Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 41469-41471 [2021-16422]

Download as PDF Federal Register / Vol. 86, No. 145 / Monday, August 2, 2021 / Notices Dated: July 27, 2021. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2021–16423 Filed 7–30–21; 8:45 am] BILLING CODE 6717–01–P [Project No. 2955–011] City of Watervliet, New York; Notice of Intent To Prepare an Environmental Assessment khammond on DSKJM1Z7X2PROD with NOTICES On February 28, 2020, the City of Watervliett, New York filed an application for a subsequent minor license for the 1.25-megawatt Normanskill Hydroelectric Project (Normanskill Project) (FERC No. 2955). The Normanskill Project is located on the Normans Kill in the Town of Guilderland in Albany County, New York. The project is located approximately 22.4 river miles upstream of the mouth of the Hudson River. The project does not occupy federal land. In accordance with the Commission’s regulations, on May 11, 2021, Commission staff issued a notice that the project was ready for environmental analysis (REA notice). Based on the information in the record, including comments filed on the REA notice, staff does not anticipate that licensing the project would constitute a major federal action significantly affecting the quality of the human environment. Therefore, staff intends to prepare an Environmental Assessment (EA) on the application to license the Normanskill Project. The EA will be issued and circulated for review by all interested parties. All comments filed on the EA will be analyzed by staff and considered in the Commission’s final licensing decision. The application will be processed according to the following schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Commission issues EA .... Comments on EA ............ November 2021.1 December 2021. 1 The Council on Environmental Quality’s (CEQ) regulations under 40 CFR 1501.10(b)(1) require that EAs be completed within 1 year of the federal action agency’s decision to prepare an EA. This notice establishes the Commission’s intent to prepare an EA for the Normanskill Project. Therefore, in accordance with CEQ’s regulations, the EA must be issued within 1 year of the issuance date of this notice. Any questions regarding this notice may be directed to Woohee Choi at (202) 502–6336 or woohee.choi@ ferc.gov. VerDate Sep<11>2014 17:21 Jul 30, 2021 Jkt 253001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER21–2510–000] Aquamarine Westside, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Aquamarine Westside, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is August 16, 2021. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 41469 In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: July 27, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–16414 Filed 7–30–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–478–000] Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on July 21, 2021, Natural Gas Pipeline Company of America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515, filed in the above referenced docket a prior notice pursuant to sections 157.205, 157.206, 157.208(b), and 157.216 of the Commission’s regulations and its blanket certificate issued in Docket No. CP82–402–000 requesting authorization to: (1) Plug and abandon the inactive injection and withdrawal M–2 Well, including associated surface facilities; (2) abandon by removal the related Cathodic Protection System rectifier; (3) abandon in-place approximately 480 feet of the 6inch-diameter M10 Lateral; and (4) abandon by removal the 6-inch-diameter M10 Lateral Valve and the interconnect between the M10 Lateral and the 16inch-diameter M1 Trunkline, all at Natural’s Cairo Mount Simon Storage Field in Louisa County, Iowa. Natural asserts that there will be no impact on the Cairo Mount Simon Storage Field’s certificated parameters, including total E:\FR\FM\02AUN1.SGM 02AUN1 41470 Federal Register / Vol. 86, No. 145 / Monday, August 2, 2021 / Notices gas storage inventory, reservoir pressure, reservoir and buffer boundaries, and certificated capacity. Natural estimates the cost of the project to be approximately $234,000, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application should be directed to Kevin L. Palmer, Director, Regulatory Kinder Morgan, Inc., as operator of Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515–7918, by telephone at (630) 725–3074 or by email at kevin_palmer@kindermorgan.com. Public Participation There are three ways to become involved in the Commission’s review of this project: you can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m. Eastern Time on September 27, 2021. How to file protests, motions to intervene, and comments is explained below. khammond on DSKJM1Z7X2PROD with NOTICES Protests Pursuant to section 157.205 of the Commission’s regulations under the NGA,1 any person 2 or the Commission’s staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for authorization will be considered by the Commission. Protests must comply with the requirements specified in section 157.205(e) of the Commission’s regulations,3 and must be submitted by the protest deadline, which is September 27, 2021. A protest may also serve as a motion to intervene so long as the protestor states it also seeks to be an intervenor. Interventions Any person has the option to file a motion to intervene in this proceeding. Only intervenors have the right to request rehearing of Commission orders issued in this proceeding and to subsequently challenge the Commission’s orders in the U.S. Circuit Courts of Appeal. To intervene, you must submit a motion to intervene to the Commission in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure 4 and the regulations under the NGA 5 by the intervention deadline for the project, which is September 27, 2021. As described further in Rule 214, your motion to intervene must state, to the extent known, your position regarding the proceeding, as well as your interest in the proceeding. For an individual, this could include your status as a landowner, ratepayer, resident of an impacted community, or recreationist. You do not need to have property directly impacted by the project in order to intervene. For more information about motions to intervene, refer to the FERC website at https:// www.ferc.gov/resources/guides/how-to/ intervene.asp. All timely, unopposed motions to intervene are automatically granted by operation of Rule 214(c)(1). Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations. A person obtaining party status will be placed on the service list maintained by 1 18 CFR 157.205. include individuals, organizations, businesses, municipalities, and other entities. 18 CFR 385.102(d). 2 Persons VerDate Sep<11>2014 17:21 Jul 30, 2021 Jkt 253001 PO 00000 3 18 CFR 157.205(e). CFR 385.214. 5 18 CFR 157.10. 4 18 Frm 00038 Fmt 4703 Sfmt 4703 the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. Comments Any person wishing to comment on the project may do so. The Commission considers all comments received about the project in determining the appropriate action to be taken. To ensure that your comments are timely and properly recorded, please submit your comments on or before September 27, 2021. The filing of a comment alone will not serve to make the filer a party to the proceeding. To become a party, you must intervene in the proceeding. How To File Protests, Interventions, and Comments There are two ways to submit protests, motions to intervene, and comments. In both instances, please reference the Project docket number CP21–478–000 in your submission. The Commission encourages electronic filing of submissions. (1) You may file your protest, motion to intervene, and comments by using the Commission’s eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select General’’ and then select ‘‘Protest’’, ‘‘Intervention’’, or ‘‘Comment on a Filing.’’ The Commission’s eFiling staff are available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. (2) You can file a paper copy of your submission. Your submission must reference the Project docket number CP21–478–000. To mail via USPS, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. To mail via any other courier, use the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Protests and motions to intervene must be served on the applicant either by mail or email (with a link to the document) at: kevin_palmer@ kindermorgan.com, 3250 Lacey Road, Suite 700, Downers Grove, Illinois 60515–7918. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be E:\FR\FM\02AUN1.SGM 02AUN1 Federal Register / Vol. 86, No. 145 / Monday, August 2, 2021 / Notices downloaded from the service list at the eService link on FERC Online. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Dated: July 27, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–16422 Filed 7–30–21; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OPP–2017–0750; FRL–8638–01– OCSPP] Pesticide Registration Review; Interim Decision for Paraquat Dichloride; Notice of Availability Environmental Protection Agency (EPA). ACTION: Notice. AGENCY: This document announces the availability of EPA’s interim registration review decision for paraquat dichloride (paraquat). ADDRESSES: The docket for this action, identified by docket identification (ID) number EPA–HQ–OPP–2021–0015, is available online at https:// www.regulations.gov or in person at the SUMMARY: Office of Pesticide Programs Regulatory Public Docket (OPP Docket) in the Environmental Protection Agency Docket Center (EPA/DC), West William Jefferson Clinton Bldg., Rm. 3334, 1301 Constitution Ave. NW, Washington, DC 20460–0001. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566–1744, and the telephone number for the OPP Docket is (703) 305–5805. Please review the visitor instructions and additional information about the docket available at https://www.epa.gov/dockets. Due to the public health concerns related to COVID–19, the EPA Docket Center (EPA/DC) and Reading Room is closed to visitors with limited exceptions. The staff continues to provide remote customer service via email, phone, and webform. For the latest status information on EPA/DC services and docket access, visit https:// www.epa.gov/dockets. FOR FURTHER INFORMATION CONTACT: For technical information contact: The Chemical Review Manager for paraquat identified in the Table in Unit IV. For general information on the registration review program, contact: Melanie Biscoe, Pesticide Re-Evaluation Division (7508P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Ave., NW, Washington, DC 20460–0001; telephone number: (703) 305–7106; email address: biscoe.melanie@epa.gov. SUPPLEMENTARY INFORMATION: I. General Information A. Does this action apply to me? This action is directed to the public in general, and may be of interest to a wide range of stakeholders including environmental, human health, farm worker, and agricultural advocates; the chemical industry; pesticide users; and members of the public interested in the sale, distribution, or use of pesticides. Since others also may be interested, the Agency has not attempted to describe all the specific entities that may be affected by this action. If you have any questions regarding the applicability of this action 41471 to a particular entity, contact the Chemical Review Manager for paraquat identified in the Table in Unit IV. B. What is registration review? Registration review is EPA’s periodic review of pesticide registrations to ensure that each pesticide continues to satisfy the statutory standard for registration, that is, the pesticide can perform its intended function without unreasonable adverse effects on human health or the environment. As part of the registration review process, the Agency has completed proposed interim decisions for all pesticides listed in the Table in Unit IV. Through this program, EPA is ensuring that each pesticide’s registration is based on current scientific and other knowledge, including its effects on human health and the environment. II. Authority EPA is conducting its registration review of the chemicals listed in the Table in Unit IV pursuant to section 3(g) of the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) and the Procedural Regulations for Registration Review at 40 CFR part 155, subpart C. Section 3(g) of FIFRA provides, among other things, that the registrations of pesticides are to be reviewed every 15 years. Under FIFRA, a pesticide product may be registered or remain registered only if it meets the statutory standard for registration given in FIFRA section 3(c)(5) (7 U.S.C. 136a(c)(5)). When used in accordance with widespread and commonly recognized practice, the pesticide product must perform its intended function without unreasonable adverse effects on the environment; that is, without any unreasonable risk to man or the environment, or a human dietary risk from residues that result from the use of a pesticide in or on food. III. What Action is the Agency Taking? Pursuant to 40 CFR 155.58, this notice announces the availability of EPA’s interim registration review decision for paraquat. The interim registration review decision is supported by rationales included in the docket established for each chemical. khammond on DSKJM1Z7X2PROD with NOTICES TABLE 1—REGISTRATION REVIEW INTERIM DECISION BEING ISSUED Chemical Review Manager and Contact Information Registration Review Case Name and Number Docket ID Number Paraquat Dichloride Case Number 0262 .......... EPA–HQ–OPP–2011–0855 ............................. Ana Pinto, pinto.ana@epa.gov 703–347– 8421. The proposed interim registration review decision for paraquat was posted to the docket and the public was invited to submit any comments or new information. EPA addressed the comments or information received VerDate Sep<11>2014 17:21 Jul 30, 2021 Jkt 253001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\02AUN1.SGM 02AUN1

Agencies

[Federal Register Volume 86, Number 145 (Monday, August 2, 2021)]
[Notices]
[Pages 41469-41471]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-16422]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP21-478-000]


Natural Gas Pipeline Company of America LLC; Notice of Request 
Under Blanket Authorization and Establishing Intervention and Protest 
Deadline

    Take notice that on July 21, 2021, Natural Gas Pipeline Company of 
America LLC (Natural), 3250 Lacey Road, Suite 700, Downers Grove, 
Illinois 60515, filed in the above referenced docket a prior notice 
pursuant to sections 157.205, 157.206, 157.208(b), and 157.216 of the 
Commission's regulations and its blanket certificate issued in Docket 
No. CP82-402-000 requesting authorization to: (1) Plug and abandon the 
inactive injection and withdrawal M-2 Well, including associated 
surface facilities; (2) abandon by removal the related Cathodic 
Protection System rectifier; (3) abandon in-place approximately 480 
feet of the 6-inch-diameter M10 Lateral; and (4) abandon by removal the 
6-inch-diameter M10 Lateral Valve and the interconnect between the M10 
Lateral and the 16-inch-diameter M1 Trunkline, all at Natural's Cairo 
Mount Simon Storage Field in Louisa County, Iowa. Natural asserts that 
there will be no impact on the Cairo Mount Simon Storage Field's 
certificated parameters, including total

[[Page 41470]]

gas storage inventory, reservoir pressure, reservoir and buffer 
boundaries, and certificated capacity. Natural estimates the cost of 
the project to be approximately $234,000, all as more fully set forth 
in the request which is on file with the Commission and open to public 
inspection.
    In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact the Federal Energy 
Regulatory Commission at [email protected]ov or call toll-free, 
(886) 208-3676 or TYY, (202) 502-8659.
    Any questions concerning this application should be directed to 
Kevin L. Palmer, Director, Regulatory Kinder Morgan, Inc., as operator 
of Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 
700, Downers Grove, Illinois 60515-7918, by telephone at (630) 725-3074 
or by email at [email protected].

Public Participation

    There are three ways to become involved in the Commission's review 
of this project: you can file a protest to the project, you can file a 
motion to intervene in the proceeding, and you can file comments on the 
project. There is no fee or cost for filing protests, motions to 
intervene, or comments. The deadline for filing protests, motions to 
intervene, and comments is 5:00 p.m. Eastern Time on September 27, 
2021. How to file protests, motions to intervene, and comments is 
explained below.

Protests

    Pursuant to section 157.205 of the Commission's regulations under 
the NGA,\1\ any person \2\ or the Commission's staff may file a protest 
to the request. If no protest is filed within the time allowed or if a 
protest is filed and then withdrawn within 30 days after the allowed 
time for filing a protest, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request for authorization 
will be considered by the Commission.
---------------------------------------------------------------------------

    \1\ 18 CFR 157.205.
    \2\ Persons include individuals, organizations, businesses, 
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------

    Protests must comply with the requirements specified in section 
157.205(e) of the Commission's regulations,\3\ and must be submitted by 
the protest deadline, which is September 27, 2021. A protest may also 
serve as a motion to intervene so long as the protestor states it also 
seeks to be an intervenor.
---------------------------------------------------------------------------

    \3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------

Interventions

    Any person has the option to file a motion to intervene in this 
proceeding. Only intervenors have the right to request rehearing of 
Commission orders issued in this proceeding and to subsequently 
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
    To intervene, you must submit a motion to intervene to the 
Commission in accordance with Rule 214 of the Commission's Rules of 
Practice and Procedure \4\ and the regulations under the NGA \5\ by the 
intervention deadline for the project, which is September 27, 2021. As 
described further in Rule 214, your motion to intervene must state, to 
the extent known, your position regarding the proceeding, as well as 
your interest in the proceeding. For an individual, this could include 
your status as a landowner, ratepayer, resident of an impacted 
community, or recreationist. You do not need to have property directly 
impacted by the project in order to intervene. For more information 
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------

    \4\ 18 CFR 385.214.
    \5\ 18 CFR 157.10.
---------------------------------------------------------------------------

    All timely, unopposed motions to intervene are automatically 
granted by operation of Rule 214(c)(1). Motions to intervene that are 
filed after the intervention deadline are untimely and may be denied. 
Any late-filed motion to intervene must show good cause for being late 
and must explain why the time limitation should be waived and provide 
justification by reference to factors set forth in Rule 214(d) of the 
Commission's Rules and Regulations. A person obtaining party status 
will be placed on the service list maintained by the Secretary of the 
Commission and will receive copies (paper or electronic) of all 
documents filed by the applicant and by all other parties.

Comments

    Any person wishing to comment on the project may do so. The 
Commission considers all comments received about the project in 
determining the appropriate action to be taken. To ensure that your 
comments are timely and properly recorded, please submit your comments 
on or before September 27, 2021. The filing of a comment alone will not 
serve to make the filer a party to the proceeding. To become a party, 
you must intervene in the proceeding.

How To File Protests, Interventions, and Comments

    There are two ways to submit protests, motions to intervene, and 
comments. In both instances, please reference the Project docket number 
CP21-478-000 in your submission. The Commission encourages electronic 
filing of submissions.
    (1) You may file your protest, motion to intervene, and comments by 
using the Commission's eFiling feature, which is located on the 
Commission's website (www.ferc.gov) under the link to Documents and 
Filings. New eFiling users must first create an account by clicking on 
``eRegister.'' You will be asked to select the type of filing you are 
making; first select General'' and then select ``Protest'', 
``Intervention'', or ``Comment on a Filing.''
    The Commission's eFiling staff are available to assist you at (202) 
502-8258 or [email protected]
    (2) You can file a paper copy of your submission. Your submission 
must reference the Project docket number CP21-478-000.
    To mail via USPS, use the following address: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Washington, DC 20426.
    To mail via any other courier, use the following address: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852.
    Protests and motions to intervene must be served on the applicant 
either by mail or email (with a link to the document) at: 
[email protected], 3250 Lacey Road, Suite 700, Downers 
Grove, Illinois 60515-7918. Any subsequent submissions by an intervenor 
must be served on the applicant and all other parties to the 
proceeding. Contact information for parties can be

[[Page 41471]]

downloaded from the service list at the eService link on FERC Online.

Tracking the Proceeding

    Throughout the proceeding, additional information about the project 
will be available from the Commission's Office of External Affairs, at 
(866) 208-FERC, or on the FERC website at www.ferc.gov using the 
``eLibrary'' link as described above. The eLibrary link also provides 
access to the texts of all formal documents issued by the Commission, 
such as orders, notices, and rulemakings.
    In addition, the Commission offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. For more information and to register, go to 
www.ferc.gov/docs-filing/esubscription.asp.

    Dated: July 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-16422 Filed 7-30-21; 8:45 am]
BILLING CODE 6717-01-P