Download as PDF Federal Register / Vol. 86, No. 170 / Tuesday, September 7, 2021 / Notices and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on September 20, 2021. Dated: August 31, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–19200 Filed 9–3–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TX21–5–000] sradovich on DSKJLST7X2PROD with NOTICES EnerSmart El Cajon BESS LLC; Notice of Filing Take notice that on September 1, 2021, pursuant to section 211 of the Federal Power Act,1 EnerSmart El Cajon BESS LLC (EnerSmart El Cajon) filed an application requesting that the Federal Energy Regulatory Commission (Commission) issue an order requiring San Diego Gas & Electric Company (SDG&E) to provide interconnection and transmission service for delivery of the output from EnerSmart El Cajon’s 3 MW battery energy storage system across SDG&E Participating Transmission 1 16 U.S.C. 824j, (2018). VerDate Sep<11>2014 00:30 Sep 04, 2021 Jkt 253001 Owner’s Interconnection Facilities to a Point of Interconnection with the California Independent System Operator Corporation Controlled Grid, including Network Upgrades to be constructed to accommodate service to EnerSmart El Cajon. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Time on September 22, 2021. PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 U:\07SEN1.SGM 50103 Dated: September 1, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–19357 Filed 9–3–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: CP21–489–000. Applicants: Carlsbad Gateway, LLC. Description: Abbreviated Application of Carlsbad Gateway, LLC For Part 284 Blanket Certificate Authorization and Temporary Waivers. Filed Date: 8/31/21. Accession Number: 20210831–5056. Comment Date: 5 p.m. ET 9/21/21. Docket Numbers: PR21–62–000. Applicants: Black Hills/Kansas Gas Utility Company, LLC. Description: Submits tariff filing per 284.123(b),(e)/: BHKG Revised Statement of Rates and SOC to be effective 8/1/2021. Filed Date: 8/30/21. Accession Number: 20210830–5123. Comments/Protests Due: 5 p.m. ET 9/ 20/21. Docket Numbers: RP21–1067–000. Applicants: TransColorado Gas Transmission Company LLC. Description: § 4(d) Rate Filing: Quarterly Update Fuel Gas and LU Reimbursement Fling to be effective 10/ 1/2021. Filed Date: 8/31/21. Accession Number: 20210831–5039. Comment Date: 5 p.m. ET 9/13/21. Docket Numbers: RP21–1068–000. Applicants: Carolina Gas Transmission, LLC. Description: Compliance filing: CGT—2021 Penalty Crediting Sharing Report to be effective N/A. Filed Date: 8/31/21. Accession Number: 20210831–5044. Comment Date: 5 p.m. ET 9/13/21. Docket Numbers: RP21–1069–000. Applicants: Florida Gas Transmission Company, LLC. Description: § 4(d) Rate Filing: Fuel Filing on 8–31–21 to be effective 10/1/ 2021. Filed Date: 8/31/21. Accession Number: 20210831–5051. Comment Date: 5 p.m. ET 9/13/21. Docket Numbers: RP21–1070–000. 07SEN1

Agencies

[Federal Register Volume 86, Number 170 (Tuesday, September 7, 2021)]
[Notices]
[Page 50103]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-19357]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. TX21-5-000]


EnerSmart El Cajon BESS LLC; Notice of Filing

    Take notice that on September 1, 2021, pursuant to section 211 of 
the Federal Power Act,\1\ EnerSmart El Cajon BESS LLC (EnerSmart El 
Cajon) filed an application requesting that the Federal Energy 
Regulatory Commission (Commission) issue an order requiring San Diego 
Gas & Electric Company (SDG&E) to provide interconnection and 
transmission service for delivery of the output from EnerSmart El 
Cajon's 3 MW battery energy storage system across SDG&E Participating 
Transmission Owner's Interconnection Facilities to a Point of 
Interconnection with the California Independent System Operator 
Corporation Controlled Grid, including Network Upgrades to be 
constructed to accommodate service to EnerSmart El Cajon.
---------------------------------------------------------------------------

    \1\ 16 U.S.C. 824j, (2018).
---------------------------------------------------------------------------

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant. On or before the comment date, it is 
not necessary to serve motions to intervene or protests on persons 
other than the Applicant.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://www.ferc.gov) using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically may mail 
similar pleadings to the Federal Energy Regulatory Commission, 888 
First Street NE, Washington, DC 20426. Hand delivered submissions in 
docketed proceedings should be delivered to Health and Human Services, 
12225 Wilkins Avenue, Rockville, Maryland 20852.
    Comment Date: 5:00 p.m. Eastern Time on September 22, 2021.

    Dated: September 1, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-19357 Filed 9-3-21; 8:45 am]
BILLING CODE 6717-01-P