Combined Notice of Filings #1, 44354-44355 [2021-17209]

Download as PDF 44354 Federal Register / Vol. 86, No. 153 / Thursday, August 12, 2021 / Notices Bulk-Power System. The conference will be held virtually via WebEx. The final agenda for this event is attached. The conference will be open for the public to attend virtually, and there is no fee for attendance. A second supplemental notice will be issued prior to the conference with the confirmed speakers. Information on the technical conference will also be posted on the Calendar of Events on the Commission’s website, https://www.ferc.gov, prior to the event. The conference will be transcribed. Transcripts of the conference will be available for a fee from Ace-Federal Reporters, Inc. (202– 347–3700). Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov, call toll-free (866) 208–3372 (voice) or (202) 208–8659 (TTY), or send a fax to (202) 208–2106 with the required accommodations. For more information about this technical conference, please contact Lodie White at Lodie.White@ferc.gov or (202) 502–8453. For information related to logistics, please contact Sarah McKinley at Sarah.Mckinley@ferc.gov or (202) 502–8368. Dated: August 6, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–17241 Filed 8–11–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission lotter on DSK11XQN23PROD with NOTICES1 Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–111–000. Applicants: Broad River Solar, LLC, Stony Knoll Solar, LLC, Speedway Solar NC, LLC, CPRE 1 Lessee, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of Broad River Solar, LLC. Filed Date: 8/5/21. Accession Number: 20210805–5156. Comments Due: 5 p.m. ET 8/26/21. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–208–000. Applicants: Arlington Solar, LLC. Description: Notice of SelfCertification of Exempt Wholesale VerDate Sep<11>2014 20:11 Aug 11, 2021 Jkt 253001 Generator Status of Arlington Solar, LLC. Filed Date: 7/26/21. Accession Number: 20210726–5240. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: EG21–209–000. Applicants: American Electric Power Service Corporation. Description: Self-Certification of Exempt Wholesale Generator Status of Martinsville OnSite Generation, LLC. Filed Date: 7/29/21. Accession Number: 20210729–5151. Comments Due: 5 p.m. ET 8/19/21. Docket Numbers: EG21–210–000. Applicants: American Electric Power Service Corporation. Description: Self-Certification of Exempt Wholesale Generator of South River OnSite Generation, LLC. Filed Date: 7/29/21. Accession Number: 20210729–5153. Comments Due: 5 p.m. ET 8/19/21. Docket Numbers: EG21–211–000. Applicants: Ford County Wind Farm LLC. Description: Notice of SelCertification of Exempt Wholesale Generator Status of Ford County Wind Farm LLC. Filed Date: 8/6/21. Accession Number: 20210806–5174. Comments Due: 5 p.m. ET 8/27/21. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER19–106–004; ER14–2498–011; ER14–2500–011. ER16–2462–011; ER17–2364–005; ER21–445–001. Applicants: Birdsboro Power LLC, St. Joseph Energy Center, LLC, Oregon Clean Energy, LLC, Newark Energy Center, LLC, EIF Newark, LLC, Hill Top Energy Center LLC. Description: Notice of Non-Material Change in Status of Birdsboro Power LLC. Filed Date: 8/5/21. Accession Number: 20210805–5155. Comments Due: 5 p.m. ET 8/26/21. Docket Numbers: ER21–1805–002. Applicants: Upper Missouri G. & T. Electric Cooperative. Description: Tariff Amendment: Supplement to Response to Deficiency Letter (Revised Rate Schedules 1,2,3,5,11) to be effective 6/30/2021. Filed Date: 8/6/21. Accession Number: 20210806–5193. Comments Due: 5 p.m. ET 8/27/21. Docket Numbers: ER20–1829–001. Applicants: Trans-Allegheny Interstate Line Company, PJM Interconnection, L.L.C. Description: Compliance filing: TrAILCo submits Response to 7/12 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Deficiency Letter in ER20–1829 to be effective N/A. Filed Date: 8/6/21. Accession Number: 20210806–5023. Comments Due: 5 p.m. ET 8/27/21. Docket Numbers: ER21–1875–001. Applicants: Arizona Public Service Company. Description: Tariff Amendment: Response to Deficiency Letter to be effective 7/10/2021. Filed Date: 8/6/21. Accession Number: 20210806–5001. Comments Due: 5 p.m. ET 8/27/21. Docket Numbers: ER21–2619–000. Applicants: Southwest Power Pool, Inc. Description: Compliance filing: 3293R2 Thunderhead Wind Energy GIA & Settlement Agreement to be effective 8/4/2021. Filed Date: 8/6/21. Accession Number: 20210806–5051. Comments Due: 5 p.m. ET 8/27/21 Docket Numbers: ER21–2620–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2021–08–06_Hybrid Resource Accreditation to be effective 10/6/2021. Filed Date: 8/6/21. Accession Number: 20210806–5068. Comments Due: 5 p.m. ET 8/27/21. Docket Numbers: ER21–2621–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: OATT Revisions re External Resources as NWE EIM Participating Resource to be effective 10/6/2021. Filed Date: 8/6/21. Accession Number: 20210806–5093. Comments Due: 5 p.m. ET 8/27/21. Docket Numbers: ER21–2622–000. Applicants: RE Garland LLC. Description: § 205(d) Rate Filing: Garland Storage Shared Facilities Agreement Amendment Filing to be effective 7/20/2021. Filed Date: 8/6/21. Accession Number: 20210806–5120. Comments Due: 5 p.m. ET 8/27/21. Docket Numbers: ER21–2623–000. Applicants: Puget Sound Energy, Inc. Description: Tariff Cancellation: Cancellation of MSCG Agreements to be effective 10/6/2021. Filed Date: 8/6/21. Accession Number: 20210806–5143. Comments Due: 5 p.m. ET 8/27/21. Docket Numbers: ER21–2624–000. Applicants: Puget Sound Energy, Inc. Description: § 205(d) Rate Filing: MSCG Transmission Service Agreement to be effective 8/6/2021. Filed Date: 8/6/21. Accession Number: 20210806–5144. E:\FR\FM\12AUN1.SGM 12AUN1 44355 Federal Register / Vol. 86, No. 153 / Thursday, August 12, 2021 / Notices Comments Due: 5 p.m. ET 8/27/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 6, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–17209 Filed 8–11–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3133–033] lotter on DSK11XQN23PROD with NOTICES1 Brookfield White Pine Hydro, LLC; Errol Hydro Co., LLC; Notice of Application Tendered for Filing With The Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 3133–033. c. Date Filed: July 30, 2021. d. Applicant: Brookfield White Pine Hydro, LLC and Errol Hydroelectric Co., LLC (licensees). e. Name of Project: Errol Hydroelectric Project (Errol Project). f. Location: The Errol Project is located on the Androscoggin River and Umbagog Lake, near the Town of Errol, and Township of Cambridge, NH, in Coos Wing County, New Hampshire and the Towns of Magalloway Plantation and Upton in Oxford County, Maine. The project occupies 3,285 acres federal land in the Umbagog National Wildlife Refuge administered by the U.S. Fish and Wildlife Service. VerDate Sep<11>2014 20:11 Aug 11, 2021 Jkt 253001 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. Tom Uncher, Vice President, Brookfield White Pine Hydro, LLC, Errol Hydroelectric Co., LLC, 339B Big Bay Rd., Queensbury, NY 12804 Phone at: (518) 743–2018 Thomas.Uncher@ brookfieldrenewable.com. i. FERC Contact: Kelly Wolcott at (202) 502–6480 or email at kelly.wolcott@ferc.gov. j. This application is not ready for environmental analysis at this time. k. The Errol Project consists of: (1) An existing dam consisting of a 25-foothigh, 202.5- foot-long gated section separated by rock-filled timber or concrete crib piers supporting five sluice gates and seven deep gates, and an earthen dike with a sheet steel cutoff wall on the upstream side, extending approximately 50 feet from the end of the gated section of the dam to the northwestern wall of the powerhouse and then extending another approximately 70 feet from the southeastern powerhouse wall to the eastern embankment; (2) an approximately 9,098-acre project impoundment with a storage capacity of 89,568 acre-feet at a normal pond elevation of 1,247 feet, which includes an approximately 3-mile-long reach of the Androscoggin River above Errol Dam, Umbagog Lake, and approximately 4.3 miles of the Magalloway River; (3) a reinforced concrete powerhouse containing one horizontal double regulated bulb turbine-generator unit with a hydraulic capacity of 2,600 cubic feet per second and an authorized installed generating capacity of 2,031 kilowatts (kW); (4) an approximately 80foot-long tailrace; (5) a 3,333-kilovoltampere substation power transformer; and (6) appurtenant facilities. The Errol Project is operated in accordance with the current license, and three water agreements that dictate operational flows in the watershed for other hydropower developments and for waterfowl nesting, with an estimated annual energy production of approximately 15,944 megawatt hours. The licensees propose to operate the project allowing for seasonal flows necessary for waterfowl nesting in Umbagog Lake and spring runoff and does not propose any new construction to the project. A license amendment was issued for the project in 2016 (156 FERC ¶ 62,045 (2016)), which approved the installation of a sixth turbine generator unit, which would increase the total installed capacity to 3,542.5 kW; however, the additional generator unit has not yet been installed. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 l. A copy of the application can be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19) issued on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural schedule: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Milestone Issue Deficiency Letter (if necessary). Request Additional Information. Notice of Acceptance December. Notice of Ready for Environmental Analysis TBD. Target date September 2021. September 2021. 2021. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: August 6, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–17240 Filed 8–11–21; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8819–01–R6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for BP Amoco Chemical Company, Texas City Chemical Plant, Galveston County, Texas Environmental Protection Agency (EPA). AGENCY: E:\FR\FM\12AUN1.SGM 12AUN1

Agencies

[Federal Register Volume 86, Number 153 (Thursday, August 12, 2021)]
[Notices]
[Pages 44354-44355]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-17209]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC21-111-000.
    Applicants: Broad River Solar, LLC, Stony Knoll Solar, LLC, 
Speedway Solar NC, LLC, CPRE 1 Lessee, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Broad River Solar, LLC.
    Filed Date: 8/5/21.
    Accession Number: 20210805-5156.
    Comments Due: 5 p.m. ET 8/26/21.

    Take notice that the Commission received the following exempt 
wholesale generator filings:
    Docket Numbers: EG21-208-000.
    Applicants: Arlington Solar, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Arlington Solar, LLC.
    Filed Date: 7/26/21.
    Accession Number: 20210726-5240.
    Comments Due: 5 p.m. ET 8/16/21.

    Docket Numbers: EG21-209-000.
    Applicants: American Electric Power Service Corporation.
    Description: Self-Certification of Exempt Wholesale Generator 
Status of Martinsville OnSite Generation, LLC.
    Filed Date: 7/29/21.
    Accession Number: 20210729-5151.
    Comments Due: 5 p.m. ET 8/19/21.

    Docket Numbers: EG21-210-000.
    Applicants: American Electric Power Service Corporation.
    Description: Self-Certification of Exempt Wholesale Generator of 
South River OnSite Generation, LLC.
    Filed Date: 7/29/21.
    Accession Number: 20210729-5153.
    Comments Due: 5 p.m. ET 8/19/21.

    Docket Numbers: EG21-211-000.
    Applicants: Ford County Wind Farm LLC.
    Description: Notice of Sel- Certification of Exempt Wholesale 
Generator Status of Ford County Wind Farm LLC.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5174.
    Comments Due: 5 p.m. ET 8/27/21.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER19-106-004; ER14-2498-011; ER14-2500-011.
    ER16-2462-011; ER17-2364-005; ER21-445-001.
    Applicants: Birdsboro Power LLC, St. Joseph Energy Center, LLC, 
Oregon Clean Energy, LLC, Newark Energy Center, LLC, EIF Newark, LLC, 
Hill Top Energy Center LLC.
    Description: Notice of Non-Material Change in Status of Birdsboro 
Power LLC.
    Filed Date: 8/5/21.
    Accession Number: 20210805-5155.
    Comments Due: 5 p.m. ET 8/26/21.

    Docket Numbers: ER21-1805-002.
    Applicants: Upper Missouri G. & T. Electric Cooperative.
    Description: Tariff Amendment: Supplement to Response to Deficiency 
Letter (Revised Rate Schedules 1,2,3,5,11) to be effective 6/30/2021.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5193.
    Comments Due: 5 p.m. ET 8/27/21.

    Docket Numbers: ER20-1829-001.
    Applicants: Trans-Allegheny Interstate Line Company, PJM 
Interconnection, L.L.C.
    Description: Compliance filing: TrAILCo submits Response to 7/12 
Deficiency Letter in ER20-1829 to be effective N/A.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5023.
    Comments Due: 5 p.m. ET 8/27/21.

    Docket Numbers: ER21-1875-001.
    Applicants: Arizona Public Service Company.
    Description: Tariff Amendment: Response to Deficiency Letter to be 
effective 7/10/2021.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5001.
    Comments Due: 5 p.m. ET 8/27/21.

    Docket Numbers: ER21-2619-000.
    Applicants: Southwest Power Pool, Inc.
    Description: Compliance filing: 3293R2 Thunderhead Wind Energy GIA 
& Settlement Agreement to be effective 8/4/2021.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5051.
    Comments Due: 5 p.m. ET 8/27/21
    Docket Numbers: ER21-2620-000.

    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2021-08-06_Hybrid Resource 
Accreditation to be effective 10/6/2021.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5068.
    Comments Due: 5 p.m. ET 8/27/21.

    Docket Numbers: ER21-2621-000.
    Applicants: NorthWestern Corporation.
    Description: Sec.  205(d) Rate Filing: OATT Revisions re External 
Resources as NWE EIM Participating Resource to be effective 10/6/2021.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5093.
    Comments Due: 5 p.m. ET 8/27/21.

    Docket Numbers: ER21-2622-000.
    Applicants: RE Garland LLC.
    Description: Sec.  205(d) Rate Filing: Garland Storage Shared 
Facilities Agreement Amendment Filing to be effective 7/20/2021.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5120.
    Comments Due: 5 p.m. ET 8/27/21.

    Docket Numbers: ER21-2623-000.
    Applicants: Puget Sound Energy, Inc.
    Description: Tariff Cancellation: Cancellation of MSCG Agreements 
to be effective 10/6/2021.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5143.
    Comments Due: 5 p.m. ET 8/27/21.

    Docket Numbers: ER21-2624-000.
    Applicants: Puget Sound Energy, Inc.
    Description: Sec.  205(d) Rate Filing: MSCG Transmission Service 
Agreement to be effective 8/6/2021.
    Filed Date: 8/6/21.
    Accession Number: 20210806-5144.

[[Page 44355]]

    Comments Due: 5 p.m. ET 8/27/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: August 6, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-17209 Filed 8-11-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.