Federal Register / Vol. 86, No. 157 / Wednesday, August 18, 2021 / Notices
turbine, plus 20 cfs minimum bypass
release at the dam and an additional 10
cfs flow routed through the Mill Pond
gatehouse to the Mill Pond and canal)
and 1,100 cfs (maximum hydraulic
capacity of the plant—two turbines
combined) or a river flow of 1,130 cfs.
Any flow above the capacity of the
turbines plus minimum bypass flow and
Mill pond diversion is spilled over the
dam spillway and through the overflow
section of the flood sluice gate.
o. In addition to publishing the full
text of this notice in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
notice, as well as other documents in
the proceeding (e.g., license application)
via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document (P–3442).
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
jbell on DSKJLSW7X2PROD with NOTICES
Milestone
Issue Deficiency Letter.
Request Additional Information.
Issue Notice of Acceptance.
Issue Scoping Document 1 for Comments.
Comments on
Scoping Document
1 Due.
Issue Scoping Document 2.
Issue Notice of Ready
for Environmental
Analysis.
Target date
September 2021.
September 2021.
January 2022.
January 2022.
March 2022.
April 2022.
April 2022.
q. Final amendments to the
application must be filed with the
VerDate Sep<11>2014
17:34 Aug 17, 2021
Jkt 253001
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: August 12, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–17700 Filed 8–17–21; 8:45 am]
BILLING CODE 6717–01–P
46237
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at:https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 12, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–17707 Filed 8–17–21; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP21–1030–000.
Applicants: Fieldwood Energy LLC,
Fieldwood Energy Offshore LLC,
QuarterNorth Energy LLC, GOM Shelf
LLC.
Description: Joint Petition of
Fieldwood Energy LLC et al for Limited
Waiver of ‘‘shipper-must-have-title’’
Policy, Request for Expedited Action
and Shortened Comment Period.
Filed Date: 8/11/21.
Accession Number: 20210811–5078.
Comment Date: 5 p.m. ET 8/18/21.
Docket Numbers: RP21–1031–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
202108012 Carlton Flow Obligation to
be effective 11/1/2021.
Filed Date: 8/12/21.
Accession Number: 20210812–5043.
Comment Date: 5 p.m. ET 8/24/21.
Docket Numbers: RP21–1032–000.
Applicants: DBM Pipeline, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing to be effective 8/
1/2021.
Filed Date: 8/12/21.
Accession Number: 20210812–5084.
Comment Date: 5 p.m. ET 8/24/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. ER21–2652–000]
Caddo Wind, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Caddo
Wind, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September 1,
2021.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
E:\FR\FM\18AUN1.SGM
18AUN1
46238
Federal Register / Vol. 86, No. 157 / Wednesday, August 18, 2021 / Notices
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: August 12, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–17708 Filed 8–17–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL21–95–000]
jbell on DSKJLSW7X2PROD with NOTICES
Kendall County Solar Project, LLC v.
PJM Interconnection, L.L.C.; Notice of
Complaint
Take notice that on August 9, 2021,
pursuant to sections 206, 306, and 309
of the Federal Power Act (FPA), 16
U.S.C. 824e, 825e, and 825h and Rule
206 of the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206,
Kendall County Solar Project, LLC
(Kendall County Solar or Complainant)
filed a formal complaint against PJM
Interconnection, L.L.C. (PJM or
Respondent), alleging that PJM has
failed to follow its Open Access
Transmission Tariff and has processed
Kendall County Solar’s Interconnection
Request in an unjust, unreasonable,
unduly discriminatory, and preferential
manner, all as more fully explained in
its complaint.
The Complainant certify that copies of
the complaint were served on the
contacts listed for Respondent in the
Commission’s list of Corporate Officials.
VerDate Sep<11>2014
17:34 Aug 17, 2021
Jkt 253001
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainant.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First
Street, NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov, or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on August 30, 2021.
Dated: August 12, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–17699 Filed 8–17–21; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 4718–039]
Cocheco Falls Associates; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 4718–039.
c. Date Filed: December 29, 2020.
d. Applicant: Cocheco Falls
Associates (CFA).
e. Name of Project: Cocheco Falls
Dam Project.
f. Location: On the Cocheco River in
the city of Dover, Strafford County, New
Hampshire. The project does not occupy
federal land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. John
Webster, Cocheco Falls Associates, P.O.
Box 178, South Berwick, ME 03908;
Phone at (207) 384–5334, or email at
Hydromagnt@gwi.net.
i. FERC Contact: Amy Chang at (202)
502–8250, or amy.chang@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and protests, comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
E:\FR\FM\18AUN1.SGM
18AUN1
Agencies
[Federal Register Volume 86, Number 157 (Wednesday, August 18, 2021)]
[Notices]
[Pages 46237-46238]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-17708]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER21-2652-000]
Caddo Wind, LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced proceeding of
Caddo Wind, LLC's application for market-based rate authority, with an
accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE, Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is September 1, 2021.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically may mail similar pleadings to
the Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426. Hand delivered submissions in
[[Page 46238]]
docketed proceedings should be delivered to Health and Human Services,
12225 Wilkins Avenue, Rockville, Maryland 20852.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://www.ferc.gov) using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Dated: August 12, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-17708 Filed 8-17-21; 8:45 am]
BILLING CODE 6717-01-P