The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
l. The application is not ready for
environmental analysis at this time.
m. The existing Sugar River II
Hydroelectric Project consists of: (1) A
113.5-foot-long, 10-foot-high reinforced
concrete dam that includes the
following sections: (a) A 35-foot-long
left abutment section with a cut-off wall;
(b) a 42.5-foot-long spillway section
with a crest elevation of 822 feet
National Geodetic Vertical Datum 1929
(NGVD 29) that contains: (i) Two 11.5foot-wide, 10-foot-high stanchion bays
equipped with wooden stop logs; (ii) a
13-foot-wide, 10-foot-high
hydraulically-operated steel slide gate;
and (iii) a 3-foot-wide sluiceway; and (c)
a 36-foot-long right abutment section
with a cut-off wall; (2) a 1.4-acre
impoundment with a storage capacity of
11 acre-feet at an elevation of 822 feet
NGVD 29; (3) a 14-foot-wide, 12-foothigh intake structure adjacent to the
right abutment equipped with a
trashrack with 1-inch clear bar spacing;
(4) a 650-foot-long buried penstock that
includes a 400-foot-long, 7-footdiameter steel section and a 250-footlong, 7-foot-diameter concrete section;
(5) a 35-foot-long, 27-foot-wide concrete
and brick masonry powerhouse
containing a single 200-kilowatt
Francis-type turbine-generator unit; (6) a
75-foot-long, 4.16-kilovolt overhead
transmission line and a transformer that
connects the project to the local utility
distribution system; and (7) appurtenant
facilities.
Downstream fish passage facilities
include the 3-foot-wide sluiceway in the
dam spillway and a 3-foot-deep plunge
pool located downstream of the
stanchion bays. The project also
includes an existing parking area on the
north bank of the project’s
impoundment.
Article 402 of the current license
requires the licensee to operate the
project in an instantaneous run-of-river
mode. The project is operated in a runof-river mode by manually raising and
lowering the spillway slide gate, and
removing/adding stop logs to the
stanchion bays to pass flows and
maintain a constant impoundment
water surface elevation of 822 feet
NGVD 29. The project creates an
VerDate Sep<11>2014
17:28 Aug 18, 2021
Jkt 253001
approximately 400-foot-long bypassed
reach of the Sugar River.
Article 403 of the current license, as
amended on June 27, 1996, requires a
minimum flow release to the bypassed
reach of: (1) 15 cubic feet per second
(cfs) or inflow, whichever is less,
through the downstream fishway from
June 16 through March 31 to protect
aquatic resources and water quality in
the bypassed reach; and (2) 20 cfs from
April 1 through June 15, during the
downstream migration season for
Atlantic Salmon smolts. The average
annual energy production of the project
from 2010 to 2015 was 650.44 MWh.
New Hampshire Renewable proposes
to: (1) Continue to operate the project in
an instantaneous run-of-river mode,
such that project outflow approximates
inflow; (2) release a year-round
minimum flow of 15 cfs; (3) install an
automation system to operate the project
in a run-of-river mode; and (4) consult
with the New Hampshire State Historic
Preservation Officer before beginning
any land-disturbing activities or
alterations to known historic structures
within the project boundary.
n. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents via the
internet through the Commission’s
Home Page (https://www.ferc.gov) using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
o. You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Scoping Process
Commission staff will prepare either
an environmental assessment (EA) or an
Environmental Impact Statement (EIS)
that describes and evaluates the
probable effects, if any, of the licensee’s
proposed action and alternatives. The
EA or EIS will consider environmental
impacts and reasonable alternatives to
the proposed action. The Commission’s
scoping process will help determine the
required level of analysis and satisfy the
NEPA scoping requirements,
irrespective of whether the Commission
prepares an EA or an EIS. At this time,
we do not anticipate holding on-site
scoping meetings. Instead, we are
soliciting written comments and
suggestions on the preliminary list of
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
issues and alternatives to be addressed
in the NEPA document, as described in
scoping document 1 (SD1), issued
August 13, 2021.
Copies of the SD1 outlining the
subject areas to be addressed in the
NEPA document were distributed to the
parties on the Commission’s mailing list
and the applicant’s distribution list.
Copies of the SD1 may be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
Dated: August 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–17783 Filed 8–18–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2879–012]
Green Mountain Power Corporation;
Notice of Availability of Draft
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for license for the Bolton
Falls Hydroelectric Project, located on
the Winooski River in Washington
County, Vermont, and has prepared a
Draft Environmental Assessment (DEA)
for the project. No federal land is
occupied by project works or located
within the project boundary.
The DEA contains staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
E:\FR\FM\19AUN1.SGM
19AUN1
Federal Register / Vol. 86, No. 158 / Thursday, August 19, 2021 / Notices
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/
eSubscription.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://ferconline.ferc.gov/
FERCOnline.aspx. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
ferconline.ferc.gov/Quick
Comment.aspx. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, you may submit
a paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–2879–
012.
Any questions regarding this notice
may be directed to Michael Tust at (202)
502–6522 or michael.tust@ferc.gov.
Dated: August 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–17784 Filed 8–18–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSK11XQN23PROD with NOTICES1
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–217–000.
Applicants: Delilah Solar Energy LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Delilah Solar Energy
LLC.
VerDate Sep<11>2014
17:28 Aug 18, 2021
Jkt 253001
Filed Date: 8/13/21.
Accession Number: 20210813–5030.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: EG21–218–000.
Applicants: E. BarreCo Corp LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of E. BarreCo Corp
LLC.
Filed Date: 8/13/21.
Accession Number: 20210813–5051.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: EG21–219–000.
Applicants: Lick Creek Solar, LLC.
Description: Self-Certification of EG or
FC of Lick Creek Solar, LLC.
Filed Date: 8/13/21.
Accession Number: 20210813–5150.
Comment Date: 5 p.m. ET 9/3/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–1734–002.
Applicants: Alabama Power
Company.
Description: Compliance filing: Order
No. 864 OATT Second Deficiency
Response Filing to be effective N/A.
Filed Date: 8/13/21.
Accession Number: 20210813–5153.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER21–1858–002.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: Tariff Amendment:
CAPX2020–BRKGS–OMA–537–Supp
Filing–0.1.2 to be effective 10/12/2021.
Filed Date: 8/13/21.
Accession Number: 20210813–5148.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER21–1934–002.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: Tariff Amendment:
CAPX2020-Fargo-OMA–307–
Supplemental Filing 0.1.2 to be effective
10/12/2021.
Filed Date: 8/13/21.
Accession Number: 20210813–5135.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER21–2670–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, SA No. 6125 and Original
ICSA, SA No. 6126; Queue No. AD2–
134 to be effective 7/16/2021.
Filed Date: 8/12/21.
Accession Number: 20210812–5137.
Comment Date: 5 p.m. ET 9/2/21.
Docket Numbers: ER21–2672–000.
Applicants: New York Transco, LLC,
New York Independent System
Operator, Inc.
Description: § 205(d) Rate Filing: New
York Transco, LLC submits tariff filing
per 35.13(a)(2)(iii: 205 EPCA among
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
46693
Transco, ADM Milling and NYISO SA
No. 2643 to be effective 7/28/2021.
Filed Date: 8/13/21.
Accession Number: 20210813–5125.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER21–2673–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA 6159; Queue No. AG1–
148 to be effective 7/14/2021.
Filed Date: 8/13/21.
Accession Number: 20210813–5126.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER21–2674–000.
Applicants: Borderlands Wind, LLC.
Description: Baseline eTariff Filing:
Borderlands Wind, LLC Application for
Market-Based Rate Authorization to be
effective 10/12/2021.
Filed Date: 8/13/21.
Accession Number: 20210813–5138.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER21–2675–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3285R4 AEP Energy Partners, Inc.
NITSA and NOA Cancellation to be
effective 7/1/2021.
Filed Date: 8/13/21.
Accession Number: 20210813–5140.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER21–2676–000.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Overlapping Congestion Compliance
Filing in Response to Order in EL17–89
to be effective 3/31/2022.
Filed Date: 8/13/21.
Accession Number: 20210813–5144.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER21–2677–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2021–
08–13_MISO and SPP Compliance filing
re Pseudo-Tie to be effective 3/31/2022.
Filed Date: 8/13/21.
Accession Number: 20210813–5145.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER21–669–004.
Applicants: Morongo Transmission
LLC.
Description: Compliance filing:
Amended Compliance Filing to be
effective 5/15/2021.
Filed Date: 8/12/21.
Accession Number: 20210812–5144.
Comment Date: 5 p.m. ET 9/2/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
E:\FR\FM\19AUN1.SGM
19AUN1
Agencies
[Federal Register Volume 86, Number 158 (Thursday, August 19, 2021)]
[Notices]
[Pages 46692-46693]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-17784]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2879-012]
Green Mountain Power Corporation; Notice of Availability of Draft
Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for license for the Bolton Falls Hydroelectric
Project, located on the Winooski River in Washington County, Vermont,
and has prepared a Draft Environmental Assessment (DEA) for the
project. No federal land is occupied by project works or located within
the project boundary.
The DEA contains staff's analysis of the potential environmental
impacts of the project and concludes that licensing the project, with
appropriate environmental protective measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
The Commission provides all interested persons with an opportunity
to view and/or print the EA via the internet through the Commission's
Home Page (https://www.ferc.gov/), using the ``eLibrary'' link. Enter
the docket number, excluding the last three digits in the docket number
field, to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room, due to the
proclamation declaring a National Emergency concerning the
[[Page 46693]]
Novel Coronavirus Disease (COVID-19), issued by the President on March
13, 2020. For assistance, contact FERC Online Support at
[email protected], or toll-free at (866) 208-3676, or for TTY,
(202) 502-8659.
You may also register online at https://ferconline.ferc.gov/eSubscription.aspx to be notified via email of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
Any comments should be filed within 30 days from the date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://ferconline.ferc.gov/Quick Comment.aspx. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support. In lieu
of electronic filing, you may submit a paper copy. Submissions sent via
the U.S. Postal Service must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Room 1A, Washington, DC 20426. Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
The first page of any filing should include docket number P-2879-012.
Any questions regarding this notice may be directed to Michael Tust
at (202) 502-6522 or [email protected].
Dated: August 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-17784 Filed 8-18-21; 8:45 am]