Environmental Impact Statements; Notice of Availability, 46847 [2021-17868]
Download as PDF
Federal Register / Vol. 86, No. 159 / Friday, August 20, 2021 / Notices
46847
TABLE II—NOCS APPROVED * FROM 07/01/2021 TO 07/31/2021—Continued
If amendment,
type of
amendment
Received date
Commencement
date
P–19–0133 .....
07/08/2021
07/03/2021
N
P–20–0153 .....
06/29/2021
06/15/2021
N
P–20–0154 .....
06/29/2021
06/15/2021
N
P–21–0020 .....
07/30/2021
07/29/2021
N
Case No.
Chemical substance
(G) Heterotrisubstituted-bile acid, 1-(difluorosulfomethyl)-2,2,2trifluoroethyl ester, ion(1-), (5)-, triphenylsulfonium (1:1),.
(S) Amines, polyethylenepoly-, reaction products with succinic anhydride
polyisobutenyl derivs., borated.
(S) 2,5-furandione, dihydro-, polyisobutenyl derivs., reaction products
with triethylenetetramine, borated.
(G) Alkanedioic acid, dialkyl ester, polymer with dialkyl-alkanediol,
alkyl(substituted alkyl)-alkanediol and heteropolycycle.
* The term ‘Approved’ indicates that a submission has passed a quick initial screen ensuring all required information and documents have been
provided with the submission.
In Table III of this unit, EPA provides
the following information (to the extent
such information is not subject to a CBI
claim) on the test information that has
been received during this time period:
The EPA case number assigned to the
test information; the date the test
information was received by EPA, the
type of test information submitted, and
chemical substance identity.
TABLE III—TEST INFORMATION RECEIVED FROM 07/01/2021 TO 07/31/2021
Case No.
Received date
P–14–0712 ......
07/09/2021
P–14–0712 ......
07/09/2021
P–16–0462 ......
P–16–0543 ......
07/27/2021
06/29/2021
Type of test information
Quarterly PCDD/F Test of PMN Substance using
EPA Test Method 8290A.
Quarterly PCDD/F Test of PMN Substance using
EPA Test Method 8290A.
Quarter 2 Metals Report ..............................................
Exposure Monitoring Report May 2021 ......................
If you are interested in information
that is not included in these tables, you
may contact EPA’s technical
information contact or general
information contact as described under
FOR FURTHER INFORMATION CONTACT to
access additional non-CBI information
that may be available.
Authority: 15 U.S.C. 2601 et seq.
Dated: August 12, 2021.
Pamela Myrick,
Director, Project Management and Operations
Division, Office of Pollution Prevention and
Toxics.
[FR Doc. 2021–17893 Filed 8–19–21; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9057–9]
khammond on DSKJM1Z7X2PROD with NOTICES
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed August 9, 2021 10 a.m. EST
Through August 16, 2021 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air
Act requires that EPA make public its
VerDate Sep<11>2014
17:27 Aug 19, 2021
Chemical substance
Jkt 253001
(G) Plastics, wastes, pyrolyzed, bulk pyrolysate.
(G) Plastics, wastes, pyrolyzed, bulk pyrolysate.
(G) Silane-treated aluminosilicate.
(G) Halogenophosphoric acid metal salt.
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20210117, Draft, NOAA, CA,
Amendment 6 to the Fishery
Management Plan for West Coast
Highly Migratory Species Fisheries:
Authorization of Deep-set Buoy Gear,
Comment Period Ends: 10/04/2021,
Contact: Amber Rhodes 562–477–
8342.
EIS No. 20210118, Draft Supplement,
NHTSA, REG, Model Year 2024–2026
Corporate Average Fuel Economy
Standards, Comment Period Ends: 10/
04/2021, Contact: Vinay
Nagabhushana 202–366–1452.
EIS No. 20210119, Final, AZDOT, AZ,
North-South Corridor Study Tier 1,
Contact: Katie Rodriguez 480–521–
8887.
Under 23 U.S.C. 139(n)(2), AZDOT
has issued a single document that
consists of a final environmental impact
statement and record of decision.
Therefore, the 30-day wait/review
period under NEPA does not apply to
this action.
EIS No. 20210120, Final, BLM, NV,
Relief Canyon Mine Project, Review
Period Ends: 09/20/2021, Contact:
Jeanette Black 775–623–1500.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
EIS No. 20210121, Final, BOEM, MA,
South Fork Wind Farm and South
Fork Export Cable Project, Review
Period Ends: 09/20/2021, Contact:
Michelle Morin 703–787–1722.
Dated: August 16, 2021.
Candi Schaedle,
Acting Director, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2021–17868 Filed 8–19–21; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–SFUND–2004–0006; FRL 8815–
01–OLEM]
Proposed Information Collection
Request; Comment Request:
Community Right-to-Know Reporting
Requirements Under Sections 311 and
312 of the Emergency Planning and
Community Right-to-Know Act
(EPCRA), EPA ICR Number 1352.16,
OMB Control Number 2050–0072
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency is planning to submit an
information collection request (ICR),
‘‘Community Right-to-Know Reporting
SUMMARY:
E:\FR\FM\20AUN1.SGM
20AUN1
Agencies
[Federal Register Volume 86, Number 159 (Friday, August 20, 2021)]
[Notices]
[Page 46847]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-17868]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9057-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact Statements (EIS)
Filed August 9, 2021 10 a.m. EST Through August 16, 2021 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air Act requires that EPA make
public its comments on EISs issued by other Federal agencies. EPA's
comment letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20210117, Draft, NOAA, CA, Amendment 6 to the Fishery
Management Plan for West Coast Highly Migratory Species Fisheries:
Authorization of Deep-set Buoy Gear, Comment Period Ends: 10/04/2021,
Contact: Amber Rhodes 562-477-8342.
EIS No. 20210118, Draft Supplement, NHTSA, REG, Model Year 2024-2026
Corporate Average Fuel Economy Standards, Comment Period Ends: 10/04/
2021, Contact: Vinay Nagabhushana 202-366-1452.
EIS No. 20210119, Final, AZDOT, AZ, North-South Corridor Study Tier 1,
Contact: Katie Rodriguez 480-521-8887.
Under 23 U.S.C. 139(n)(2), AZDOT has issued a single document that
consists of a final environmental impact statement and record of
decision. Therefore, the 30-day wait/review period under NEPA does not
apply to this action.
EIS No. 20210120, Final, BLM, NV, Relief Canyon Mine Project, Review
Period Ends: 09/20/2021, Contact: Jeanette Black 775-623-1500.
EIS No. 20210121, Final, BOEM, MA, South Fork Wind Farm and South Fork
Export Cable Project, Review Period Ends: 09/20/2021, Contact: Michelle
Morin 703-787-1722.
Dated: August 16, 2021.
Candi Schaedle,
Acting Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2021-17868 Filed 8-19-21; 8:45 am]
BILLING CODE 6560-50-P