Blackstone Hydro Associates; Notice of Authorization for Continued Project Operation, 43651-43652 [2021-16990]
Download as PDF
43651
Federal Register / Vol. 86, No. 151 / Tuesday, August 10, 2021 / Notices
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: August 4, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–17029 Filed 8–9–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EF21–3–000]
Dated: August 4, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
jbell on DSKJLSW7X2PROD with NOTICES
Bonneville Power Administration;
Notice of Filing
Take notice that on August 2, 2021,
Bonneville Power Administration
submitted tariff filing: BP–22 Rate Filing
Part 4—Proposed FY 2022–2023
Wholesale Power and Transmission
Rate Adjustment.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
VerDate Sep<11>2014
17:05 Aug 09, 2021
Jkt 253001
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on September 1, 2021.
Milestone
Target
date
Commission issues draft EA
October
2021.1
November
2021.
January 2022.
Comments on EA ..................
Modified 4(e) and Fishway
Prescriptions.
Issue final EA ........................
April 2022.
Any questions regarding this notice
may be directed to David Turner at (202)
502–6091 or David.Turner@ferc.gov.
Dated: August 4, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–16993 Filed 8–9–21; 8:45 am]
[FR Doc. 2021–17027 Filed 8–9–21; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 3063–000]
[Project No. 2530–057]
Brookfield White Pine Hydro LLC;
Notice of Intent To Prepare an
Environmental Assessment
On November 20, 2020, Brookfield
White Pine Hydro LLC (White Pine
Hydro) filed an application for a new
license for the 10.9-megawatt Hiram
Hydroelectric Project (Hiram Project)
(FERC No. 2530). The Hiram Project is
located on the Saco River near the
towns of Hiram, Baldwin, Denmark, and
Brownfield in Oxford and Cumberland
Counties, Maine. The project does not
occupy federal land.
In accordance with the Commission’s
regulations, on January 11, 2021,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA notice). Based on the
information in the record, including
comments filed on the REA notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to license the Hiram Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Blackstone Hydro Associates; Notice
of Authorization for Continued Project
Operation
On July 31, 2019, Blackstone Hydro
Associates, licensee for the Central Falls
Hydroelectric Project No. 3063, filed an
Application for a Subsequent License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Central Falls
Hydroelectric Project is located on the
Blackstone River, in the City of Central
Falls, Providence County, Rhode Island.
The license for Project No. 3063 was
issued for a period ending July 31, 2021.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare an EA for the Normanskill Project.
Therefore, in accordance with CEQ’s regulations,
the EA must be issued within 1 year of the issuance
date of this notice.
E:\FR\FM\10AUN1.SGM
10AUN1
43652
Federal Register / Vol. 86, No. 151 / Tuesday, August 10, 2021 / Notices
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 3063
is issued to Blackstone Hydro
Associates for a period effective August
1, 2021 through July 31, 2022 or until
the issuance of a new license for the
project or other disposition under the
FPA, whichever comes first. If issuance
of a new license (or other disposition)
does not take place on or before July 31,
2022, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Blackstone Hydro Associates is
authorized to continue operation of the
Central Falls Hydroelectric Project, until
such time as the Commission acts on its
application for a subsequent license.
Dated: August 4, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–16990 Filed 8–9–21; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8848–01–OW]
Notice of Public Webinar Briefing
Environmental Protection
Agency (EPA).
ACTION: Notice of public webinar
briefing.
AGENCY:
The Environmental Protection
Agency (EPA)’s Environmental
Financial Advisory Board (EFAB) will
hold a public webinar briefing on
August 26, 2021. The purpose of the
webinar will be for an Opportunity
Zones Practitioner Panel for the EFAB
Opportunity Zones Workgroup. Due to
interest from the full Board, this
webinar is being opened to the public.
DATES: The webinar will be held on
August 26, 2021 from 12 p.m. to 1:30
p.m. (Eastern Time).
jbell on DSKJLSW7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:05 Aug 09, 2021
Jkt 253001
The webinar briefing will be
conducted via webinar only and is open
to the public. Interested persons must
register in advance at the weblink below
to access the meeting.
FOR FURTHER INFORMATION CONTACT: Any
member of the public who wants
information about the meeting may
contact Ed Chu, the Designated Federal
Officer, via telephone/voice mail at
(913) 551–7333 or email to efab@
epa.gov. General information
concerning the EFAB is available at
https://www.epa.gov/
waterfinancecenter/efab.
SUPPLEMENTARY INFORMATION:
Background: The EFAB is an EPA
advisory committee chartered under the
Federal Advisory Committee Act
(FACA), 5 U.S.C. app. 2, to provide
advice and recommendations to EPA on
innovative approaches to funding
environmental programs, projects, and
activities. Administrative support for
the EFAB is provided by the Water
Infrastructure and Resiliency Finance
Center within EPA’s Office of Water.
Pursuant to FACA and EPA policy,
notice is hereby given that the EFAB
will hold a public webinar briefing for
the following purpose:
(1) The purpose of the webinar will be
for members of the EFAB to hear from
Opportunity Zones practitioners who
work on Opportunity Zones investments
in disadvantaged communities and are
willing to share their experiences to
support the workgroup’s charge. The
webinar is open to the public, but no
oral public comments will be accepted
during the briefing. Written public
comments relating to the Opportunity
Zones Workgroup should be provided in
accordance with the instructions below
on written statements.
Registration for the Meeting: Register
for the meeting at https://
www.eventbrite.com/e/us-epaenvironmental-financial-advisoryboard-opportunity-zones-panel-tickets164877317495.
Availability of Meeting Materials:
Meeting materials (including the
meeting agenda and briefing materials)
will be available on EPA’s website at
https://www.epa.gov/
waterfinancecenter/efab.
Procedures for Providing Public Input:
Public comment for consideration by
EPA’s federal advisory committees has a
different purpose from public comment
provided to EPA program offices.
Therefore, the process for submitting
comments to a federal advisory
committee is different from the process
used to submit comments to an EPA
program office. Federal advisory
committees provide independent advice
ADDRESSES:
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
to EPA. Members of the public can
submit comments on matters being
considered by the EFAB for
consideration by members as they
develop their advice and
recommendations to EPA.
Written Statements: Written
statements for the webinar should be
received by August 20, 2021 so that the
information can be made available to
the EFAB for its consideration. Written
statements should be sent via email to
efab@epa.gov. Members of the public
should be aware that their personal
contact information, if included in any
written comments, may be posted to the
EFAB website. Copyrighted material
will not be posted without explicit
permission of the copyright holder.
Accessibility: For information on
access or services for individuals with
disabilities or to request
accommodations for a disability, please
register for the webinar and list any
special requirements or
accommodations needed on the
registration form at least 10 business
days prior to the meeting to allow as
much time as possible to process your
request.
Dated: August 5, 2021.
Andrew D. Sawyers,
Director, Office of Wastewater Management,
Office of Water.
[FR Doc. 2021–17030 Filed 8–9–21; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL DEPOSIT INSURANCE
CORPORATION
[OMB No. 3064–0183; –0195; –0200]
Agency Information Collection
Activities: Proposed Information
Collection Renewal; Comment Request
Federal Deposit Insurance
Corporation (FDIC).
ACTION: Notice and request for comment.
AGENCY:
The FDIC, as part of its
obligations under the Paperwork
Reduction Act of 1995 (PRA), invites the
general public and other Federal
agencies to take this opportunity to
comment on the renewal of the existing
information collections described below
(OMB Control No. 3064–0183; –0195;
and –0200).
DATES: Comments must be submitted on
or before October 12, 2021.
ADDRESSES: Interested parties are
invited to submit written comments to
the FDIC by any of the following
methods:
• Agency website: https://
www.fdic.gov/resources/regulations/
federal-register-publications/.
SUMMARY:
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 86, Number 151 (Tuesday, August 10, 2021)]
[Notices]
[Pages 43651-43652]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-16990]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3063-000]
Blackstone Hydro Associates; Notice of Authorization for
Continued Project Operation
On July 31, 2019, Blackstone Hydro Associates, licensee for the
Central Falls Hydroelectric Project No. 3063, filed an Application for
a Subsequent License pursuant to the Federal Power Act (FPA) and the
Commission's regulations thereunder. The Central Falls Hydroelectric
Project is located on the Blackstone River, in the City of Central
Falls, Providence County, Rhode Island.
The license for Project No. 3063 was issued for a period ending
July 31, 2021. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee(s) under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the
[[Page 43652]]
project in accordance with the terms and conditions of the license
after the minor or minor part license expires, until the Commission
acts on its application. If the licensee of such a project has not
filed an application for a subsequent license, then it may be required,
pursuant to 18 CFR 16.21(b), to continue project operations until the
Commission issues someone else a license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 3063 is issued to
Blackstone Hydro Associates for a period effective August 1, 2021
through July 31, 2022 or until the issuance of a new license for the
project or other disposition under the FPA, whichever comes first. If
issuance of a new license (or other disposition) does not take place on
or before July 31, 2022, notice is hereby given that, pursuant to 18
CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that Blackstone Hydro Associates is authorized to continue
operation of the Central Falls Hydroelectric Project, until such time
as the Commission acts on its application for a subsequent license.
Dated: August 4, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-16990 Filed 8-9-21; 8:45 am]
BILLING CODE 6717-01-P