Factory Falls, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 49324 [2021-18966]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
49324
Federal Register / Vol. 86, No. 168 / Thursday, September 2, 2021 / Notices
e. Name of Project: Fellows Dam
Project (project).
f. Location: On the Black River in
Windsor County, Vermont. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Potential Applicant Contact: Mr.
Richard Genderson, One Hundred River
Street, LLC; 300 Massachusetts Ave. NE,
Washington, DC 20002; (202) 543–9300;
email at rick@cellar.com.
i. FERC Contact: Michael Watts at
(202) 502–6123; or email at
michael.watts@ferc.gov.
j. One Hundred River filed its request
to use the Traditional Licensing Process
on June 30, 2021, and provided public
notice of its request on June 30, 2021
and July 7, 2021. In a letter dated
August 27, 2021, the Director of the
Division of Hydropower Licensing
approved One Hundred River’s request
to use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the Vermont State
Historic Preservation Officer, as
required by section 106 of the National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
One Hundred River as the Commission’s
non-federal representative for carrying
out informal consultation pursuant to
section 7 of the Endangered Species Act
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. On June 30, 2021, One Hundred
River filed a Pre-Application Document
(PAD; including a proposed process
plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website (https://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
VerDate Sep<11>2014
17:33 Sep 01, 2021
Jkt 253001
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 9648.
Pursuant to 18 CFR 16.20, each
application for a subsequent license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by June 30, 2024.
p. Register online at https://
ferconline.ferc.gov/FERCOnline.aspx to
be notified via email of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Dated: August 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–18964 Filed 9–1–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9650–036]
Factory Falls, Inc.; Notice of Intent To
File License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 9650–036.
c. Date Filed: June 30, 2021.
d. Submitted By: Factory Falls, Inc.
(Factory Falls).
e. Name of Project: Gilman Dam
Project (project).
f. Location: On the Black River in
Windsor County, Vermont. No federal
lands are occupied by the project works
or located within the project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and
5.5 of the Commission’s regulations.
h. Potential Applicant Contact: Mr.
William Handly, Factory Falls, Inc.; 286
South Street, Springfield, VT 05156–
3277; (802) 885–5360; email at
bhandly@vermontel.net.
i. FERC Contact: Amy Chang at (202)
502–8250; or email at amy.chang@
ferc.gov.
j. Factory Falls filed its request to use
the Traditional Licensing Process on
June 30, 2021 and provided public
notice of its request on June 30, 2021
and July 7, 2021. In a letter dated
August 27, 2021, the Director of the
Division of Hydropower Licensing
approved Factory Falls’ request to use
the Traditional Licensing Process.
PO 00000
Frm 00038
Fmt 4703
Sfmt 9990
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
part 402; and NOAA Fisheries under
section 305(b) of the Magnuson-Stevens
Fishery Conservation and Management
Act and implementing regulations at 50
CFR 600.920. We are also initiating
consultation with the Vermont State
Historic Preservation Officer, as
required by section 106 of the National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Factory Falls as the Commission’s nonfederal representative for carrying out
informal consultation pursuant to
section 7 of the Endangered Species Act;
and consultation pursuant to section
106 of the National Historic
Preservation Act.
m. On June 30, 2021, Factory Falls
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD may be viewed
and/or printed on the Commission’s
website (https://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY).
o. The licensee states its unequivocal
intent to submit an application for a
subsequent license for Project No. 9650.
Pursuant to 18 CFR 16.20, each
application for a subsequent license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by June 30, 2024.
p. Register online at https://
ferconline.ferc.gov/FERCOnline.aspx to
be notified via email of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Dated: August 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–18966 Filed 9–1–21; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\02SEN1.SGM
02SEN1
Agencies
[Federal Register Volume 86, Number 168 (Thursday, September 2, 2021)]
[Notices]
[Page 49324]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-18966]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9650-036]
Factory Falls, Inc.; Notice of Intent To File License
Application, Filing of Pre-Application Document, and Approving Use of
the Traditional Licensing Process
a. Type of Filing: Notice of Intent to File License Application and
Request to Use the Traditional Licensing Process.
b. Project No.: 9650-036.
c. Date Filed: June 30, 2021.
d. Submitted By: Factory Falls, Inc. (Factory Falls).
e. Name of Project: Gilman Dam Project (project).
f. Location: On the Black River in Windsor County, Vermont. No
federal lands are occupied by the project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's
regulations.
h. Potential Applicant Contact: Mr. William Handly, Factory Falls,
Inc.; 286 South Street, Springfield, VT 05156-3277; (802) 885-5360;
email at [email protected].
i. FERC Contact: Amy Chang at (202) 502-8250; or email at
[email protected].
j. Factory Falls filed its request to use the Traditional Licensing
Process on June 30, 2021 and provided public notice of its request on
June 30, 2021 and July 7, 2021. In a letter dated August 27, 2021, the
Director of the Division of Hydropower Licensing approved Factory
Falls' request to use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and NOAA Fisheries under section 7
of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the Vermont State Historic Preservation Officer, as
required by section 106 of the National Historic Preservation Act, and
the implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating Factory Falls as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act; and
consultation pursuant to section 106 of the National Historic
Preservation Act.
m. On June 30, 2021, Factory Falls filed a Pre-Application Document
(PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD may be viewed and/or printed on the
Commission's website (https://www.ferc.gov), using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY).
o. The licensee states its unequivocal intent to submit an
application for a subsequent license for Project No. 9650. Pursuant to
18 CFR 16.20, each application for a subsequent license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by June 30,
2024.
p. Register online at https://ferconline.ferc.gov/FERCOnline.aspx
to be notified via email of new filings and issuances related to this
or other pending projects. For assistance, contact FERC Online Support.
Dated: August 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-18966 Filed 9-1-21; 8:45 am]
BILLING CODE 6717-01-P