RFIGT amends its proposal to reflect a maximum monthly
reservation recourse rate for Rate Schedule FT of $12.59 per dekatherm
(Dth) per month and a commodity rate for interruptible services under
Rate Schedule IT to $0.41 per Dth, all as more fully set forth in the
application which is on file with the Commission and open for public
inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding RFIGT's application may be directed to Mark
R. Haskell, Counsel for Roaring Fork Interstate Gas Transmission, LLC,
Blank Rome LLP, 1825 Eye Street NW, Washington, DC 20006, by telephone
at (202) 420-2654 or by email at [email protected].
Pursuant to Section 157.9 of the Commission's Rules of Practice and
Procedure,\1\ within 90 days of this Notice the Commission staff will
either: Complete its environmental review and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or environmental
assessment (EA) for this proposal. The filing of an EA in the
Commission's public record for this proceeding or the issuance of a
Notice of Schedule for Environmental Review will serve to notify
federal and state agencies of the timing for the completion of all
necessary reviews, and the subsequent need to complete all federal
authorizations within 90 days of the date of issuance of the Commission
staff's FEIS or EA.
---------------------------------------------------------------------------
\1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on September 22,
2021. How to file comments and motions to intervene is explained below.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before September 22, 2021. However, the filing of a comment alone
will not serve to make the filer a party to the proceeding. To become a
party, you must intervene in the proceeding.
Persons who comment on the environmental review of this project
will be placed on the Commission's environmental mailing list, and will
receive notification when the environmental documents (EA or EIS) are
issued for this project and will be
[[Page 50098]]
notified of meetings associated with the Commission's environmental
review process.
Interventions
Any person, which includes individuals, organizations, businesses,
municipalities, and other entities,\2\ has the option to file a motion
to intervene in this proceeding. Only intervenors have the right to
request rehearing of Commission orders issued in this proceeding and to
subsequently challenge the Commission's orders in the U.S. Circuit
Courts of Appeal.
---------------------------------------------------------------------------
\2\ 18 CFR 385.102(d).
---------------------------------------------------------------------------
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \3\ and the regulations under the NGA \4\ by the
intervention deadline for the project, which is September 22, 2021. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. [For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene.] For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\3\ 18 CFR 385.214.
\4\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
How To File Comments and Interventions
There are two ways to submit your comments and motions to intervene
to the Commission. In all instances, please reference the Project
docket number CP21-462-001 in your submission. The Commission
encourages electronic filing of submissions.
(1) You may file your comments or motions to intervene
electronically by using the eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select ``General'' and then select ``Comment on a
Filing'' or ``Intervention''; or
(2) You can file a paper copy of your comments by mailing them to
the following address below. Your written comments must reference the
Project docket number (CP21-462-001).
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852
Motions to intervene must be served on the applicants either by
mail or email (with a link to the document) at: Blank Rome LLP, 1825
Eye Street NW, Washington, DC 20006 or at [email protected]. Any
subsequent submissions by an intervenor must be served on the
applicants and all other parties to the proceeding. Contact information
for parties can be downloaded from the service list at the eService
link on FERC Online. Service can be via email with a link to the
document.
All timely, unopposed \5\ motions to intervene are automatically
granted by operation of Rule 214(c)(1).\6\ Motions to intervene that
are filed after the intervention deadline are untimely, and may be
denied. Any late-filed motion to intervene must show good cause for
being late and must explain why the time limitation should be waived
and provide justification by reference to factors set forth in Rule
214(d) of the Commission's Rules and Regulations.\7\ A person obtaining
party status will be placed on the service list maintained by the
Secretary of the Commission and will receive copies (paper or
electronic) of all documents filed by the applicant and by all other
parties.
---------------------------------------------------------------------------
\5\ The applicant has 15 days from the submittal of a motion to
intervene to file a written objection to the intervention.
\6\ 18 CFR 385.214(c)(1).
\7\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------
Tracking the Proceeding
Throughout the proceeding, additional information about the
projects will be available from the Commission's Office of External
Affairs, at (866) 208-FERC, or on the FERC website at www.ferc.gov
using the ``eLibrary'' link as described above. The eLibrary link also
provides access to the texts of all formal documents issued by the
Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Intervention Deadline: 5:00 p.m. Eastern Time on September 22,
2021.
Dated: September 1, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-19372 Filed 9-3-21; 8:45 am]
BILLING CODE 6717-01-P