Alabama Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Capacity
Amendment of License.
b. Project No: P–2146–260.
c. Date Filed: July 2, 2021.
d. Applicant: Alabama Power
Company (Alabama Power).
e. Name of Project: Coosa River
Project.
f. Location: The project is located on
the Coosa River, in Coosa, Chilton,
Talladega and Shelby counties,
Alabama.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Alan L. Peeples,
Alabama Power Company, 600 North
18th Street, P.O. Box 2641, Birmingham,
AL 35291–8180, (205) 257–1401.
i. FERC Contact: Zeena Aljibury, (202)
502–6065, zeena.aljibury@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–2146–260. Comments
VerDate Sep<11>2014
17:07 Aug 04, 2021
Jkt 253001
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency
k. Description of Request: Alabama
Power requests approval to modify Unit
6 at the Lay Development to address
significant maintenance needs and to
improve power and efficiency. The
proposed scope of work for Unit 6
includes complete turbine replacement,
wicket gate replacement, wicket gate
stem bushings installation, turbine, and
generator bearing upgrades, and related
component replacement. Alabama
Power states the turbine replacement is
not expected to result in an increase to
the total rated capacity or the maximum
discharge of the unit at rated conditions.
Alabama Power notes that project
operations will not change, and
refurbishment will not include any
structural changes to the project
facilities.
l. Locations of the Application: The
Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Agencies may obtain copies of the
application directly from the applicant.
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll free, (866) 208–3676 or TTY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: July 30, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–16730 Filed 8–4–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–467–000]
Texas Gas Transmission, LLC; Notice
of Scoping Period Requesting
Comments on Environmental Issues
for the Proposed Henderson County
Expansion Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental document that will
discuss the environmental impacts of
the Henderson County Expansion
Project involving construction and
operation of facilities by Texas Gas
Transmission, LLC (Texas Gas) in
Henderson and Webster Counties,
E:\FR\FM\05AUN1.SGM
05AUN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 86, No. 148 / Thursday, August 5, 2021 / Notices
Kentucky and Posey and Johnson
Counties, Indiana. The Commission will
use this environmental document in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies regarding the
project. As part of the National
Environmental Policy Act (NEPA)
review process, the Commission takes
into account concerns the public may
have about proposals and the
environmental impacts that could result
from its action whenever it considers
the issuance of a Certificate of Public
Convenience and Necessity. This
gathering of public input is referred to
as ‘‘scoping.’’ The main goal of the
scoping process is to focus the analysis
in the environmental document on the
important environmental issues.
Additional information about the
Commission’s NEPA process is
described below in the NEPA Process
and Environmental Document section of
this notice.
By this notice, the Commission
requests public comments on the scope
of issues to address in the
environmental document. To ensure
that your comments are timely and
properly recorded, please submit your
comments so that the Commission
receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on
August 30, 2021. Comments may be
submitted in written form. Further
details on how to submit comments are
provided in the Public Participation
section of this notice.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
Your input will help the Commission
staff determine what issues they need to
evaluate in the environmental
document. Commission staff will
consider all written comments during
the preparation of the environmental
document.
If you submitted comments on this
project to the Commission before the
opening of this docket on June 25, 2021,
you will need to file those comments in
Docket No. CP21–467–000 to ensure
they are considered as part of this
proceeding.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
VerDate Sep<11>2014
17:07 Aug 04, 2021
Jkt 253001
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
easement agreement. You are not
required to enter into an agreement.
However, if the Commission approves
the project, the Natural Gas Act conveys
the right of eminent domain to the
company. Therefore, if you and the
company do not reach an easement
agreement, the pipeline company could
initiate condemnation proceedings in
court. In such instances, compensation
would be determined by a judge in
accordance with state law. The
Commission does not subsequently
grant, exercise, or oversee the exercise
of that eminent domain authority. The
courts have exclusive authority to
handle eminent domain cases; the
Commission has no jurisdiction over
these matters.
Texas Gas provided landowners with
a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ which addresses typically
asked questions, including the use of
eminent domain and how to participate
in the Commission’s proceedings. This
fact sheet along with other landowner
topics of interest are available for
viewing on the FERC website
(www.ferc.gov) under the Natural Gas
Questions or Landowner Topics link.
Public Participation
There are three methods you can use
to submit your comments to the
Commission. Please carefully follow
these instructions so that your
comments are properly recorded. The
Commission encourages electronic filing
of comments and has staff available to
assist you at (866) 208–3676 or
FercOnlineSupport@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. Using
eComment is an easy method for
submitting brief, text-only comments on
a project;
(2) You can file your comments
electronically by using the eFiling
feature, which is located on the
Commission’s website (www.ferc.gov)
under the link to FERC Online. With
eFiling, you can provide comments in a
variety of formats by attaching them as
a file with your submission. New
eFiling users must first create an
account by clicking on ‘‘eRegister.’’ You
will be asked to select the type of filing
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
42821
you are making; a comment on a
particular project is considered a
‘‘Comment on a Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
Commission. Be sure to reference the
project docket number (CP21–467–000)
on your letter. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, MD 20852.
Additionally, the Commission offers a
free service called eSubscription which
makes it easy to stay informed of all
issuances and submittals regarding the
dockets/projects to which you
subscribe. These instant email
notifications are the fastest way to
receive notification and provide a link
to the document files which can reduce
the amount of time you spend
researching proceedings. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Summary of the Proposed Project
Texas Gas proposes to construct and
operate a new lateral and meter and
regulator (M&R) station, upgrade an
existing M&R station, and add
additional compression to and modify
Texas Gas’ existing Slaughters
Compressor Station. The Henderson
County Expansion Project would
provide up to 220 million standard
cubic feet of natural gas per day to
Southern Indiana Gas and Electric
Company d/b/a CenterPoint Energy
Indiana South (CenterPoint) at its AB
Brown Generating Station in Posey
County, Indiana. According to Texas
Gas, its project would support
CenterPoint’s retirement of four existing
coal-fired units and implementation of
new intermittent renewable resources
(i.e., solar and wind) by providing the
reliability of intermittent natural gas
service during natural fluctuations in
wind and solar availability.
The Henderson County Expansion
Project would consist of the following
facilities:
• Henderson County Lateral—
Construction of an approximately 24mile-long, 20-inch-diameter natural gas
transmission pipeline extending from a
new tie-in facility in Henderson County,
Kentucky to the new AB Brown M&R
Station in Posey County, Indiana.
• AB Brown M&R Station and Point
of Demarcation Site (Posey County,
Indiana)—Construction of a delivery
M&R station, receiver facility, and a
E:\FR\FM\05AUN1.SGM
05AUN1
42822
Federal Register / Vol. 86, No. 148 / Thursday, August 5, 2021 / Notices
0.08-mile-long, 16-inch-diameter
interconnecting pipeline terminating at
the new Point of Demarcation Site
which would serve as CenterPoint’s tiein for project facilities for its AB Brown
Plant.
• Slaughters Compressor Station
(Webster County, Kentucky)—
Installation of a new 4,863-horsepower
Solar Centaur 50 turbine compressor
unit with piping modifications and
other appurtenant facilities,
abandonment in place of the existing
Compressor Unit 5, and placement on
standby of existing Compressor Units 6
and 7.
• New ancillary facilities including a
main line valve and tie-in facility in
Henderson County, Kentucky and
upgrades to an existing M&R station in
Johnson County, Indiana.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 402 acres of land
for the aboveground facilities and the
pipeline. Following construction, Texas
Gas would maintain about 152 acres for
permanent operation of the project’s
facilities; the remaining acreage would
be restored and revert to former uses.
About 47.5 percent of the proposed
pipeline route parallels existing
pipeline, utility, or road rights-of-way.
NEPA Process and the Environmental
Document
khammond on DSKJM1Z7X2PROD with NOTICES
Any environmental document issued
by the Commission will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under the relevant
general resource areas:
• Geology and soils;
• water resources and wetlands;
• vegetation and wildlife;
• threatened and endangered species;
• cultural resources;
• land use;
• air quality and noise; and
• reliability and safety.
Commission staff will also evaluate
reasonable alternatives to the proposed
project or portions of the project and
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of the
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary.’’ For instructions on
connecting to eLibrary, refer to the last page of this
notice. At this time, the Commission has suspended
access to the Commission’s Public Reference Room
due to the proclamation declaring a National
Emergency concerning the Novel Coronavirus
Disease (COVID–19), issued by the President on
March 13, 2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll free, (886)
208–3676 or TTY (202) 502–8659.
VerDate Sep<11>2014
17:07 Aug 04, 2021
Jkt 253001
make recommendations on how to
lessen or avoid impacts on the various
resource areas. Your comments will
help Commission staff identify and
focus on the issues that might have an
effect on the human environment and
potentially eliminate other issues from
further study and discussion in the
environmental document.
Following this scoping period,
Commission staff will determine
whether to prepare an Environmental
Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the
EIS will present Commission staff’s
independent analysis of the issues. If
Commission staff prepares an EA, a
Notice of Schedule for the Preparation
of an Environmental Assessment will be
issued. The EA may be issued for an
allotted public comment period. The
Commission would consider timely
comments on the EA before making its
decision regarding the proposed project.
If Commission staff prepares an EIS, a
Notice of Intent to Prepare an EIS/
Notice of Schedule will be issued,
which will open up an additional
comment period. Staff would then
prepare a draft EIS which would be
issued for public comment. Commission
staff will consider all timely comments
received during the comment period on
the draft EIS and revise the document,
as necessary, before issuing a final EIS.
Any EA or draft and final EIS will be
available in electronic format in the
public record through eLibrary 2 and the
Commission’s natural gas
environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents). If
eSubscribed, you will receive instant
email notification when the
environmental document is issued.
With this notice, the Commission is
asking agencies with jurisdiction by law
and/or special expertise with respect to
the environmental issues of this project
to formally cooperate in the preparation
of the environmental document.3
Agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice.
Consultation Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
2 For
instructions on connecting to eLibrary, refer
to the last page of this notice.
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.8.
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
106 of the National Historic
Preservation Act, the Commission is
using this notice to initiate consultation
with the applicable State Historic
Preservation Office(s), and to solicit
their views and those of other
government agencies, interested Indian
tribes, and the public on the project’s
potential effects on historic properties.4
The environmental document for this
project will document findings on the
impacts on historic properties and
summarize the status of consultations
under section 106.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP21–467–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\05AUN1.SGM
05AUN1
Federal Register / Vol. 86, No. 148 / Thursday, August 5, 2021 / Notices
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: July 29, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–16687 Filed 8–4–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–477–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Enable Gas Transmission, LLC; Notice
of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on July 22, 2021,
Enable Gas Transmission, LLC (Enable),
910 Louisiana Street, Ste. 48040,
Houston, Texas 77002, filed in the
above referenced docket a prior notice
pursuant to sections 157.205, 157.208,
and 157.211 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act (NGA), and
Enable’s blanket certificate issued in
Docket Nos. CP82–384–000 and CP82–
384–001, for authorization to construct:
(i) The 2.6-mile-long, 8-inch-diameter
JM–44 pipeline from Enable’s existing
Line J to a new meter station; (ii) the
Nucor Meter Station; (iii) the 0.6-milelong, 8-inch-diameter JM–44A pipeline;
and (iv) aboveground auxiliary facilities
at the tie-in locations on Enable’s
existing Line J and Line JM–40 all
located in Mississippi County, Arkansas
(Nucor Pipeline Project). The project
will allow Enable to transport 5,000
dekatherms per day of firm
transportation capacity to Nucor
Corporation’s Cold Steel Mill (Nucor).
VerDate Sep<11>2014
17:07 Aug 04, 2021
Jkt 253001
Enable states that the project is being
proposed because they claim that the
local distribution company that
currently delivers Nucor’s natural gas
cannot meet Nucor’s additional volumes
requirements. The estimated cost for the
project is $3,798,095, all as more fully
set forth in the request which is on file
with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to Lisa
Yoho, Sr. Director Regulatory and FERC
Compliance, Enable Gas Transmission,
LLC, 910 Louisiana Street, 48th floor,
Houston, Texas 77002, by phone: (346)
701–2539, by facsimile: (346) 701–2905,
or by email: lisa.yoho@
enablemidstream.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on September 28, 2021.
How to file protests, motions to
intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is
September 28, 2021. A protest may also
serve as a motion to intervene so long
as the protestor states it also seeks to be
an intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is September 28,
2021. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
1 18
2 Persons
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
42823
3 18
CFR 157.205(e).
CFR 385.214.
5 18 CFR 157.10.
4 18
E:\FR\FM\05AUN1.SGM
05AUN1
Agencies
[Federal Register Volume 86, Number 148 (Thursday, August 5, 2021)]
[Notices]
[Pages 42820-42823]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-16687]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-467-000]
Texas Gas Transmission, LLC; Notice of Scoping Period Requesting
Comments on Environmental Issues for the Proposed Henderson County
Expansion Project
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental document that will discuss
the environmental impacts of the Henderson County Expansion Project
involving construction and operation of facilities by Texas Gas
Transmission, LLC (Texas Gas) in Henderson and Webster Counties,
[[Page 42821]]
Kentucky and Posey and Johnson Counties, Indiana. The Commission will
use this environmental document in its decision-making process to
determine whether the project is in the public convenience and
necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies regarding the project. As part of the National Environmental
Policy Act (NEPA) review process, the Commission takes into account
concerns the public may have about proposals and the environmental
impacts that could result from its action whenever it considers the
issuance of a Certificate of Public Convenience and Necessity. This
gathering of public input is referred to as ``scoping.'' The main goal
of the scoping process is to focus the analysis in the environmental
document on the important environmental issues. Additional information
about the Commission's NEPA process is described below in the NEPA
Process and Environmental Document section of this notice.
By this notice, the Commission requests public comments on the
scope of issues to address in the environmental document. To ensure
that your comments are timely and properly recorded, please submit your
comments so that the Commission receives them in Washington, DC on or
before 5:00 p.m. Eastern Time on August 30, 2021. Comments may be
submitted in written form. Further details on how to submit comments
are provided in the Public Participation section of this notice.
Your comments should focus on the potential environmental effects,
reasonable alternatives, and measures to avoid or lessen environmental
impacts. Your input will help the Commission staff determine what
issues they need to evaluate in the environmental document. Commission
staff will consider all written comments during the preparation of the
environmental document.
If you submitted comments on this project to the Commission before
the opening of this docket on June 25, 2021, you will need to file
those comments in Docket No. CP21-467-000 to ensure they are considered
as part of this proceeding.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable easement agreement. You
are not required to enter into an agreement. However, if the Commission
approves the project, the Natural Gas Act conveys the right of eminent
domain to the company. Therefore, if you and the company do not reach
an easement agreement, the pipeline company could initiate condemnation
proceedings in court. In such instances, compensation would be
determined by a judge in accordance with state law. The Commission does
not subsequently grant, exercise, or oversee the exercise of that
eminent domain authority. The courts have exclusive authority to handle
eminent domain cases; the Commission has no jurisdiction over these
matters.
Texas Gas provided landowners with a fact sheet prepared by the
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?'' which addresses typically asked questions, including
the use of eminent domain and how to participate in the Commission's
proceedings. This fact sheet along with other landowner topics of
interest are available for viewing on the FERC website (www.ferc.gov)
under the Natural Gas Questions or Landowner Topics link.
Public Participation
There are three methods you can use to submit your comments to the
Commission. Please carefully follow these instructions so that your
comments are properly recorded. The Commission encourages electronic
filing of comments and has staff available to assist you at (866) 208-
3676 or [email protected].
(1) You can file your comments electronically using the eComment
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. Using eComment is an easy method for
submitting brief, text-only comments on a project;
(2) You can file your comments electronically by using the eFiling
feature, which is located on the Commission's website (www.ferc.gov)
under the link to FERC Online. With eFiling, you can provide comments
in a variety of formats by attaching them as a file with your
submission. New eFiling users must first create an account by clicking
on ``eRegister.'' You will be asked to select the type of filing you
are making; a comment on a particular project is considered a ``Comment
on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the Commission. Be sure to reference the project docket number (CP21-
467-000) on your letter. Submissions sent via the U.S. Postal Service
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC
20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
12225 Wilkins Avenue, Rockville, MD 20852.
Additionally, the Commission offers a free service called
eSubscription which makes it easy to stay informed of all issuances and
submittals regarding the dockets/projects to which you subscribe. These
instant email notifications are the fastest way to receive notification
and provide a link to the document files which can reduce the amount of
time you spend researching proceedings. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Summary of the Proposed Project
Texas Gas proposes to construct and operate a new lateral and meter
and regulator (M&R) station, upgrade an existing M&R station, and add
additional compression to and modify Texas Gas' existing Slaughters
Compressor Station. The Henderson County Expansion Project would
provide up to 220 million standard cubic feet of natural gas per day to
Southern Indiana Gas and Electric Company d/b/a CenterPoint Energy
Indiana South (CenterPoint) at its AB Brown Generating Station in Posey
County, Indiana. According to Texas Gas, its project would support
CenterPoint's retirement of four existing coal-fired units and
implementation of new intermittent renewable resources (i.e., solar and
wind) by providing the reliability of intermittent natural gas service
during natural fluctuations in wind and solar availability.
The Henderson County Expansion Project would consist of the
following facilities:
Henderson County Lateral--Construction of an approximately
24-mile-long, 20-inch-diameter natural gas transmission pipeline
extending from a new tie-in facility in Henderson County, Kentucky to
the new AB Brown M&R Station in Posey County, Indiana.
AB Brown M&R Station and Point of Demarcation Site (Posey
County, Indiana)--Construction of a delivery M&R station, receiver
facility, and a
[[Page 42822]]
0.08-mile-long, 16-inch-diameter interconnecting pipeline terminating
at the new Point of Demarcation Site which would serve as CenterPoint's
tie-in for project facilities for its AB Brown Plant.
Slaughters Compressor Station (Webster County, Kentucky)--
Installation of a new 4,863-horsepower Solar Centaur 50 turbine
compressor unit with piping modifications and other appurtenant
facilities, abandonment in place of the existing Compressor Unit 5, and
placement on standby of existing Compressor Units 6 and 7.
New ancillary facilities including a main line valve and
tie-in facility in Henderson County, Kentucky and upgrades to an
existing M&R station in Johnson County, Indiana.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of the appendices were sent to all
those receiving this notice in the mail and are available at
www.ferc.gov using the link called ``eLibrary.'' For instructions on
connecting to eLibrary, refer to the last page of this notice. At
this time, the Commission has suspended access to the Commission's
Public Reference Room due to the proclamation declaring a National
Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact
FERC at [email protected] or call toll free, (886) 208-3676
or TTY (202) 502-8659.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 402
acres of land for the aboveground facilities and the pipeline.
Following construction, Texas Gas would maintain about 152 acres for
permanent operation of the project's facilities; the remaining acreage
would be restored and revert to former uses. About 47.5 percent of the
proposed pipeline route parallels existing pipeline, utility, or road
rights-of-way.
NEPA Process and the Environmental Document
Any environmental document issued by the Commission will discuss
impacts that could occur as a result of the construction and operation
of the proposed project under the relevant general resource areas:
Geology and soils;
water resources and wetlands;
vegetation and wildlife;
threatened and endangered species;
cultural resources;
land use;
air quality and noise; and
reliability and safety.
Commission staff will also evaluate reasonable alternatives to the
proposed project or portions of the project and make recommendations on
how to lessen or avoid impacts on the various resource areas. Your
comments will help Commission staff identify and focus on the issues
that might have an effect on the human environment and potentially
eliminate other issues from further study and discussion in the
environmental document.
Following this scoping period, Commission staff will determine
whether to prepare an Environmental Assessment (EA) or an Environmental
Impact Statement (EIS). The EA or the EIS will present Commission
staff's independent analysis of the issues. If Commission staff
prepares an EA, a Notice of Schedule for the Preparation of an
Environmental Assessment will be issued. The EA may be issued for an
allotted public comment period. The Commission would consider timely
comments on the EA before making its decision regarding the proposed
project. If Commission staff prepares an EIS, a Notice of Intent to
Prepare an EIS/Notice of Schedule will be issued, which will open up an
additional comment period. Staff would then prepare a draft EIS which
would be issued for public comment. Commission staff will consider all
timely comments received during the comment period on the draft EIS and
revise the document, as necessary, before issuing a final EIS. Any EA
or draft and final EIS will be available in electronic format in the
public record through eLibrary \2\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). If eSubscribed, you
will receive instant email notification when the environmental document
is issued.
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
last page of this notice.
---------------------------------------------------------------------------
With this notice, the Commission is asking agencies with
jurisdiction by law and/or special expertise with respect to the
environmental issues of this project to formally cooperate in the
preparation of the environmental document.\3\ Agencies that would like
to request cooperating agency status should follow the instructions for
filing comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Section 1501.8.
---------------------------------------------------------------------------
Consultation Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, the Commission is using this notice to initiate
consultation with the applicable State Historic Preservation Office(s),
and to solicit their views and those of other government agencies,
interested Indian tribes, and the public on the project's potential
effects on historic properties.\4\ The environmental document for this
project will document findings on the impacts on historic properties
and summarize the status of consultations under section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project and includes a mailing address with their
comments. Commission staff will update the environmental mailing list
as the analysis proceeds to ensure that Commission notices related to
this environmental review are sent to all individuals, organizations,
and government entities interested in and/or potentially affected by
the proposed project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please complete one of
the following steps:
(1) Send an email to [email protected] stating your
request. You must include the docket number CP21-467-000 in your
request. If you are requesting a change to your address, please be sure
to include your name and the correct address. If you are requesting to
delete your address from the mailing list, please include your name and
address as it appeared on this notice. This email address is unable to
accept comments.
OR
(2) Return the attached ``Mailing List Update Form'' (appendix 2).
[[Page 42823]]
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Public sessions or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/news-events/events along with
other related information.
Dated: July 29, 2021.
Kimberly D. Bose,
Secretary.