Combined Notice of Filings #1, 48673-48674 [2021-18738]

Download as PDF Federal Register / Vol. 86, No. 166 / Tuesday, August 31, 2021 / Notices Commission’s environmental review process. khammond on DSKJM1Z7X2PROD with NOTICES Interventions Any person, which includes individuals, organizations, businesses, municipalities, and other entities,2 has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 3 and the regulations under the NGA 4 by the intervention deadline for the project, which is July 23, 2021. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. [For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene.] For more information about motions to intervene, refer to the FERC website at https://www.ferc.gov/ resources/guides/how-to/intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. How To File Comments and Interventions There are two ways to submit your comments and motions to intervene to the Commission. In all instances, please reference the Project docket numbers CP21–463–000 in your submission. The Commission encourages electronic filing of submissions. (1) You may file your comments or motions to intervene electronically by 2 18 CFR 385.102(d). CFR 385.214. 4 18 CFR 157.10. 3 18 VerDate Sep<11>2014 20:08 Aug 30, 2021 Jkt 253001 using the eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Comment on a Filing’’ or ‘‘Intervention’’; or (2) You can file a paper copy of your comments by mailing them to the following address below. Your written comments must reference the Project docket numbers (CP21–463–000). To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: Texas Eastern Transmission, LP, P.O. Box 1642, Houston, Texas 77251–1642 or at estela.lozano@enbridge.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 5 motions to intervene are automatically granted by operation of Rule 214(c)(1).6 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.7 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– 5 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 6 18 CFR 385.214(c)(1). 7 18 CFR 385.214(b)(3) and (d). PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 48673 FERC, or on the FERC website www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on July 23, 2021. Dated: July 2, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–18666 Filed 8–30–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–234–000. Applicants: Highest Power Solar, LLC. Description: Self-Certification of Exempt Wholesale Generator of Highest Power Solar, LLC. Filed Date: 8/23/21. Accession Number: 20210823–5244. Comment Date: 5 p.m. ET 9/13/21. Docket Numbers: EG21–235–000. Applicants: Mark One Generating, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Mark One Generating, LLC. Filed Date: 8/25/21. Accession Number: 20210825–5076. Comment Date: 5 p.m. ET 9/15/21. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–2387–009; ER15–190–018; ER18–1343–010. Applicants: Carolina Solar Power, LLC, Duke Energy Renewable Services, LLC, Duke Energy Florida, Inc. Description: Amendment to March 26, 2021 Notice of Non-Material Change in Status of Duke Energy Florida, LLC. Filed Date: 6/29/21. E:\FR\FM\31AUN1.SGM 31AUN1 khammond on DSKJM1Z7X2PROD with NOTICES 48674 Federal Register / Vol. 86, No. 166 / Tuesday, August 31, 2021 / Notices Accession Number: 20210629–5138. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2426–000. Applicants: CPRE 1 Lessee, LLC. Description: Amendment to July 14, 2021 CPRE 1 Lessee, LLC tariff filing. Filed Date: 8/24/21. Accession Number: 20210824–5123. Comment Date: 5 p.m. ET 9/14/21. Docket Numbers: ER21–2757–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA 6160; Queue No. AG1– 362 to be effective 7/27/2021. Filed Date: 8/24/21. Accession Number: 20210824–5088. Comment Date: 5 p.m. ET 9/14/21. Docket Numbers: ER21–2758–000. Applicants: Southwestern Public Service Company. Description: § 205(d) Rate Filing: SPS–GSEC–RBEC-Amend IA–Faria– 724–0.1.0 to be effective 10/23/2021. Filed Date: 8/24/21. Accession Number: 20210824–5118. Comment Date: 5 p.m. ET 9/14/21. Docket Numbers: ER21–2759–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3641R1 Haystack Wind Project, LLC GIA to be effective 8/17/2021. Filed Date: 8/25/21. Accession Number: 20210825–5033. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2760–000. Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: MidAtlantic Interstate Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT submits four ECSAs, SA Nos. 6039, 6040, 6042 and 6048 to be effective 10/25/2021. Filed Date: 8/25/21. Accession Number: 20210825–5034. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2761–000. Applicants: American Transmission Systems, Incorporated, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: American Transmission Systems, Incorporated submits tariff filing per 35.13(a)(2)(iii: ATSI submits Six ECSAs, SA Nos. 6041 and 6043–6047 to be effective 10/25/2021. Filed Date: 8/25/21. Accession Number: 20210825–5035. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2762–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2021–08–25 Certificate of VerDate Sep<11>2014 20:08 Aug 30, 2021 Jkt 253001 Concurrence—Sol Catcher BESS LGIA to be effective 8/5/2021. Filed Date: 8/25/21. Accession Number: 20210825–5063. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2763–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Origis Holdings USA Subco (O’Hara I Storage) LGIA Filing to be effective 8/ 11/2021. Filed Date: 8/25/21. Accession Number: 20210825–5084. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2764–000. Applicants: Highest Power Solar, LLC. Description: Baseline eTariff Filing: Highest Power Solar, LLC MBR Tariff to be effective 8/26/2021. Filed Date: 8/25/21. Accession Number: 20210825–5086. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2765–000. Applicants: Ameren Illinois Company. Description: § 205(d) Rate Filing: Reimbursement Agreement, RS 154, Prairie Power East Quincy to be effective 10/25/2021. Filed Date: 8/25/21. Accession Number: 20210825–5091. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2766–000. Applicants: Central Line Solar, LLC. Description: Baseline eTariff Filing: Central Line Solar, LLC MBR Tariff to be effective 10/1/2021. Filed Date: 8/25/21. Accession Number: 20210825–5095. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2767–000. Applicants: Skipjack Solar Center, LLC. Description: Baseline eTariff Filing: Skipjack Solar Center, LLC MBR Tariff to be effective 10/1/2021. Filed Date: 8/25/21. Accession Number: 20210825–5096. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2768–000. Applicants: Nevada Power Company. Description: Compliance filing: OATT Revisions to Attachment K Compliance to be effective 1/1/2022. Filed Date: 8/25/21. Accession Number: 20210825–5097. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2769–000. Applicants: PGR 2021 Lessee 7, LLC. Description: Baseline eTariff Filing: PGR 2021 Lessee 7, LLC MBR Tariff to be effective 8/26/2021. Filed Date: 8/25/21. Accession Number: 20210825–5102. Comment Date: 5 p.m. ET 9/15/21. Docket Numbers: ER21–2770–000. PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revision to Remove Preemption of Short Term Non-Firm Point-to-Point Transmission to be effective 10/25/2021. Filed Date: 8/25/21. Accession Number: 20210825–5120. Comment Date: 5 p.m. ET 9/15/21. Take notice that the Commission received the following qualifying facility filings: Docket Numbers: QF21–1196–000. Applicants: Bloom Energy Corporation. Description: Form 556 of Bloom Energy Corporation [Billerica 1500kW]. Filed Date: 8/25/21. Accession Number: 20210825–5101. Comment Date: 5 p.m. ET 9/15/21. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR21–9–000. Applicants: North American Electric Reliability Corporation. Description: Request of North American Electric Reliability Corporation for Acceptance of 2022 Business Plans and Budgets of NERC and Regional Entities and for Approval of Proposed Assessments to Fund Budgets. Filed Date: 8/24/21. Accession Number: 20210824–5141. Comment Date: 5 p.m. ET 9/14/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/fercgen search.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 25, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–18738 Filed 8–30–21; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\31AUN1.SGM 31AUN1

Agencies

[Federal Register Volume 86, Number 166 (Tuesday, August 31, 2021)]
[Notices]
[Pages 48673-48674]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-18738]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG21-234-000.
    Applicants: Highest Power Solar, LLC.
    Description: Self-Certification of Exempt Wholesale Generator of 
Highest Power Solar, LLC.
    Filed Date: 8/23/21.
    Accession Number: 20210823-5244.
    Comment Date: 5 p.m. ET 9/13/21.

    Docket Numbers: EG21-235-000.
    Applicants: Mark One Generating, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Mark One Generating, LLC.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5076.
    Comment Date: 5 p.m. ET 9/15/21.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER13-2387-009; ER15-190-018; ER18-1343-010.
    Applicants: Carolina Solar Power, LLC, Duke Energy Renewable 
Services, LLC, Duke Energy Florida, Inc.
    Description: Amendment to March 26, 2021 Notice of Non-Material 
Change in Status of Duke Energy Florida, LLC.
    Filed Date: 6/29/21.

[[Page 48674]]

    Accession Number: 20210629-5138.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2426-000.
    Applicants: CPRE 1 Lessee, LLC.
    Description: Amendment to July 14, 2021 CPRE 1 Lessee, LLC tariff 
filing.
    Filed Date: 8/24/21.
    Accession Number: 20210824-5123.
    Comment Date: 5 p.m. ET 9/14/21.

    Docket Numbers: ER21-2757-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Original WMPA 6160; Queue 
No. AG1-362 to be effective 7/27/2021.
    Filed Date: 8/24/21.
    Accession Number: 20210824-5088.
    Comment Date: 5 p.m. ET 9/14/21.

    Docket Numbers: ER21-2758-000.
    Applicants: Southwestern Public Service Company.
    Description: Sec.  205(d) Rate Filing: SPS-GSEC-RBEC-Amend IA-
Faria-724-0.1.0 to be effective 10/23/2021.
    Filed Date: 8/24/21.
    Accession Number: 20210824-5118.
    Comment Date: 5 p.m. ET 9/14/21.

    Docket Numbers: ER21-2759-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Sec.  205(d) Rate Filing: 3641R1 Haystack Wind 
Project, LLC GIA to be effective 8/17/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5033.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2760-000.
    Applicants: Mid-Atlantic Interstate Transmission, LLC, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Mid-Atlantic Interstate 
Transmission, LLC submits tariff filing per 35.13(a)(2)(iii: MAIT 
submits four ECSAs, SA Nos. 6039, 6040, 6042 and 6048 to be effective 
10/25/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5034.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2761-000.
    Applicants: American Transmission Systems, Incorporated, PJM 
Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: American Transmission 
Systems, Incorporated submits tariff filing per 35.13(a)(2)(iii: ATSI 
submits Six ECSAs, SA Nos. 6041 and 6043-6047 to be effective 10/25/
2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5035.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2762-000.
    Applicants: California Independent System Operator Corporation.
    Description: Sec.  205(d) Rate Filing: 2021-08-25 Certificate of 
Concurrence--Sol Catcher BESS LGIA to be effective 8/5/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5063.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2763-000.
    Applicants: Alabama Power Company.
    Description: Sec.  205(d) Rate Filing: Origis Holdings USA Subco 
(O'Hara I Storage) LGIA Filing to be effective 8/11/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5084.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2764-000.
    Applicants: Highest Power Solar, LLC.
    Description: Baseline eTariff Filing: Highest Power Solar, LLC MBR 
Tariff to be effective 8/26/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5086.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2765-000.
    Applicants: Ameren Illinois Company.
    Description: Sec.  205(d) Rate Filing: Reimbursement Agreement, RS 
154, Prairie Power East Quincy to be effective 10/25/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5091.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2766-000.
    Applicants: Central Line Solar, LLC.
    Description: Baseline eTariff Filing: Central Line Solar, LLC MBR 
Tariff to be effective 10/1/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5095.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2767-000.
    Applicants: Skipjack Solar Center, LLC.
    Description: Baseline eTariff Filing: Skipjack Solar Center, LLC 
MBR Tariff to be effective 10/1/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5096.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2768-000.
    Applicants: Nevada Power Company.
    Description: Compliance filing: OATT Revisions to Attachment K 
Compliance to be effective 1/1/2022.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5097.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2769-000.
    Applicants: PGR 2021 Lessee 7, LLC.
    Description: Baseline eTariff Filing: PGR 2021 Lessee 7, LLC MBR 
Tariff to be effective 8/26/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5102.
    Comment Date: 5 p.m. ET 9/15/21.

    Docket Numbers: ER21-2770-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Sec.  205(d) Rate Filing: Revision to Remove 
Preemption of Short Term Non-Firm Point-to-Point Transmission to be 
effective 10/25/2021.
    Filed Date: 8/25/21.
    Accession Number: 20210825-5120.
    Comment Date: 5 p.m. ET 9/15/21.

    Take notice that the Commission received the following qualifying 
facility filings:

    Docket Numbers: QF21-1196-000.
    Applicants: Bloom Energy Corporation.
    Description: Form 556 of Bloom Energy Corporation [Billerica 
1500kW].
    Filed Date: 8/25/21.
    Accession Number: 20210825-5101.
    Comment Date: 5 p.m. ET 9/15/21.

    Take notice that the Commission received the following electric 
reliability filings:

    Docket Numbers: RR21-9-000.
    Applicants: North American Electric Reliability Corporation.
    Description: Request of North American Electric Reliability 
Corporation for Acceptance of 2022 Business Plans and Budgets of NERC 
and Regional Entities and for Approval of Proposed Assessments to Fund 
Budgets.
    Filed Date: 8/24/21.
    Accession Number: 20210824-5141.
    Comment Date: 5 p.m. ET 9/14/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 25, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-18738 Filed 8-30-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.