Combined Notice of Filings, 46237 [2021-17707]

Download as PDF Federal Register / Vol. 86, No. 157 / Wednesday, August 18, 2021 / Notices turbine, plus 20 cfs minimum bypass release at the dam and an additional 10 cfs flow routed through the Mill Pond gatehouse to the Mill Pond and canal) and 1,100 cfs (maximum hydraulic capacity of the plant—two turbines combined) or a river flow of 1,130 cfs. Any flow above the capacity of the turbines plus minimum bypass flow and Mill pond diversion is spilled over the dam spillway and through the overflow section of the flood sluice gate. o. In addition to publishing the full text of this notice in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this notice, as well as other documents in the proceeding (e.g., license application) via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document (P–3442). At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19) issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). You may also register online at https://ferconline.ferc.gov/ FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. jbell on DSKJLSW7X2PROD with NOTICES Milestone Issue Deficiency Letter. Request Additional Information. Issue Notice of Acceptance. Issue Scoping Document 1 for Comments. Comments on Scoping Document 1 Due. Issue Scoping Document 2. Issue Notice of Ready for Environmental Analysis. Target date September 2021. September 2021. January 2022. January 2022. March 2022. April 2022. April 2022. q. Final amendments to the application must be filed with the VerDate Sep<11>2014 17:34 Aug 17, 2021 Jkt 253001 Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: August 12, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–17700 Filed 8–17–21; 8:45 am] BILLING CODE 6717–01–P 46237 requirements, interventions, protests, service, and qualifying facilities filings can be found at:https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 12, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–17707 Filed 8–17–21; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP21–1030–000. Applicants: Fieldwood Energy LLC, Fieldwood Energy Offshore LLC, QuarterNorth Energy LLC, GOM Shelf LLC. Description: Joint Petition of Fieldwood Energy LLC et al for Limited Waiver of ‘‘shipper-must-have-title’’ Policy, Request for Expedited Action and Shortened Comment Period. Filed Date: 8/11/21. Accession Number: 20210811–5078. Comment Date: 5 p.m. ET 8/18/21. Docket Numbers: RP21–1031–000. Applicants: Northern Natural Gas Company. Description: § 4(d) Rate Filing: 202108012 Carlton Flow Obligation to be effective 11/1/2021. Filed Date: 8/12/21. Accession Number: 20210812–5043. Comment Date: 5 p.m. ET 8/24/21. Docket Numbers: RP21–1032–000. Applicants: DBM Pipeline, LLC. Description: § 4(d) Rate Filing: Negotiated Rate Filing to be effective 8/ 1/2021. Filed Date: 8/12/21. Accession Number: 20210812–5084. Comment Date: 5 p.m. ET 8/24/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing PO 00000 Frm 00064 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. ER21–2652–000] Caddo Wind, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Caddo Wind, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is September 1, 2021. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in E:\FR\FM\18AUN1.SGM 18AUN1

Agencies

[Federal Register Volume 86, Number 157 (Wednesday, August 18, 2021)]
[Notices]
[Page 46237]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-17707]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: RP21-1030-000.
    Applicants: Fieldwood Energy LLC, Fieldwood Energy Offshore LLC, 
QuarterNorth Energy LLC, GOM Shelf LLC.
    Description: Joint Petition of Fieldwood Energy LLC et al for 
Limited Waiver of ``shipper-must-have-title'' Policy, Request for 
Expedited Action and Shortened Comment Period.
    Filed Date: 8/11/21.
    Accession Number: 20210811-5078.
    Comment Date: 5 p.m. ET 8/18/21.

    Docket Numbers: RP21-1031-000.
    Applicants: Northern Natural Gas Company.
    Description: Sec.  4(d) Rate Filing: 202108012 Carlton Flow 
Obligation to be effective 11/1/2021.
    Filed Date: 8/12/21.
    Accession Number: 20210812-5043.
    Comment Date: 5 p.m. ET 8/24/21.

    Docket Numbers: RP21-1032-000.
    Applicants: DBM Pipeline, LLC.
    Description: Sec.  4(d) Rate Filing: Negotiated Rate Filing to be 
effective 8/1/2021.
    Filed Date: 8/12/21.
    Accession Number: 20210812-5084.
    Comment Date: 5 p.m. ET 8/24/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at:https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 12, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-17707 Filed 8-17-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.