Roaring Fork Interstate Gas Transmission, LLC; Notice of Amendment to Application and Establishing Intervention Deadline, 50097-50098 [2021-19372]

Download as PDF Federal Register / Vol. 86, No. 170 / Tuesday, September 7, 2021 / Notices annually, and 4 hours and $332 per response. The total estimated burdens per year are 1,284 hours and $106,572. These burdens are itemized in the following table: Number of respondents Annual number of responses per respondent Total number of responses (column A × column B) Average burden & cost per response 2 Total annual burden hours & total annual cost (column C × column D) Cost per respondent ($) (column E ÷ column A) A. B. C. D. E. F. 4 hrs.; $348 ...................................... 1,284 hrs.; $111,708 ........................ 321 ................. 1 321 Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: September 1, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–19359 Filed 9–3–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–462–001] Roaring Fork Interstate Gas Transmission, LLC; Notice of Amendment to Application and Establishing Intervention Deadline sradovich on DSKJLST7X2PROD with NOTICES 50097 Take notice that on August 26, 2021, Roaring Fork Interstate Gas Transmission, LLC (RFIGT), 1125 17th Street, Suite 650, Denver, Colorado 80202, filed, pursuant to section 7(c) of the Natural Gas Act (NGA) and Part 157 of the Commission’s regulations an amendment to its application in Docket No. CP21–462–000 to acquire certain facilities from Kaiser-Frontier Midstream, LLC in Laramie County, Wyoming and Weld County, Colorado. RFIGT filed revised versions of Exhibits N, P, and S, which includes an 2 Commission staff estimates that the average industry hourly cost for this information collection is approximated by the current FERC 2021 average hourly costs for wages and benefits, i.e., $87.00/ hour. VerDate Sep<11>2014 00:30 Sep 04, 2021 Jkt 253001 acquisition adjustment in its rate base and cost of service. Thus, RFIGT amends its proposal to reflect a maximum monthly reservation recourse rate for Rate Schedule FT of $12.59 per dekatherm (Dth) per month and a commodity rate for interruptible services under Rate Schedule IT to $0.41 per Dth, all as more fully set forth in the application which is on file with the Commission and open for public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions regarding RFIGT’s application may be directed to Mark R. Haskell, Counsel for Roaring Fork Interstate Gas Transmission, LLC, Blank Rome LLP, 1825 Eye Street NW, Washington, DC 20006, by telephone at (202) 420–2654 or by email at mhaskell@blankrome.com. Pursuant to Section 157.9 of the Commission’s Rules of Practice and Procedure,1 within 90 days of this Notice the Commission staff will either: Complete its environmental review and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of 1 18 PO 00000 CFR (Code of Federal Regulations) 157.9. Frm 00086 Fmt 4703 Sfmt 4703 U:\07SEN1.SGM $348 Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or environmental assessment (EA) for this proposal. The filing of an EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Public Participation There are three ways to become involved in the Commission’s review of this project: You can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on September 22, 2021. How to file comments and motions to intervene is explained below. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before September 22, 2021. However, the filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. Persons who comment on the environmental review of this project will be placed on the Commission’s environmental mailing list, and will receive notification when the environmental documents (EA or EIS) are issued for this project and will be 07SEN1 50098 Federal Register / Vol. 86, No. 170 / Tuesday, September 7, 2021 / Notices notified of meetings associated with the Commission’s environmental review process. sradovich on DSKJLST7X2PROD with NOTICES Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,2 has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 3 and the regulations under the NGA 4 by the intervention deadline for the project, which is September 22, 2021. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. [For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene.] For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. How To File Comments and Interventions There are two ways to submit your comments and motions to intervene to the Commission. In all instances, please reference the Project docket number CP21–462–001 in your submission. The Commission encourages electronic filing of submissions. 2 18 CFR 385.102(d). CFR 385.214. 4 18 CFR 157.10. 3 18 VerDate Sep<11>2014 00:30 Sep 04, 2021 Jkt 253001 (1) You may file your comments or motions to intervene electronically by using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’ or ‘‘Intervention’’; or (2) You can file a paper copy of your comments by mailing them to the following address below. Your written comments must reference the Project docket number (CP21–462–001). To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852 Motions to intervene must be served on the applicants either by mail or email (with a link to the document) at: Blank Rome LLP, 1825 Eye Street NW, Washington, DC 20006 or at mhaskell@ blankrome.com. Any subsequent submissions by an intervenor must be served on the applicants and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 5 motions to intervene are automatically granted by operation of Rule 214(c)(1).6 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.7 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the 5 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 6 18 CFR 385.214(c)(1). 7 18 CFR 385.214(b)(3) and (d). PO 00000 Frm 00087 Fmt 4703 Sfmt 4703 U:\07SEN1.SGM projects will be available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on September 22, 2021. Dated: September 1, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–19372 Filed 9–3–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EF21–6–000] Western Area Power Administration; Notice of Filing Take notice that on August 24, 2021, Western Area Power Administration submitted tariff filing: Extension of Western Area Power Administration Formula Rates—Rate Order No. WAPA– 200, to be effective 10/1/2021. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file 07SEN1

Agencies

[Federal Register Volume 86, Number 170 (Tuesday, September 7, 2021)]
[Notices]
[Pages 50097-50098]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-19372]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP21-462-001]


Roaring Fork Interstate Gas Transmission, LLC; Notice of 
Amendment to Application and Establishing Intervention Deadline

    Take notice that on August 26, 2021, Roaring Fork Interstate Gas 
Transmission, LLC (RFIGT), 1125 17th Street, Suite 650, Denver, 
Colorado 80202, filed, pursuant to section 7(c) of the Natural Gas Act 
(NGA) and Part 157 of the Commission's regulations an amendment to its 
application in Docket No. CP21-462-000 to acquire certain facilities 
from Kaiser-Frontier Midstream, LLC in Laramie County, Wyoming and Weld 
County, Colorado. RFIGT filed revised versions of Exhibits N, P, and S, 
which includes an acquisition adjustment in its rate base and cost of 
service. Thus, RFIGT amends its proposal to reflect a maximum monthly 
reservation recourse rate for Rate Schedule FT of $12.59 per dekatherm 
(Dth) per month and a commodity rate for interruptible services under 
Rate Schedule IT to $0.41 per Dth, all as more fully set forth in the 
application which is on file with the Commission and open for public 
inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected] or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding RFIGT's application may be directed to Mark 
R. Haskell, Counsel for Roaring Fork Interstate Gas Transmission, LLC, 
Blank Rome LLP, 1825 Eye Street NW, Washington, DC 20006, by telephone 
at (202) 420-2654 or by email at [email protected].
    Pursuant to Section 157.9 of the Commission's Rules of Practice and 
Procedure,\1\ within 90 days of this Notice the Commission staff will 
either: Complete its environmental review and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or environmental 
assessment (EA) for this proposal. The filing of an EA in the 
Commission's public record for this proceeding or the issuance of a 
Notice of Schedule for Environmental Review will serve to notify 
federal and state agencies of the timing for the completion of all 
necessary reviews, and the subsequent need to complete all federal 
authorizations within 90 days of the date of issuance of the Commission 
staff's FEIS or EA.
---------------------------------------------------------------------------

    \1\ 18 CFR (Code of Federal Regulations) 157.9.
---------------------------------------------------------------------------

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: You can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on September 22, 
2021. How to file comments and motions to intervene is explained below.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before September 22, 2021. However, the filing of a comment alone 
will not serve to make the filer a party to the proceeding. To become a 
party, you must intervene in the proceeding.
    Persons who comment on the environmental review of this project 
will be placed on the Commission's environmental mailing list, and will 
receive notification when the environmental documents (EA or EIS) are 
issued for this project and will be

[[Page 50098]]

notified of meetings associated with the Commission's environmental 
review process.

Interventions

    Any person, which includes individuals, organizations, businesses, 
municipalities, and other entities,\2\ has the option to file a motion 
to intervene in this proceeding. Only intervenors have the right to 
request rehearing of Commission orders issued in this proceeding and to 
subsequently challenge the Commission's orders in the U.S. Circuit 
Courts of Appeal.
---------------------------------------------------------------------------

    \2\ 18 CFR 385.102(d).
---------------------------------------------------------------------------

    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \3\ and the regulations under the NGA \4\ by the 
intervention deadline for the project, which is September 22, 2021. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. [For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene.] For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \3\ 18 CFR 385.214.
    \4\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

How To File Comments and Interventions

    There are two ways to submit your comments and motions to intervene 
to the Commission. In all instances, please reference the Project 
docket number CP21-462-001 in your submission. The Commission 
encourages electronic filing of submissions.
    (1) You may file your comments or motions to intervene 
electronically by using the eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select ``General'' and then select ``Comment on a 
Filing'' or ``Intervention''; or
    (2) You can file a paper copy of your comments by mailing them to 
the following address below. Your written comments must reference the 
Project docket number (CP21-462-001).

To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426
To mail via any other courier, use the following address: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852

    Motions to intervene must be served on the applicants either by 
mail or email (with a link to the document) at: Blank Rome LLP, 1825 
Eye Street NW, Washington, DC 20006 or at [email protected]. Any 
subsequent submissions by an intervenor must be served on the 
applicants and all other parties to the proceeding. Contact information 
for parties can be downloaded from the service list at the eService 
link on FERC Online. Service can be via email with a link to the 
document.
    All timely, unopposed \5\ motions to intervene are automatically 
granted by operation of Rule 214(c)(1).\6\ Motions to intervene that 
are filed after the intervention deadline are untimely, and may be 
denied. Any late-filed motion to intervene must show good cause for 
being late and must explain why the time limitation should be waived 
and provide justification by reference to factors set forth in Rule 
214(d) of the Commission's Rules and Regulations.\7\ A person obtaining 
party status will be placed on the service list maintained by the 
Secretary of the Commission and will receive copies (paper or 
electronic) of all documents filed by the applicant and by all other 
parties.
---------------------------------------------------------------------------

    \5\ The applicant has 15 days from the submittal of a motion to 
intervene to file a written objection to the intervention.
    \6\ 18 CFR 385.214(c)(1).
    \7\ 18 CFR 385.214(b)(3) and (d).
---------------------------------------------------------------------------

Tracking the Proceeding

    Throughout the proceeding, additional information about the 
projects will be available from the Commission's Office of External 
Affairs, at (866) 208-FERC, or on the FERC website at www.ferc.gov 
using the ``eLibrary'' link as described above. The eLibrary link also 
provides access to the texts of all formal documents issued by the 
Commission, such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.
    Intervention Deadline: 5:00 p.m. Eastern Time on September 22, 
2021.

    Dated: September 1, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-19372 Filed 9-3-21; 8:45 am]