Ocean Renewable Power Company Maine, LLC; Notice of Application for Filing, Soliciting Comments, Motions To Intervene, and Protests, 45721-45722 [2021-17511]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 86, No. 155 / Monday, August 16, 2021 / Notices
intervene and protests using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–3253–015.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is ready for environmental analysis.
l. Project Description: The project
consists of: (1) A 22-foot-wide, 24-foothigh concrete intake structure located
approximately 60 feet upstream of the
U.S. Forest Service’s Campton Dam on
the east shoreline of the U.S. Forest
Service’s Campton Pond, that includes a
25-foot-long,13-foot-high trashrack with
1.75-inch clear bar spacing; (2) a 600foot-long, 78-inch-diameter
underground steel penstock that
trifurcates into three 48-inch-diameter
sections measuring 20 feet, 30 feet, and
43 feet in length, respectively; (3) a 43foot-long, 30-foot-wide powerhouse
located on the east side of the Mad River
that contains a 167-kW Francis turbinegenerator unit; (4) two 236-kW
submersible Flygt turbine-generator
units located outside of the powerhouse;
(5) an approximately 55-foot-long, 40foot-wide tailrace; (6) a 200-foot-long
transmission line and a 33.5-kilovolt
transformer that connects the generators
to the electric grid; (7) an Atlantic
salmon smolt bypass facility consisting
of an 85-foot-long, 20-inch diameter cast
iron pipe that empties into an 3.5-footdeep plunge pool approximately 15 feet
downstream of the dam; and (8)
appurtenant facilities. The project
creates an approximately 600-foot-long
bypassed reach of the Mad River.
VerDate Sep<11>2014
17:21 Aug 13, 2021
Jkt 253001
The current license requires: (1)
Inflow to be discharged over the
spillway to the bypassed reach during
periods of non-generation or when
inflow is less than 25 cfs; (2) a
minimum flow of 4.5 cfs through the
Atlantic salmon smolt bypass facility
during periods of generation or when
inflow is greater than 25 cfs; and (3)
operation of the smolt bypass facility
from mid-April to mid-June. The
average annual generation of the project
is currently approximately 1,170
megawatt-hours (MWh).
MRPA proposes to: (1) Continue
operating the project in a run-of-release
mode; (2) replace one of the 236-kW
Flygt turbine-generator units with a new
340-kW Flygt turbine-generator unit, for
a total installed capacity of 743 kW at
the project; (2) release a minimum flow
of 29 cfs or inflow, whichever is less,
over the dam to the bypassed reach; and
(3) close the existing smolt bypass
facility. MRPA estimates that the
average annual generation of the
proposed project will be approximately
1,900 MWh.
m. A copy of the application is
available for review via the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document (P–3253).
For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
45721
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application.
Dated: August 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–17515 Filed 8–13–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12711–018]
Ocean Renewable Power Company
Maine, LLC; Notice of Application for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Application for
non-capacity amendment of license.
b. Project No: P–12711–018.
c. Date Filed: July 30, 2021.
d. Applicant: Ocean Renewable Power
Company Maine, LLC.
e. Name of Project: Cobscook Bay
Tidal Energy Project.
f. Location: The tidal project is
located in Cobscook Bay in Washington
County, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Nathan
Johnson, Vice President Development,
Ocean Renewable Power Company
Maine, LLC, 254 Commercial St., Suite
1198, Portland, ME 04101, njohnson@
orpc.co, phone (207) 772–7707.
i. FERC Contact: Diana Shannon,
(202) 502–6136, diana.shannon@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 9, 2021.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
E:\FR\FM\16AUN1.SGM
16AUN1
lotter on DSK11XQN23PROD with NOTICES1
45722
Federal Register / Vol. 86, No. 155 / Monday, August 16, 2021 / Notices
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–12711–018.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The pilot
project license expires January 31, 2022.
The license requires decommissioning
and removal of most project features
consistent with its project removal and
site restoration plan approved by article
401 of the license. The applicant seeks
approval to retain the bottom support
frame in place to facilitate ongoing
research in Cobscook Bay and to align
its removal with its state land lease
expiration date of December 31, 2025.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
VerDate Sep<11>2014
17:21 Aug 13, 2021
Jkt 253001
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: August 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–17511 Filed 8–13–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13213–018]
Lock 14 Hydro Partners, LLC; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Non-capacity
amendment to the license.
b. Project No.: 13213–018.
c. Date Filed: July 29, 2021.
d. Applicant: Lock 14 Hydro Partners,
LLC.
e. Name of Project: Heidelberg
Hydroelectric Project.
f. Location: This unconstructed
project is located at the Kentucky River
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Authority’s Lock and Dam No. 14 on the
Kentucky River, near the Town of
Heidelberg, in Lee County, Kentucky.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. David
Brown Kinloch, Lock 14 Hydro Partners,
LLC, 414 S. Wenzel Street, Louisville,
KY 40204, (502) 589–0975.
i. FERC Contact: Zeena Aljibury, (202)
502–6065, zeena.aljibury@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, or comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–13213–018.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Lock 14
Hydro Partners, LLC requests approval
for an amendment to the license for the
Heidelberg Hydroelectric Project. Lock
14 Hydro Partners, LLC is proposing to
use 6 Voith StreamDivers (submersible
turbine-generators) with a total
generating capacity of 3.03 megawatts
E:\FR\FM\16AUN1.SGM
16AUN1
Agencies
[Federal Register Volume 86, Number 155 (Monday, August 16, 2021)]
[Notices]
[Pages 45721-45722]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-17511]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12711-018]
Ocean Renewable Power Company Maine, LLC; Notice of Application
for Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for non-capacity amendment of
license.
b. Project No: P-12711-018.
c. Date Filed: July 30, 2021.
d. Applicant: Ocean Renewable Power Company Maine, LLC.
e. Name of Project: Cobscook Bay Tidal Energy Project.
f. Location: The tidal project is located in Cobscook Bay in
Washington County, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Nathan Johnson, Vice President Development,
Ocean Renewable Power Company Maine, LLC, 254 Commercial St., Suite
1198, Portland, ME 04101, [email protected], phone (207) 772-7707.
i. FERC Contact: Diana Shannon, (202) 502-6136,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: September 9, 2021.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance,
[[Page 45722]]
please contact FERC Online Support at [email protected], (866)
208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, you may submit a paper copy. Submissions sent via the U.S.
Postal Service must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426. Submissions sent via any other carrier must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first
page of any filing should include the docket number P-12711-018.
Comments emailed to Commission staff are not considered part of the
Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The pilot project license expires
January 31, 2022. The license requires decommissioning and removal of
most project features consistent with its project removal and site
restoration plan approved by article 401 of the license. The applicant
seeks approval to retain the bottom support frame in place to
facilitate ongoing research in Cobscook Bay and to align its removal
with its state land lease expiration date of December 31, 2025.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: August 10, 2021.
Kimberly D. Bose,
Secretary.