Download as PDF 44355 Federal Register / Vol. 86, No. 153 / Thursday, August 12, 2021 / Notices Comments Due: 5 p.m. ET 8/27/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 6, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–17209 Filed 8–11–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3133–033] lotter on DSK11XQN23PROD with NOTICES1 Brookfield White Pine Hydro, LLC; Errol Hydro Co., LLC; Notice of Application Tendered for Filing With The Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 3133–033. c. Date Filed: July 30, 2021. d. Applicant: Brookfield White Pine Hydro, LLC and Errol Hydroelectric Co., LLC (licensees). e. Name of Project: Errol Hydroelectric Project (Errol Project). f. Location: The Errol Project is located on the Androscoggin River and Umbagog Lake, near the Town of Errol, and Township of Cambridge, NH, in Coos Wing County, New Hampshire and the Towns of Magalloway Plantation and Upton in Oxford County, Maine. The project occupies 3,285 acres federal land in the Umbagog National Wildlife Refuge administered by the U.S. Fish and Wildlife Service. VerDate Sep<11>2014 20:11 Aug 11, 2021 Jkt 253001 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. Tom Uncher, Vice President, Brookfield White Pine Hydro, LLC, Errol Hydroelectric Co., LLC, 339B Big Bay Rd., Queensbury, NY 12804 Phone at: (518) 743–2018 Thomas.Uncher@ brookfieldrenewable.com. i. FERC Contact: Kelly Wolcott at (202) 502–6480 or email at kelly.wolcott@ferc.gov. j. This application is not ready for environmental analysis at this time. k. The Errol Project consists of: (1) An existing dam consisting of a 25-foothigh, 202.5- foot-long gated section separated by rock-filled timber or concrete crib piers supporting five sluice gates and seven deep gates, and an earthen dike with a sheet steel cutoff wall on the upstream side, extending approximately 50 feet from the end of the gated section of the dam to the northwestern wall of the powerhouse and then extending another approximately 70 feet from the southeastern powerhouse wall to the eastern embankment; (2) an approximately 9,098-acre project impoundment with a storage capacity of 89,568 acre-feet at a normal pond elevation of 1,247 feet, which includes an approximately 3-mile-long reach of the Androscoggin River above Errol Dam, Umbagog Lake, and approximately 4.3 miles of the Magalloway River; (3) a reinforced concrete powerhouse containing one horizontal double regulated bulb turbine-generator unit with a hydraulic capacity of 2,600 cubic feet per second and an authorized installed generating capacity of 2,031 kilowatts (kW); (4) an approximately 80foot-long tailrace; (5) a 3,333-kilovoltampere substation power transformer; and (6) appurtenant facilities. The Errol Project is operated in accordance with the current license, and three water agreements that dictate operational flows in the watershed for other hydropower developments and for waterfowl nesting, with an estimated annual energy production of approximately 15,944 megawatt hours. The licensees propose to operate the project allowing for seasonal flows necessary for waterfowl nesting in Umbagog Lake and spring runoff and does not propose any new construction to the project. A license amendment was issued for the project in 2016 (156 FERC ¶ 62,045 (2016)), which approved the installation of a sixth turbine generator unit, which would increase the total installed capacity to 3,542.5 kW; however, the additional generator unit has not yet been installed. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 l. A copy of the application can be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19) issued on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural schedule: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Milestone Issue Deficiency Letter (if necessary). Request Additional Information. Notice of Acceptance December. Notice of Ready for Environmental Analysis TBD. Target date September 2021. September 2021. 2021. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: August 6, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–17240 Filed 8–11–21; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8819–01–R6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for BP Amoco Chemical Company, Texas City Chemical Plant, Galveston County, Texas Environmental Protection Agency (EPA). AGENCY: E:\FR\FM\12AUN1.SGM 12AUN1

Agencies

[Federal Register Volume 86, Number 153 (Thursday, August 12, 2021)]
[Notices]
[Page 44355]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-17240]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3133-033]


Brookfield White Pine Hydro, LLC; Errol Hydro Co., LLC; Notice of 
Application Tendered for Filing With The Commission and Establishing 
Procedural Schedule for Licensing and Deadline for Submission of Final 
Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 3133-033.
    c. Date Filed: July 30, 2021.
    d. Applicant: Brookfield White Pine Hydro, LLC and Errol 
Hydroelectric Co., LLC (licensees).
    e. Name of Project: Errol Hydroelectric Project (Errol Project).
    f. Location: The Errol Project is located on the Androscoggin River 
and Umbagog Lake, near the Town of Errol, and Township of Cambridge, 
NH, in Coos Wing County, New Hampshire and the Towns of Magalloway 
Plantation and Upton in Oxford County, Maine. The project occupies 
3,285 acres federal land in the Umbagog National Wildlife Refuge 
administered by the U.S. Fish and Wildlife Service.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Mr. Tom Uncher, Vice President, Brookfield 
White Pine Hydro, LLC, Errol Hydroelectric Co., LLC, 339B Big Bay Rd., 
Queensbury, NY 12804 Phone at: (518) 743-2018 
[email protected].
    i. FERC Contact: Kelly Wolcott at (202) 502-6480 or email at 
[email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. The Errol Project consists of: (1) An existing dam consisting of 
a 25-foot-high, 202.5- foot-long gated section separated by rock-filled 
timber or concrete crib piers supporting five sluice gates and seven 
deep gates, and an earthen dike with a sheet steel cut-off wall on the 
upstream side, extending approximately 50 feet from the end of the 
gated section of the dam to the northwestern wall of the powerhouse and 
then extending another approximately 70 feet from the southeastern 
powerhouse wall to the eastern embankment; (2) an approximately 9,098-
acre project impoundment with a storage capacity of 89,568 acre-feet at 
a normal pond elevation of 1,247 feet, which includes an approximately 
3-mile-long reach of the Androscoggin River above Errol Dam, Umbagog 
Lake, and approximately 4.3 miles of the Magalloway River; (3) a 
reinforced concrete powerhouse containing one horizontal double 
regulated bulb turbine-generator unit with a hydraulic capacity of 
2,600 cubic feet per second and an authorized installed generating 
capacity of 2,031 kilowatts (kW); (4) an approximately 80-foot-long 
tailrace; (5) a 3,333-kilovolt-ampere substation power transformer; and 
(6) appurtenant facilities.
    The Errol Project is operated in accordance with the current 
license, and three water agreements that dictate operational flows in 
the watershed for other hydropower developments and for waterfowl 
nesting, with an estimated annual energy production of approximately 
15,944 megawatt hours. The licensees propose to operate the project 
allowing for seasonal flows necessary for waterfowl nesting in Umbagog 
Lake and spring runoff and does not propose any new construction to the 
project. A license amendment was issued for the project in 2016 (156 
FERC ] 62,045 (2016)), which approved the installation of a sixth 
turbine generator unit, which would increase the total installed 
capacity to 3,542.5 kW; however, the additional generator unit has not 
yet been installed.
    l. A copy of the application can be viewed on the Commission's 
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. At this time, the Commission has 
suspended access to the Commission's Public Reference Room due to the 
proclamation declaring a National Emergency concerning the Novel 
Coronavirus Disease (COVID-19) issued on March 13, 2020. For 
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or (202) 502-8659 (TTY).
    m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural schedule: The application will be processed according 
to the following preliminary schedule. Revisions to the schedule will 
be made as appropriate.

------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary)  September 2021.
Request Additional Information........  September 2021.
Notice of Acceptance December.........  2021.
Notice of Ready for Environmental
 Analysis TBD.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: August 6, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-17240 Filed 8-11-21; 8:45 am]
BILLING CODE 6717-01-P