Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility, 43276-43277 [2021-16595]

Download as PDF 43276 Federal Register / Vol. 86, No. 149 / Friday, August 6, 2021 / Notices the National Science Foundation Act, as amended (42 U.S.C. 1862n–5), and the Government in the Sunshine Act (5 U.S.C. 552b). All open sessions of the meeting will be webcast live on the NSB YouTube channel. Please feel free to share these links with your colleagues: Tuesday, August 3—https:// www.youtube.com/ watch?v=BtZZe7TMYqY Wednesday, August 4—https:// www.youtube.com/watch?v=qsskuQSSuE Please refer to the NSB website for additional information. You will find any updated meeting information and schedule updates (time, place, subject matter, or status of meeting) at https:// www.nsf.gov/nsb/meetings/notices.jsp. Members of the public are advised that the NSB provides some flexibility around its meeting times. A meeting may be allowed to run over by as much as 15 minutes if the Chair decides the extra time is warranted. The next meeting will start no later than 15 minutes after the noticed start time. If a meeting ends early, the next meeting may start up to 15 minutes earlier than the noticed start time. NSB and committee meetings will not vary from noticed times by more than 15 minutes. Open meetings can also be watched in their entirety later through the YouTube link. Chris Blair, Executive Assistant to the National Science Board Office. [FR Doc. 2021–16896 Filed 8–4–21; 11:15 am] BILLING CODE 7555–01–P NUCLEAR REGULATORY COMMISSION [NRC–2021–0001] Sunshine Act Meetings Weeks of August 9, 16, 23, 30, September 6, 13, 2021. PLACE: Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. STATUS: Closed. MATTERS TO BE CONSIDERED: TIME AND DATE: jbell on DSKJLSW7X2PROD with NOTICES There are no meetings scheduled for the week of August 9, 2021. Week of August 16, 2021—Tentative There are no meetings scheduled for the week of August 16, 2021. Week of August 23, 2021—Tentative There are no meetings scheduled for the week of August 23, 2021. 19:29 Aug 05, 2021 ACTION: Week of September 6, 2021—Tentative There are no meetings scheduled for the week of September 6, 2021. The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Environmental Impact Statement (EIS) for Westinghouse Electric Company, LLC’s (WEC’s) license renewal application to continue to operate its Columbia Fuel Fabrication Facility (CFFF) for an additional 40 years. The CFFF is located in Hopkins, South Carolina, and manufactures nuclear fuel assemblies for commercial nuclear power plants. The WEC’s license renewal request, if granted as proposed, would allow the CFFF to continue to be a source of nuclear fuel for commercial nuclear power plants for 40 years from the date the NRC approves the renewal. DATES: The NRC staff will hold a virtual public meeting through online webinar and teleconference call on the draft EIS at 6:00 p.m. (ET) on August 26, 2021. The NRC staff will present the preliminary findings documented in the draft EIS and receive public comments during this virtual, transcribed public meeting. Members of the public are invited to submit comments by September 20, 2021. Comments received after this date will be considered, if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date. ADDRESSES: You may submit comments by any of the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC–2015–0039. Address questions about Docket IDs to Stacy Schumann; telephone: 301–415–0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • Mail comments to: Office of Administration, Mail Stop: TWFN–7– A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, ATTN: Program Management, Announcements and Editing Staff. • Email comments to: WEC_CFFF_ EIS@nrc.gov. • Leave comments by voicemail at: 1–800–216–0881. For additional direction on obtaining information and submitting comments, see ‘‘Obtaining Information and Submitting Comments’’ in the SUPPLEMENTARY INFORMATION section of this document. FOR FURTHER INFORMATION CONTACT: Diana Diaz-Toro, telephone: 301–415– Week of September 13, 2021—Tentative Tuesday, September 14, 2021 10:00 a.m. Briefing on NRC International Activities (Closed— Ex. 1 & 9) CONTACT PERSON FOR MORE INFORMATION: For more information or to verify the status of meetings, contact Wesley Held at 301–287–3591 or via email at Wesley.Held@nrc.gov. The schedule for Commission meetings is subject to change on short notice. The NRC Commission Meeting Schedule can be found on the internet at: https://www.nrc.gov/public-involve/ public-meetings/schedule.html. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in these public meetings or need this meeting notice or the transcript or other information from the public meetings in another format (e.g., braille, large print), please notify Anne Silk, NRC Disability Program Specialist, at 301–287–0745, by videophone at 240–428–3217, or by email at Anne.Silk@nrc.gov. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Members of the public may request to receive this information electronically. If you would like to be added to the distribution, please contact the Nuclear Regulatory Commission, Office of the Secretary, Washington, DC 20555, at 301–415–1969, or by email at Wendy.Moore@nrc.gov. The NRC is holding the meetings under the authority of the Government in the Sunshine Act, 5 U.S.C. 552b. Dated: August 4, 2021. For the Nuclear Regulatory Commission. Monika G. Coflin, Technical Coordinator, Office of the Secretary. [FR Doc. 2021–16962 Filed 8–4–21; 4:15 pm] BILLING CODE 7590–01–P Week of August 9, 2021 VerDate Sep<11>2014 Week of August 30, 2021—Tentative There are no meetings scheduled for the week of August 30, 2021. Jkt 253001 NUCLEAR REGULATORY COMMISSION [Docket No. 70–1151; NRC–2015–0039] Westinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility Nuclear Regulatory Commission. AGENCY: PO 00000 Frm 00118 Fmt 4703 Sfmt 4703 Draft environmental impact statement; request for comment and public comment meeting. SUMMARY: E:\FR\FM\06AUN1.SGM 06AUN1 Federal Register / Vol. 86, No. 149 / Friday, August 6, 2021 / Notices 0930; email: Diana.Diaz-Toro@nrc.gov or Jean Trefethen, telephone: 301–415– 0867; email: Jean.Trefethen@nrc.gov. Both are staff of the Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001. SUPPLEMENTARY INFORMATION: I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC–2015– 0039 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this action by the following methods: • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC–2015–0039. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301– 415–4737, or by email to pdr.resource@ nrc.gov. The draft EIS can be found in ADAMS under Accession No. ML21209A213. B. Submitting Comments Please include Docket ID NRC–2015– 0039. The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment Meeting Date Time Virtual Public Meeting ............ August 26, 2021 .................... 6:00 p.m.–9:00 p.m. (ET) ...... Persons interested in attending this meeting should check the NRC’s Public Meeting Schedule web page at https:// www.nrc.gov/pmns/mtg for additional information, agenda for the meeting, and access information for the webinar and telephone line. III. Discussion jbell on DSKJLSW7X2PROD with NOTICES • Attention: The PDR, where you may examine and order copies of public documents, is currently closed. You may submit your request to the PDR via email at pdr.resource@nrc.gov or call 1–800–397–4209 or 301–415–4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through Friday, except Federal holidays. • Project Website: Information related to the WEC project can be accessed on the NRC’s WEC website at https:// www.nrc.gov/info-finder/fc/ westinghouse-fuel-fab-fac-sc-lc.html. Under the section titled ‘‘Operating,’’ scroll down to ‘‘Key Documents’’ and click on Draft EIS, NUREG–2248, Draft Report for Comment. • Public Libraries: A copy of the NRC staff’s draft EIS will be made accessible at the following public libraries (library access and hours are determined by local policy): • Richland Public Library—Main: 1431 Assembly St., Columbia, SC 29201; • Richland Public Library—Lower Richland: 9019 Garners Ferry Road, Hopkins, SC 29061; and • Richland Public Library—Eastover: 608 Main Street, Eastover, SC 29044. The NRC is issuing for public comment the draft EIS for WEC’s license renewal application, which includes the NRC staff’s analysis that evaluates the environmental impacts of the proposed action and alternatives to the proposed action. Based on the NRC staff’s (i) review of the license renewal application request, which includes the environmental report, supplemental documents, and the licensee’s responses VerDate Sep<11>2014 19:29 Aug 05, 2021 Jkt 253001 PO 00000 submission. The NRC will post all comment submissions at https:// www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information. If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS. II. Meeting Information The NRC is announcing that staff will hold a virtual public meeting as an online webinar and teleconference to receive comments on the draft EIS. Video of the staff’s presentation will be accessible online at the webinar address and audio will only be accessible through the telephone line. The telephone line will also be used for the public to submit oral comments. A court reporter will be recording all comments received during the webinar and the transcript of the meeting will be made publicly available. The date and time for the public webinar is as follows: Webinar information to the NRC staff’s requests for additional information; (ii) consultation with Federal, State, and Tribal agencies and input from other stakeholders; and (iii) independent review as documented in the assessments summarized in the draft EIS, the NRC staff has concluded that the proposed action would result in small impacts on all resource areas except for groundwater resources for which the impacts would be small to moderate. Dated: July 30, 2021. 43277 Webinar Access (Video): Event address: https://usnrc.webex.com. Event number: 199 891 1794. Event password: WESTDEIS. Telephone Access (Audio): Phone number: 1–800–369–3311. Passcode: 5558821. For the Nuclear Regulatory Commission. Jessie M. Quintero, Chief, Environmental Review Materials Branch, Division of Rulemaking, Environmental and Financial Support, Office of Nuclear Material Safety, and Safeguards. [FR Doc. 2021–16595 Filed 8–5–21; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 72–1050; NRC–2016–0231] Interim Storage Partners Consolidated Interim Storage Facility Project Nuclear Regulatory Commission. AGENCY: Frm 00119 Fmt 4703 Sfmt 4703 E:\FR\FM\06AUN1.SGM 06AUN1

Agencies

[Federal Register Volume 86, Number 149 (Friday, August 6, 2021)]
[Notices]
[Pages 43276-43277]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-16595]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 70-1151; NRC-2015-0039]


Westinghouse Electric Company, LLC; Columbia Fuel Fabrication 
Facility

AGENCY: Nuclear Regulatory Commission.

ACTION: Draft environmental impact statement; request for comment and 
public comment meeting.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing for 
public comment a draft Environmental Impact Statement (EIS) for 
Westinghouse Electric Company, LLC's (WEC's) license renewal 
application to continue to operate its Columbia Fuel Fabrication 
Facility (CFFF) for an additional 40 years. The CFFF is located in 
Hopkins, South Carolina, and manufactures nuclear fuel assemblies for 
commercial nuclear power plants. The WEC's license renewal request, if 
granted as proposed, would allow the CFFF to continue to be a source of 
nuclear fuel for commercial nuclear power plants for 40 years from the 
date the NRC approves the renewal.

DATES: The NRC staff will hold a virtual public meeting through online 
webinar and teleconference call on the draft EIS at 6:00 p.m. (ET) on 
August 26, 2021. The NRC staff will present the preliminary findings 
documented in the draft EIS and receive public comments during this 
virtual, transcribed public meeting. Members of the public are invited 
to submit comments by September 20, 2021. Comments received after this 
date will be considered, if it is practical to do so, but the 
Commission is able to ensure consideration only for comments received 
on or before this date.

ADDRESSES: You may submit comments by any of the following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov/ and search for Docket ID NRC-2015-0039. Address 
questions about Docket IDs to Stacy Schumann; telephone: 301-415-0624; 
email: [email protected]. For technical questions, contact the 
individual listed in the FOR FURTHER INFORMATION CONTACT section of 
this document.
     Mail comments to: Office of Administration, Mail Stop: 
TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, ATTN: Program Management, Announcements and Editing Staff.
     Email comments to: WEC_CFFF_EI[email protected].
     Leave comments by voicemail at: 1-800-216-0881.
    For additional direction on obtaining information and submitting 
comments, see ``Obtaining Information and Submitting Comments'' in the 
SUPPLEMENTARY INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Diana Diaz-Toro, telephone: 301-415-

[[Page 43277]]

0930; email: [email protected] or Jean Trefethen, telephone: 301-
415-0867; email: [email protected]. Both are staff of the Office 
of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

    Please refer to Docket ID NRC-2015-0039 when contacting the NRC 
about the availability of information regarding this document. You may 
obtain publicly available information related to this action by the 
following methods:
     Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2015-0039.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS 
Search.'' For problems with ADAMS, please contact the NRC's Public 
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or 
by email to [email protected]. The draft EIS can be found in ADAMS 
under Accession No. ML21209A213.
     Attention: The PDR, where you may examine and order copies 
of public documents, is currently closed. You may submit your request 
to the PDR via email at [email protected] or call 1-800-397-4209 or 
301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through 
Friday, except Federal holidays.
     Project Website: Information related to the WEC project 
can be accessed on the NRC's WEC website at https://www.nrc.gov/info-finder/fc/westinghouse-fuel-fab-fac-sc-lc.html. Under the section 
titled ``Operating,'' scroll down to ``Key Documents'' and click on 
Draft EIS, NUREG-2248, Draft Report for Comment.
     Public Libraries: A copy of the NRC staff's draft EIS will 
be made accessible at the following public libraries (library access 
and hours are determined by local policy):
     Richland Public Library--Main: 1431 Assembly St., 
Columbia, SC 29201;
     Richland Public Library--Lower Richland: 9019 Garners 
Ferry Road, Hopkins, SC 29061; and
     Richland Public Library--Eastover: 608 Main Street, 
Eastover, SC 29044.

B. Submitting Comments

    Please include Docket ID NRC-2015-0039. The NRC cautions you not to 
include identifying or contact information that you do not want to be 
publicly disclosed in your comment submission. The NRC will post all 
comment submissions at https://www.regulations.gov as well as enter the 
comment submissions into ADAMS. The NRC does not routinely edit comment 
submissions to remove identifying or contact information.
    If you are requesting or aggregating comments from other persons 
for submission to the NRC, then you should inform those persons not to 
include identifying or contact information that they do not want to be 
publicly disclosed in their comment submission. Your request should 
state that the NRC does not routinely edit comment submissions to 
remove such information before making the comment submissions available 
to the public or entering the comment into ADAMS.

II. Meeting Information

    The NRC is announcing that staff will hold a virtual public meeting 
as an online webinar and teleconference to receive comments on the 
draft EIS. Video of the staff's presentation will be accessible online 
at the webinar address and audio will only be accessible through the 
telephone line. The telephone line will also be used for the public to 
submit oral comments. A court reporter will be recording all comments 
received during the webinar and the transcript of the meeting will be 
made publicly available. The date and time for the public webinar is as 
follows:

--------------------------------------------------------------------------------------------------------------------------------------------------------
               Meeting                          Date                     Time                                  Webinar information
--------------------------------------------------------------------------------------------------------------------------------------------------------
Virtual Public Meeting..............  August 26, 2021........  6:00 p.m.-9:00 p.m.      Webinar Access (Video):
                                                                (ET).                   Event address: https://usnrc.webex.com.Event Event number: 199 891 1794.
                                                                                        Event password: WESTDEIS.
                                                                                        Telephone Access (Audio):
                                                                                        Phone number: 1-800-369-3311.
                                                                                        Passcode: 5558821.
--------------------------------------------------------------------------------------------------------------------------------------------------------

    Persons interested in attending this meeting should check the NRC's 
Public Meeting Schedule web page at https://www.nrc.gov/pmns/mtg for 
additional information, agenda for the meeting, and access information 
for the webinar and telephone line.

III. Discussion

    The NRC is issuing for public comment the draft EIS for WEC's 
license renewal application, which includes the NRC staff's analysis 
that evaluates the environmental impacts of the proposed action and 
alternatives to the proposed action. Based on the NRC staff's (i) 
review of the license renewal application request, which includes the 
environmental report, supplemental documents, and the licensee's 
responses to the NRC staff's requests for additional information; (ii) 
consultation with Federal, State, and Tribal agencies and input from 
other stakeholders; and (iii) independent review as documented in the 
assessments summarized in the draft EIS, the NRC staff has concluded 
that the proposed action would result in small impacts on all resource 
areas except for groundwater resources for which the impacts would be 
small to moderate.

    Dated: July 30, 2021.

    For the Nuclear Regulatory Commission.
Jessie M. Quintero,
Chief, Environmental Review Materials Branch, Division of Rulemaking, 
Environmental and Financial Support, Office of Nuclear Material Safety, 
and Safeguards.
[FR Doc. 2021-16595 Filed 8-5-21; 8:45 am]
BILLING CODE 7590-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.