Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 86, No. 155 / Monday, August 16, 2021 / Notices intervene and protests using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–3253–015. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted and is ready for environmental analysis. l. Project Description: The project consists of: (1) A 22-foot-wide, 24-foothigh concrete intake structure located approximately 60 feet upstream of the U.S. Forest Service’s Campton Dam on the east shoreline of the U.S. Forest Service’s Campton Pond, that includes a 25-foot-long,13-foot-high trashrack with 1.75-inch clear bar spacing; (2) a 600foot-long, 78-inch-diameter underground steel penstock that trifurcates into three 48-inch-diameter sections measuring 20 feet, 30 feet, and 43 feet in length, respectively; (3) a 43foot-long, 30-foot-wide powerhouse located on the east side of the Mad River that contains a 167-kW Francis turbinegenerator unit; (4) two 236-kW submersible Flygt turbine-generator units located outside of the powerhouse; (5) an approximately 55-foot-long, 40foot-wide tailrace; (6) a 200-foot-long transmission line and a 33.5-kilovolt transformer that connects the generators to the electric grid; (7) an Atlantic salmon smolt bypass facility consisting of an 85-foot-long, 20-inch diameter cast iron pipe that empties into an 3.5-footdeep plunge pool approximately 15 feet downstream of the dam; and (8) appurtenant facilities. The project creates an approximately 600-foot-long bypassed reach of the Mad River. VerDate Sep<11>2014 17:21 Aug 13, 2021 Jkt 253001 The current license requires: (1) Inflow to be discharged over the spillway to the bypassed reach during periods of non-generation or when inflow is less than 25 cfs; (2) a minimum flow of 4.5 cfs through the Atlantic salmon smolt bypass facility during periods of generation or when inflow is greater than 25 cfs; and (3) operation of the smolt bypass facility from mid-April to mid-June. The average annual generation of the project is currently approximately 1,170 megawatt-hours (MWh). MRPA proposes to: (1) Continue operating the project in a run-of-release mode; (2) replace one of the 236-kW Flygt turbine-generator units with a new 340-kW Flygt turbine-generator unit, for a total installed capacity of 743 kW at the project; (2) release a minimum flow of 29 cfs or inflow, whichever is less, over the dam to the bypassed reach; and (3) close the existing smolt bypass facility. MRPA estimates that the average annual generation of the proposed project will be approximately 1,900 MWh. m. A copy of the application is available for review via the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document (P–3253). For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 45721 otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. Dated: August 10, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–17515 Filed 8–13–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12711–018] Ocean Renewable Power Company Maine, LLC; Notice of Application for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for non-capacity amendment of license. b. Project No: P–12711–018. c. Date Filed: July 30, 2021. d. Applicant: Ocean Renewable Power Company Maine, LLC. e. Name of Project: Cobscook Bay Tidal Energy Project. f. Location: The tidal project is located in Cobscook Bay in Washington County, Maine. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Nathan Johnson, Vice President Development, Ocean Renewable Power Company Maine, LLC, 254 Commercial St., Suite 1198, Portland, ME 04101, njohnson@ orpc.co, phone (207) 772–7707. i. FERC Contact: Diana Shannon, (202) 502–6136, diana.shannon@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: September 9, 2021. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, E:\FR\FM\16AUN1.SGM 16AUN1 lotter on DSK11XQN23PROD with NOTICES1 45722 Federal Register / Vol. 86, No. 155 / Monday, August 16, 2021 / Notices please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–12711–018. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The pilot project license expires January 31, 2022. The license requires decommissioning and removal of most project features consistent with its project removal and site restoration plan approved by article 401 of the license. The applicant seeks approval to retain the bottom support frame in place to facilitate ongoing research in Cobscook Bay and to align its removal with its state land lease expiration date of December 31, 2025. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to VerDate Sep<11>2014 17:21 Aug 13, 2021 Jkt 253001 intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: August 10, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–17511 Filed 8–13–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13213–018] Lock 14 Hydro Partners, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Non-capacity amendment to the license. b. Project No.: 13213–018. c. Date Filed: July 29, 2021. d. Applicant: Lock 14 Hydro Partners, LLC. e. Name of Project: Heidelberg Hydroelectric Project. f. Location: This unconstructed project is located at the Kentucky River PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 Authority’s Lock and Dam No. 14 on the Kentucky River, near the Town of Heidelberg, in Lee County, Kentucky. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. David Brown Kinloch, Lock 14 Hydro Partners, LLC, 414 S. Wenzel Street, Louisville, KY 40204, (502) 589–0975. i. FERC Contact: Zeena Aljibury, (202) 502–6065, zeena.aljibury@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, or comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–13213–018. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Lock 14 Hydro Partners, LLC requests approval for an amendment to the license for the Heidelberg Hydroelectric Project. Lock 14 Hydro Partners, LLC is proposing to use 6 Voith StreamDivers (submersible turbine-generators) with a total generating capacity of 3.03 megawatts E:\FR\FM\16AUN1.SGM 16AUN1

Agencies

[Federal Register Volume 86, Number 155 (Monday, August 16, 2021)]
[Notices]
[Pages 45721-45722]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-17511]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12711-018]


Ocean Renewable Power Company Maine, LLC; Notice of Application 
for Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Application for non-capacity amendment of 
license.
    b. Project No: P-12711-018.
    c. Date Filed: July 30, 2021.
    d. Applicant: Ocean Renewable Power Company Maine, LLC.
    e. Name of Project: Cobscook Bay Tidal Energy Project.
    f. Location: The tidal project is located in Cobscook Bay in 
Washington County, Maine.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Nathan Johnson, Vice President Development, 
Ocean Renewable Power Company Maine, LLC, 254 Commercial St., Suite 
1198, Portland, ME 04101, [email protected], phone (207) 772-7707.
    i. FERC Contact: Diana Shannon, (202) 502-6136, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: September 9, 2021.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance,

[[Page 45722]]

please contact FERC Online Support at [email protected], (866) 
208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic 
filing, you may submit a paper copy. Submissions sent via the U.S. 
Postal Service must be addressed to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, 
Washington, DC 20426. Submissions sent via any other carrier must be 
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first 
page of any filing should include the docket number P-12711-018. 
Comments emailed to Commission staff are not considered part of the 
Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The pilot project license expires 
January 31, 2022. The license requires decommissioning and removal of 
most project features consistent with its project removal and site 
restoration plan approved by article 401 of the license. The applicant 
seeks approval to retain the bottom support frame in place to 
facilitate ongoing research in Cobscook Bay and to align its removal 
with its state land lease expiration date of December 31, 2025.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: August 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-17511 Filed 8-13-21; 8:45 am]