Environmental Impact Statements; Notice of Availability, 46847 [2021-17868]

Download as PDF Federal Register / Vol. 86, No. 159 / Friday, August 20, 2021 / Notices 46847 TABLE II—NOCS APPROVED * FROM 07/01/2021 TO 07/31/2021—Continued If amendment, type of amendment Received date Commencement date P–19–0133 ..... 07/08/2021 07/03/2021 N P–20–0153 ..... 06/29/2021 06/15/2021 N P–20–0154 ..... 06/29/2021 06/15/2021 N P–21–0020 ..... 07/30/2021 07/29/2021 N Case No. Chemical substance (G) Heterotrisubstituted-bile acid, 1-(difluorosulfomethyl)-2,2,2trifluoroethyl ester, ion(1-), (5)-, triphenylsulfonium (1:1),. (S) Amines, polyethylenepoly-, reaction products with succinic anhydride polyisobutenyl derivs., borated. (S) 2,5-furandione, dihydro-, polyisobutenyl derivs., reaction products with triethylenetetramine, borated. (G) Alkanedioic acid, dialkyl ester, polymer with dialkyl-alkanediol, alkyl(substituted alkyl)-alkanediol and heteropolycycle. * The term ‘Approved’ indicates that a submission has passed a quick initial screen ensuring all required information and documents have been provided with the submission. In Table III of this unit, EPA provides the following information (to the extent such information is not subject to a CBI claim) on the test information that has been received during this time period: The EPA case number assigned to the test information; the date the test information was received by EPA, the type of test information submitted, and chemical substance identity. TABLE III—TEST INFORMATION RECEIVED FROM 07/01/2021 TO 07/31/2021 Case No. Received date P–14–0712 ...... 07/09/2021 P–14–0712 ...... 07/09/2021 P–16–0462 ...... P–16–0543 ...... 07/27/2021 06/29/2021 Type of test information Quarterly PCDD/F Test of PMN Substance using EPA Test Method 8290A. Quarterly PCDD/F Test of PMN Substance using EPA Test Method 8290A. Quarter 2 Metals Report .............................................. Exposure Monitoring Report May 2021 ...................... If you are interested in information that is not included in these tables, you may contact EPA’s technical information contact or general information contact as described under FOR FURTHER INFORMATION CONTACT to access additional non-CBI information that may be available. Authority: 15 U.S.C. 2601 et seq. Dated: August 12, 2021. Pamela Myrick, Director, Project Management and Operations Division, Office of Pollution Prevention and Toxics. [FR Doc. 2021–17893 Filed 8–19–21; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9057–9] khammond on DSKJM1Z7X2PROD with NOTICES Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/nepa. Weekly receipt of Environmental Impact Statements (EIS) Filed August 9, 2021 10 a.m. EST Through August 16, 2021 10 a.m. EST Pursuant to 40 CFR 1506.9. Notice: Section 309(a) of the Clean Air Act requires that EPA make public its VerDate Sep<11>2014 17:27 Aug 19, 2021 Chemical substance Jkt 253001 (G) Plastics, wastes, pyrolyzed, bulk pyrolysate. (G) Plastics, wastes, pyrolyzed, bulk pyrolysate. (G) Silane-treated aluminosilicate. (G) Halogenophosphoric acid metal salt. comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20210117, Draft, NOAA, CA, Amendment 6 to the Fishery Management Plan for West Coast Highly Migratory Species Fisheries: Authorization of Deep-set Buoy Gear, Comment Period Ends: 10/04/2021, Contact: Amber Rhodes 562–477– 8342. EIS No. 20210118, Draft Supplement, NHTSA, REG, Model Year 2024–2026 Corporate Average Fuel Economy Standards, Comment Period Ends: 10/ 04/2021, Contact: Vinay Nagabhushana 202–366–1452. EIS No. 20210119, Final, AZDOT, AZ, North-South Corridor Study Tier 1, Contact: Katie Rodriguez 480–521– 8887. Under 23 U.S.C. 139(n)(2), AZDOT has issued a single document that consists of a final environmental impact statement and record of decision. Therefore, the 30-day wait/review period under NEPA does not apply to this action. EIS No. 20210120, Final, BLM, NV, Relief Canyon Mine Project, Review Period Ends: 09/20/2021, Contact: Jeanette Black 775–623–1500. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 EIS No. 20210121, Final, BOEM, MA, South Fork Wind Farm and South Fork Export Cable Project, Review Period Ends: 09/20/2021, Contact: Michelle Morin 703–787–1722. Dated: August 16, 2021. Candi Schaedle, Acting Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2021–17868 Filed 8–19–21; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–SFUND–2004–0006; FRL 8815– 01–OLEM] Proposed Information Collection Request; Comment Request: Community Right-to-Know Reporting Requirements Under Sections 311 and 312 of the Emergency Planning and Community Right-to-Know Act (EPCRA), EPA ICR Number 1352.16, OMB Control Number 2050–0072 Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: The Environmental Protection Agency is planning to submit an information collection request (ICR), ‘‘Community Right-to-Know Reporting SUMMARY: E:\FR\FM\20AUN1.SGM 20AUN1

Agencies

[Federal Register Volume 86, Number 159 (Friday, August 20, 2021)]
[Notices]
[Page 46847]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-17868]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9057-9]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information 202-564-5632 or https://www.epa.gov/nepa.

Weekly receipt of Environmental Impact Statements (EIS)
Filed August 9, 2021 10 a.m. EST Through August 16, 2021 10 a.m. EST
Pursuant to 40 CFR 1506.9.

    Notice: Section 309(a) of the Clean Air Act requires that EPA make 
public its comments on EISs issued by other Federal agencies. EPA's 
comment letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.

EIS No. 20210117, Draft, NOAA, CA, Amendment 6 to the Fishery 
Management Plan for West Coast Highly Migratory Species Fisheries: 
Authorization of Deep-set Buoy Gear, Comment Period Ends: 10/04/2021, 
Contact: Amber Rhodes 562-477-8342.
EIS No. 20210118, Draft Supplement, NHTSA, REG, Model Year 2024-2026 
Corporate Average Fuel Economy Standards, Comment Period Ends: 10/04/
2021, Contact: Vinay Nagabhushana 202-366-1452.
EIS No. 20210119, Final, AZDOT, AZ, North-South Corridor Study Tier 1, 
Contact: Katie Rodriguez 480-521-8887.

    Under 23 U.S.C. 139(n)(2), AZDOT has issued a single document that 
consists of a final environmental impact statement and record of 
decision. Therefore, the 30-day wait/review period under NEPA does not 
apply to this action.

EIS No. 20210120, Final, BLM, NV, Relief Canyon Mine Project, Review 
Period Ends: 09/20/2021, Contact: Jeanette Black 775-623-1500.
EIS No. 20210121, Final, BOEM, MA, South Fork Wind Farm and South Fork 
Export Cable Project, Review Period Ends: 09/20/2021, Contact: Michelle 
Morin 703-787-1722.

    Dated: August 16, 2021.
Candi Schaedle,
Acting Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. 2021-17868 Filed 8-19-21; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.