Combined Notice of Filings #1, 49009-49011 [2021-18900]
Download as PDF
Federal Register / Vol. 86, No. 167 / Wednesday, September 1, 2021 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. With eFiling, you can provide
comments in a variety of formats by
attaching them as a file with your
submission. New eFiling users must
first create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Comment on a Filing’’; or
(3) You may file a paper copy of your
comments by mailing them to the
address below.2 Your written comments
must reference the project docket
number (CP21–484–000). Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
The Commission encourages
electronic filing of comments (options 1
and 2 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov. Persons
who comment on the environmental
review of this project will be placed on
the Commission’s environmental
mailing list, and will receive
notification when the environmental
documents (EA or EIS) are issued for
this project and will be notified of
meetings associated with the
Commission’s environmental review
process.
The Commission considers all
comments received about the project in
determining the appropriate action to be
taken. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding. For instructions on how to
intervene, see below.
Interventions
Any person, which includes
individuals, organizations, businesses,
municipalities, and other entities,3 has
the option to file a motion to intervene
in this proceeding. Only intervenors
have the right to request rehearing of
Commission orders issued in this
proceeding and to subsequently
challenge the Commission’s orders in
the U.S. Circuit Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is September 16,
2 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
3 18 CFR 385.102(d).
4 18 CFR 385.214.
5 18 CFR 157.10.
VerDate Sep<11>2014
17:09 Aug 31, 2021
Jkt 253001
2021. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as the
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
There are two ways to submit your
motion to intervene. In both instances,
please reference the Project docket
number CP21–484–000 in your
submission.
(1) You may file your motion to
intervene by using the Commission’s
eFiling feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You may file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below.6 Your motion to
intervene must reference the project
docket number CP21–484–000.
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Motions to intervene must be served
on the applicant either by mail at: Gulf
States Transmission LLC, 1300 Main
Street, Houston, Texas 77002; or or by
email at blair.lichtenwalter@
energytransfer.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
6 Hand
delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
49009
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely, and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on Thursday, September
16, 2021.
Dated: August 26, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–18897 Filed 8–31–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–225–000.
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
E:\FR\FM\01SEN1.SGM
01SEN1
khammond on DSKJM1Z7X2PROD with NOTICES
49010
Federal Register / Vol. 86, No. 167 / Wednesday, September 1, 2021 / Notices
Applicants: Bat Cave Energy Storage,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Bat Cave Energy
Storage, LLC.
Filed Date: 8/20/21.
Accession Number: 20210820–5255.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21–226–000.
Applicants: BRP Dickinson BESS
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of BRP Dickinson
BESS LLC.
Filed Date: 8/20/21.
Accession Number: 20210820–5256.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21–227–000.
Applicants: BRP Pueblo I BESS, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of BRP Pueblo I BESS,
LLC.
Filed Date: 8/20/21.
Accession Number: 20210820–5257.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21–228–000.
Applicants: BRP Pueblo II BESS, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of BRP Pueblo II BESS,
LLC.
Filed Date: 8/20/21.
Accession Number: 20210820–5258.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21–229–000.
Applicants: BRP Zapata I BESS, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of BRP Zapata I BESS,
LLC.
Filed Date: 8/20/21.
Accession Number: 20210820–5259.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21–230–000.
Applicants: BRP Zapata II BESS, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of BRP Zapata II BESS,
LLC.
Filed Date: 8/20/21.
Accession Number: 20210820–5260.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21–231–000.
Applicants: BRP Loop 463 BESS LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of BRP Loop 463 BESS
LLC.
Filed Date: 8/20/21.
Accession Number: 20210820–5262.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21–232–000.
Applicants: BRP Lopeno BESS LLC.
Description: Notice of Selfcertification of Exempt Wholesale
VerDate Sep<11>2014
17:09 Aug 31, 2021
Jkt 253001
Generator Status of BRP Lopeno BESS
LLC.
Filed Date: 8/20/21.
Accession Number: 20210820–5261.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21–233–000.
Applicants: North Fork Energy
Storage, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of North Fork Energy
Storage, LLC.
Filed Date: 8/20/21.
Accession Number: 20210820–5263.
Comment Date: 5 p.m. ET 9/10/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–2609–001.
Applicants: NSTAR Electric
Company.
Description: Compliance filing: Order
No. 864 Compliance Filing, RM19–5 to
be effective 1/27/2020.
Filed Date: 8/26/21.
Accession Number: 20210826–5107.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER20–2610–001.
Applicants: The Connecticut Light
and Power Company.
Description: Compliance filing: Order
No. 864 Compliance Filing, RM19–5 to
be effective 1/27/2020.
Filed Date: 8/26/21.
Accession Number: 20210826–5056.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–283–001.
Applicants: Hillcrest Solar I, LLC.
Description: Compliance filing:
Compliance to 2 Zero rate filing to be
effective 2/27/2021.
Filed Date: 8/26/21.
Accession Number: 20210826–5088.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–283–002.
Applicants: Hillcrest Solar I, LLC.
Description: Compliance filing:
Compliance to 2 Rate filing July
Effective to be effective 7/29/2021.
Filed Date: 8/26/21.
Accession Number: 20210826–5089.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–922–000.
Applicants: Entergy Mississippi, LLC.
Description: Refund Report: EML–
TVA WDS Refund Report to be effective
N/A.
Filed Date: 8/26/21.
Accession Number: 20210826–5014.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–2771–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT, Att. P re:
Interconnection Construction Service
Agreement to be effective 10/26/2021.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Filed Date: 8/26/21.
Accession Number: 20210826–5034.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–2772–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, SA No. 6127; Queue No.
AC1–073 to be effective 7/27/2021.
Filed Date: 8/26/21.
Accession Number: 20210826–5054.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–2773–000.
Applicants: Alabama Power
Company.
Description: Tariff Amendment: RES
America Developments (Durant Bend
Solar) LGIA Termination Filing to be
effective 8/26/2021.
Filed Date: 8/26/21.
Accession Number: 20210826–5055.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–2774–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to Sch. 12-Appx A: July 2021
RTEP, 30-Day Comment Period
Requested to be effective 11/24/2021.
Filed Date: 8/26/21.
Accession Number: 20210826–5071.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–2775–000.
Applicants: Spartacus Energy
Services, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Tariff Application to
be effective 8/27/2021.
Filed Date: 8/26/21.
Accession Number: 20210826–5073.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–2776–000.
Applicants: Ameren Illinois
Company.
Description: § 205(d) Rate Filing:
Reimbursement Agreement, RS 155,
Prairie Power West Griggsville to be
effective 10/26/2021.
Filed Date: 8/26/21.
Accession Number: 20210826–5075.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21–2777–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
932—Forecast Data Agreement with
Cycle Horseshoe Bend Wind LLC to be
effective 9/1/2021.
Filed Date: 8/26/21.
Accession Number: 20210826–5082.
Comment Date: 5 p.m. ET 9/16/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number. Any person desiring to
intervene or protest in any of the above
E:\FR\FM\01SEN1.SGM
01SEN1
Federal Register / Vol. 86, No. 167 / Wednesday, September 1, 2021 / Notices
proceedings must file in accordance
with Rules 211 and 214 of the
Commission’s Regulations (18 CFR
385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified
comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 26, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–18900 Filed 8–31–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–78–000]
khammond on DSKJM1Z7X2PROD with NOTICES
ANR Pipeline Company; Notice of
Intent To Prepare an Environmental
Impact Statement for The Proposed
Wisconsin Access Project, Request for
Comments on Environmental Issues,
and Schedule for Environmental
Review
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
that will discuss the environmental
impacts of the Wisconsin Access Project
(Project) involving construction and
operation of facilities by ANR Pipeline
Company (ANR) in Oconto, Oneida,
Manitowoc, and Marathon Counties,
Wisconsin. The Commission will use
this EIS in its decision-making process
to determine whether the Project is in
the public convenience and necessity.
The schedule for preparation of the EIS
is discussed in the Schedule for
Environmental Review section of this
notice.
As part of the National Environmental
Policy Act (NEPA) review process, the
Commission takes into account
concerns the public may have about
proposals and the environmental
impacts that could result whenever it
considers the issuance of a Certificate of
Public Convenience and Necessity. This
gathering of public input is referred to
as ‘‘scoping.’’ By notice issued on April
23, 2021, in Docket No. CP21–78–000,
the Commission opened a scoping
VerDate Sep<11>2014
17:09 Aug 31, 2021
Jkt 253001
period; and staff intends to prepare an
EIS that will address the concerns raised
during that scoping period as well as
comments received in response to this
notice. Therefore, the Commission
requests comments on potential
alternatives and impacts, and any
relevant information, studies, or
analyses of any kind concerning impacts
affecting the quality of the human
environment. To ensure that your
comments are timely and properly
recorded, please submit your comments
so that the Commission receives them in
Washington, DC on or before 5:00 p.m.
Eastern Time on September 25, 2021.
Further details on how to submit
comments are provided in the Public
Participation section of this notice.
As mentioned above, the Commission
previously opened a scoping period
which expired on May 24, 2021. All
substantive written and oral comments
provided during scoping will be
addressed in the EIS. Therefore, if you
submitted comments on this Project to
the Commission during the previous
scoping process, you do not need to file
those comments again.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the Project, the Natural Gas Act conveys
the right of eminent domain to the
company. Therefore, if you and the
company do not reach an easement
agreement, the pipeline company could
initiate condemnation proceedings in
court. In such instances, compensation
would be determined by a judge in
accordance with state law. The
Commission does not grant, exercise, or
oversee the exercise of eminent domain
authority. The courts have exclusive
authority to handle eminent domain
cases; the Commission has no
jurisdiction over these matters.
ANR provided landowners with a fact
sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
which addresses typically asked
questions, including the use of eminent
domain and how to participate in the
Commission’s proceedings. This fact
sheet along with other landowner topics
of interest are available for viewing on
the FERC website (www.ferc.gov) under
the Natural Gas Questions or
Landowner Topics link.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
49011
Public Participation
There are three methods you can use
to submit your comments to the
Commission. The Commission
encourages electronic filing of
comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov. Please
carefully follow these instructions so
that your comments are properly
recorded.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is also on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
Project docket number (CP21–78–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, MD 20852.
Additionally, the Commission offers a
free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Summary of the Proposed Project, the
Project Purpose and Need, and
Expected Impacts
ANR proposes to facilitate an increase
in the firm capacity on its natural gas
pipeline by approximately 50,707
dekatherms per day into Wisconsin,
through software modifications and
minor modifications to its existing
Coleman, Lena, Meeme, Mosinee,
Rhinelander, Suring, and Two Rivers
Meter Stations. The modifications
E:\FR\FM\01SEN1.SGM
01SEN1
Agencies
[Federal Register Volume 86, Number 167 (Wednesday, September 1, 2021)]
[Notices]
[Pages 49009-49011]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-18900]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-225-000.
[[Page 49010]]
Applicants: Bat Cave Energy Storage, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Bat Cave Energy Storage, LLC.
Filed Date: 8/20/21.
Accession Number: 20210820-5255.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21-226-000.
Applicants: BRP Dickinson BESS LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of BRP Dickinson BESS LLC.
Filed Date: 8/20/21.
Accession Number: 20210820-5256.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21-227-000.
Applicants: BRP Pueblo I BESS, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of BRP Pueblo I BESS, LLC.
Filed Date: 8/20/21.
Accession Number: 20210820-5257.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21-228-000.
Applicants: BRP Pueblo II BESS, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of BRP Pueblo II BESS, LLC.
Filed Date: 8/20/21.
Accession Number: 20210820-5258.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21-229-000.
Applicants: BRP Zapata I BESS, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of BRP Zapata I BESS, LLC.
Filed Date: 8/20/21.
Accession Number: 20210820-5259.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21-230-000.
Applicants: BRP Zapata II BESS, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of BRP Zapata II BESS, LLC.
Filed Date: 8/20/21.
Accession Number: 20210820-5260.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21-231-000.
Applicants: BRP Loop 463 BESS LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of BRP Loop 463 BESS LLC.
Filed Date: 8/20/21.
Accession Number: 20210820-5262.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21-232-000.
Applicants: BRP Lopeno BESS LLC.
Description: Notice of Self-certification of Exempt Wholesale
Generator Status of BRP Lopeno BESS LLC.
Filed Date: 8/20/21.
Accession Number: 20210820-5261.
Comment Date: 5 p.m. ET 9/10/21.
Docket Numbers: EG21-233-000.
Applicants: North Fork Energy Storage, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of North Fork Energy Storage, LLC.
Filed Date: 8/20/21.
Accession Number: 20210820-5263.
Comment Date: 5 p.m. ET 9/10/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER20-2609-001.
Applicants: NSTAR Electric Company.
Description: Compliance filing: Order No. 864 Compliance Filing,
RM19-5 to be effective 1/27/2020.
Filed Date: 8/26/21.
Accession Number: 20210826-5107.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER20-2610-001.
Applicants: The Connecticut Light and Power Company.
Description: Compliance filing: Order No. 864 Compliance Filing,
RM19-5 to be effective 1/27/2020.
Filed Date: 8/26/21.
Accession Number: 20210826-5056.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-283-001.
Applicants: Hillcrest Solar I, LLC.
Description: Compliance filing: Compliance to 2 Zero rate filing to
be effective 2/27/2021.
Filed Date: 8/26/21.
Accession Number: 20210826-5088.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-283-002.
Applicants: Hillcrest Solar I, LLC.
Description: Compliance filing: Compliance to 2 Rate filing July
Effective to be effective 7/29/2021.
Filed Date: 8/26/21.
Accession Number: 20210826-5089.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-922-000.
Applicants: Entergy Mississippi, LLC.
Description: Refund Report: EML-TVA WDS Refund Report to be
effective N/A.
Filed Date: 8/26/21.
Accession Number: 20210826-5014.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-2771-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to OATT, Att. P
re: Interconnection Construction Service Agreement to be effective 10/
26/2021.
Filed Date: 8/26/21.
Accession Number: 20210826-5034.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-2772-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original NSA, SA No. 6127;
Queue No. AC1-073 to be effective 7/27/2021.
Filed Date: 8/26/21.
Accession Number: 20210826-5054.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-2773-000.
Applicants: Alabama Power Company.
Description: Tariff Amendment: RES America Developments (Durant
Bend Solar) LGIA Termination Filing to be effective 8/26/2021.
Filed Date: 8/26/21.
Accession Number: 20210826-5055.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-2774-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Revisions to Sch. 12-Appx A:
July 2021 RTEP, 30-Day Comment Period Requested to be effective 11/24/
2021.
Filed Date: 8/26/21.
Accession Number: 20210826-5071.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-2775-000.
Applicants: Spartacus Energy Services, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Tariff
Application to be effective 8/27/2021.
Filed Date: 8/26/21.
Accession Number: 20210826-5073.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-2776-000.
Applicants: Ameren Illinois Company.
Description: Sec. 205(d) Rate Filing: Reimbursement Agreement, RS
155, Prairie Power West Griggsville to be effective 10/26/2021.
Filed Date: 8/26/21.
Accession Number: 20210826-5075.
Comment Date: 5 p.m. ET 9/16/21.
Docket Numbers: ER21-2777-000.
Applicants: NorthWestern Corporation.
Description: Sec. 205(d) Rate Filing: SA 932--Forecast Data
Agreement with Cycle Horseshoe Bend Wind LLC to be effective 9/1/2021.
Filed Date: 8/26/21.
Accession Number: 20210826-5082.
Comment Date: 5 p.m. ET 9/16/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number. Any person desiring to intervene or protest in any
of the above
[[Page 49011]]
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: August 26, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-18900 Filed 8-31-21; 8:45 am]
BILLING CODE 6717-01-P