Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility, 43276-43277 [2021-16595]
Download as PDF
43276
Federal Register / Vol. 86, No. 149 / Friday, August 6, 2021 / Notices
the National Science Foundation Act, as
amended (42 U.S.C. 1862n–5), and the
Government in the Sunshine Act (5
U.S.C. 552b). All open sessions of the
meeting will be webcast live on the NSB
YouTube channel. Please feel free to
share these links with your colleagues:
Tuesday, August 3—https://
www.youtube.com/
watch?v=BtZZe7TMYqY
Wednesday, August 4—https://
www.youtube.com/watch?v=qsskuQSSuE
Please refer to the NSB website for
additional information. You will find
any updated meeting information and
schedule updates (time, place, subject
matter, or status of meeting) at https://
www.nsf.gov/nsb/meetings/notices.jsp.
Members of the public are advised
that the NSB provides some flexibility
around its meeting times. A meeting
may be allowed to run over by as much
as 15 minutes if the Chair decides the
extra time is warranted. The next
meeting will start no later than 15
minutes after the noticed start time. If a
meeting ends early, the next meeting
may start up to 15 minutes earlier than
the noticed start time. NSB and
committee meetings will not vary from
noticed times by more than 15 minutes.
Open meetings can also be watched in
their entirety later through the YouTube
link.
Chris Blair,
Executive Assistant to the National Science
Board Office.
[FR Doc. 2021–16896 Filed 8–4–21; 11:15 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2021–0001]
Sunshine Act Meetings
Weeks of August 9, 16,
23, 30, September 6, 13, 2021.
PLACE: Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
STATUS: Closed.
MATTERS TO BE CONSIDERED:
TIME AND DATE:
jbell on DSKJLSW7X2PROD with NOTICES
There are no meetings scheduled for
the week of August 9, 2021.
Week of August 16, 2021—Tentative
There are no meetings scheduled for
the week of August 16, 2021.
Week of August 23, 2021—Tentative
There are no meetings scheduled for
the week of August 23, 2021.
19:29 Aug 05, 2021
ACTION:
Week of September 6, 2021—Tentative
There are no meetings scheduled for
the week of September 6, 2021.
The U.S. Nuclear Regulatory
Commission (NRC) is issuing for public
comment a draft Environmental Impact
Statement (EIS) for Westinghouse
Electric Company, LLC’s (WEC’s)
license renewal application to continue
to operate its Columbia Fuel Fabrication
Facility (CFFF) for an additional 40
years. The CFFF is located in Hopkins,
South Carolina, and manufactures
nuclear fuel assemblies for commercial
nuclear power plants. The WEC’s
license renewal request, if granted as
proposed, would allow the CFFF to
continue to be a source of nuclear fuel
for commercial nuclear power plants for
40 years from the date the NRC
approves the renewal.
DATES: The NRC staff will hold a virtual
public meeting through online webinar
and teleconference call on the draft EIS
at 6:00 p.m. (ET) on August 26, 2021.
The NRC staff will present the
preliminary findings documented in the
draft EIS and receive public comments
during this virtual, transcribed public
meeting. Members of the public are
invited to submit comments by
September 20, 2021. Comments received
after this date will be considered, if it
is practical to do so, but the
Commission is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov/ and search
for Docket ID NRC–2015–0039. Address
questions about Docket IDs to Stacy
Schumann; telephone: 301–415–0624;
email: Stacy.Schumann@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Office of
Administration, Mail Stop: TWFN–7–
A60M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, ATTN: Program Management,
Announcements and Editing Staff.
• Email comments to: WEC_CFFF_
EIS@nrc.gov.
• Leave comments by voicemail at:
1–800–216–0881.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Diana Diaz-Toro, telephone: 301–415–
Week of September 13, 2021—Tentative
Tuesday, September 14, 2021
10:00 a.m. Briefing on NRC
International Activities (Closed—
Ex. 1 & 9)
CONTACT PERSON FOR MORE INFORMATION:
For more information or to verify the
status of meetings, contact Wesley Held
at 301–287–3591 or via email at
Wesley.Held@nrc.gov. The schedule for
Commission meetings is subject to
change on short notice.
The NRC Commission Meeting
Schedule can be found on the internet
at: https://www.nrc.gov/public-involve/
public-meetings/schedule.html.
The NRC provides reasonable
accommodation to individuals with
disabilities where appropriate. If you
need a reasonable accommodation to
participate in these public meetings or
need this meeting notice or the
transcript or other information from the
public meetings in another format (e.g.,
braille, large print), please notify Anne
Silk, NRC Disability Program Specialist,
at 301–287–0745, by videophone at
240–428–3217, or by email at
Anne.Silk@nrc.gov. Determinations on
requests for reasonable accommodation
will be made on a case-by-case basis.
Members of the public may request to
receive this information electronically.
If you would like to be added to the
distribution, please contact the Nuclear
Regulatory Commission, Office of the
Secretary, Washington, DC 20555, at
301–415–1969, or by email at
Wendy.Moore@nrc.gov.
The NRC is holding the meetings
under the authority of the Government
in the Sunshine Act, 5 U.S.C. 552b.
Dated: August 4, 2021.
For the Nuclear Regulatory Commission.
Monika G. Coflin,
Technical Coordinator, Office of the
Secretary.
[FR Doc. 2021–16962 Filed 8–4–21; 4:15 pm]
BILLING CODE 7590–01–P
Week of August 9, 2021
VerDate Sep<11>2014
Week of August 30, 2021—Tentative
There are no meetings scheduled for
the week of August 30, 2021.
Jkt 253001
NUCLEAR REGULATORY
COMMISSION
[Docket No. 70–1151; NRC–2015–0039]
Westinghouse Electric Company, LLC;
Columbia Fuel Fabrication Facility
Nuclear Regulatory
Commission.
AGENCY:
PO 00000
Frm 00118
Fmt 4703
Sfmt 4703
Draft environmental impact
statement; request for comment and
public comment meeting.
SUMMARY:
E:\FR\FM\06AUN1.SGM
06AUN1
Federal Register / Vol. 86, No. 149 / Friday, August 6, 2021 / Notices
0930; email: Diana.Diaz-Toro@nrc.gov
or Jean Trefethen, telephone: 301–415–
0867; email: Jean.Trefethen@nrc.gov.
Both are staff of the Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC–2015–
0039 when contacting the NRC about
the availability of information regarding
this document. You may obtain publicly
available information related to this
action by the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2015–0039.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The draft EIS can be found in
ADAMS under Accession No.
ML21209A213.
B. Submitting Comments
Please include Docket ID NRC–2015–
0039. The NRC cautions you not to
include identifying or contact
information that you do not want to be
publicly disclosed in your comment
Meeting
Date
Time
Virtual Public Meeting ............
August 26, 2021 ....................
6:00 p.m.–9:00 p.m. (ET) ......
Persons interested in attending this
meeting should check the NRC’s Public
Meeting Schedule web page at https://
www.nrc.gov/pmns/mtg for additional
information, agenda for the meeting,
and access information for the webinar
and telephone line.
III. Discussion
jbell on DSKJLSW7X2PROD with NOTICES
• Attention: The PDR, where you may
examine and order copies of public
documents, is currently closed. You
may submit your request to the PDR via
email at pdr.resource@nrc.gov or call
1–800–397–4209 or 301–415–4737,
between 8:00 a.m. and 4:00 p.m. (ET),
Monday through Friday, except Federal
holidays.
• Project Website: Information related
to the WEC project can be accessed on
the NRC’s WEC website at https://
www.nrc.gov/info-finder/fc/
westinghouse-fuel-fab-fac-sc-lc.html.
Under the section titled ‘‘Operating,’’
scroll down to ‘‘Key Documents’’ and
click on Draft EIS, NUREG–2248, Draft
Report for Comment.
• Public Libraries: A copy of the NRC
staff’s draft EIS will be made accessible
at the following public libraries (library
access and hours are determined by
local policy):
• Richland Public Library—Main:
1431 Assembly St., Columbia, SC 29201;
• Richland Public Library—Lower
Richland: 9019 Garners Ferry Road,
Hopkins, SC 29061; and
• Richland Public Library—Eastover:
608 Main Street, Eastover, SC 29044.
The NRC is issuing for public
comment the draft EIS for WEC’s license
renewal application, which includes the
NRC staff’s analysis that evaluates the
environmental impacts of the proposed
action and alternatives to the proposed
action. Based on the NRC staff’s (i)
review of the license renewal
application request, which includes the
environmental report, supplemental
documents, and the licensee’s responses
VerDate Sep<11>2014
19:29 Aug 05, 2021
Jkt 253001
PO 00000
submission. The NRC will post all
comment submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Meeting Information
The NRC is announcing that staff will
hold a virtual public meeting as an
online webinar and teleconference to
receive comments on the draft EIS.
Video of the staff’s presentation will be
accessible online at the webinar address
and audio will only be accessible
through the telephone line. The
telephone line will also be used for the
public to submit oral comments. A court
reporter will be recording all comments
received during the webinar and the
transcript of the meeting will be made
publicly available. The date and time for
the public webinar is as follows:
Webinar information
to the NRC staff’s requests for additional
information; (ii) consultation with
Federal, State, and Tribal agencies and
input from other stakeholders; and (iii)
independent review as documented in
the assessments summarized in the draft
EIS, the NRC staff has concluded that
the proposed action would result in
small impacts on all resource areas
except for groundwater resources for
which the impacts would be small to
moderate.
Dated: July 30, 2021.
43277
Webinar Access (Video):
Event address: https://usnrc.webex.com.
Event number: 199 891 1794.
Event password: WESTDEIS.
Telephone Access (Audio):
Phone number: 1–800–369–3311.
Passcode: 5558821.
For the Nuclear Regulatory Commission.
Jessie M. Quintero,
Chief, Environmental Review Materials
Branch, Division of Rulemaking,
Environmental and Financial Support, Office
of Nuclear Material Safety, and Safeguards.
[FR Doc. 2021–16595 Filed 8–5–21; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 72–1050; NRC–2016–0231]
Interim Storage Partners Consolidated
Interim Storage Facility Project
Nuclear Regulatory
Commission.
AGENCY:
Frm 00119
Fmt 4703
Sfmt 4703
E:\FR\FM\06AUN1.SGM
06AUN1
Agencies
[Federal Register Volume 86, Number 149 (Friday, August 6, 2021)]
[Notices]
[Pages 43276-43277]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-16595]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 70-1151; NRC-2015-0039]
Westinghouse Electric Company, LLC; Columbia Fuel Fabrication
Facility
AGENCY: Nuclear Regulatory Commission.
ACTION: Draft environmental impact statement; request for comment and
public comment meeting.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for
public comment a draft Environmental Impact Statement (EIS) for
Westinghouse Electric Company, LLC's (WEC's) license renewal
application to continue to operate its Columbia Fuel Fabrication
Facility (CFFF) for an additional 40 years. The CFFF is located in
Hopkins, South Carolina, and manufactures nuclear fuel assemblies for
commercial nuclear power plants. The WEC's license renewal request, if
granted as proposed, would allow the CFFF to continue to be a source of
nuclear fuel for commercial nuclear power plants for 40 years from the
date the NRC approves the renewal.
DATES: The NRC staff will hold a virtual public meeting through online
webinar and teleconference call on the draft EIS at 6:00 p.m. (ET) on
August 26, 2021. The NRC staff will present the preliminary findings
documented in the draft EIS and receive public comments during this
virtual, transcribed public meeting. Members of the public are invited
to submit comments by September 20, 2021. Comments received after this
date will be considered, if it is practical to do so, but the
Commission is able to ensure consideration only for comments received
on or before this date.
ADDRESSES: You may submit comments by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2015-0039. Address
questions about Docket IDs to Stacy Schumann; telephone: 301-415-0624;
email: [email protected]. For technical questions, contact the
individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: Office of Administration, Mail Stop:
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
Email comments to: WEC_CFFF_EI[email protected].
Leave comments by voicemail at: 1-800-216-0881.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Diana Diaz-Toro, telephone: 301-415-
[[Page 43277]]
0930; email: [email protected] or Jean Trefethen, telephone: 301-
415-0867; email: [email protected]. Both are staff of the Office
of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2015-0039 when contacting the NRC
about the availability of information regarding this document. You may
obtain publicly available information related to this action by the
following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0039.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The draft EIS can be found in ADAMS
under Accession No. ML21209A213.
Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at [email protected] or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through
Friday, except Federal holidays.
Project Website: Information related to the WEC project
can be accessed on the NRC's WEC website at https://www.nrc.gov/info-finder/fc/westinghouse-fuel-fab-fac-sc-lc.html. Under the section
titled ``Operating,'' scroll down to ``Key Documents'' and click on
Draft EIS, NUREG-2248, Draft Report for Comment.
Public Libraries: A copy of the NRC staff's draft EIS will
be made accessible at the following public libraries (library access
and hours are determined by local policy):
Richland Public Library--Main: 1431 Assembly St.,
Columbia, SC 29201;
Richland Public Library--Lower Richland: 9019 Garners
Ferry Road, Hopkins, SC 29061; and
Richland Public Library--Eastover: 608 Main Street,
Eastover, SC 29044.
B. Submitting Comments
Please include Docket ID NRC-2015-0039. The NRC cautions you not to
include identifying or contact information that you do not want to be
publicly disclosed in your comment submission. The NRC will post all
comment submissions at https://www.regulations.gov as well as enter the
comment submissions into ADAMS. The NRC does not routinely edit comment
submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Meeting Information
The NRC is announcing that staff will hold a virtual public meeting
as an online webinar and teleconference to receive comments on the
draft EIS. Video of the staff's presentation will be accessible online
at the webinar address and audio will only be accessible through the
telephone line. The telephone line will also be used for the public to
submit oral comments. A court reporter will be recording all comments
received during the webinar and the transcript of the meeting will be
made publicly available. The date and time for the public webinar is as
follows:
--------------------------------------------------------------------------------------------------------------------------------------------------------
Meeting Date Time Webinar information
--------------------------------------------------------------------------------------------------------------------------------------------------------
Virtual Public Meeting.............. August 26, 2021........ 6:00 p.m.-9:00 p.m. Webinar Access (Video):
(ET). Event address: https://usnrc.webex.com.Event Event number: 199 891 1794.
Event password: WESTDEIS.
Telephone Access (Audio):
Phone number: 1-800-369-3311.
Passcode: 5558821.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Persons interested in attending this meeting should check the NRC's
Public Meeting Schedule web page at https://www.nrc.gov/pmns/mtg for
additional information, agenda for the meeting, and access information
for the webinar and telephone line.
III. Discussion
The NRC is issuing for public comment the draft EIS for WEC's
license renewal application, which includes the NRC staff's analysis
that evaluates the environmental impacts of the proposed action and
alternatives to the proposed action. Based on the NRC staff's (i)
review of the license renewal application request, which includes the
environmental report, supplemental documents, and the licensee's
responses to the NRC staff's requests for additional information; (ii)
consultation with Federal, State, and Tribal agencies and input from
other stakeholders; and (iii) independent review as documented in the
assessments summarized in the draft EIS, the NRC staff has concluded
that the proposed action would result in small impacts on all resource
areas except for groundwater resources for which the impacts would be
small to moderate.
Dated: July 30, 2021.
For the Nuclear Regulatory Commission.
Jessie M. Quintero,
Chief, Environmental Review Materials Branch, Division of Rulemaking,
Environmental and Financial Support, Office of Nuclear Material Safety,
and Safeguards.
[FR Doc. 2021-16595 Filed 8-5-21; 8:45 am]