Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement the Lower Santa Cruz River Flood Risk Management Feasibility Study, Pinal County, Arizona, 41028-41029 [2021-16324]
Download as PDF
41028
Federal Register / Vol. 86, No. 144 / Friday, July 30, 2021 / Notices
POLICIES AND PRACTICES FOR RETENTION AND
DISPOSAL OF RECORDS:
System’s sole function is to receive
and integrate data from two or more
other systems and export the resultant
product to yet another independent
system. These records are maintained as
temporary which may be destroyed
upon verification of successful creation
of the final document or file, or when
no longer needed for business use,
whichever is later.
ADMINISTRATIVE, TECHNICAL, AND PHYSICAL
SAFEGUARDS:
lotter on DSK11XQN23PROD with NOTICES1
Individuals seeking access to their
records should follow the procedures in
32 CFR part 310. Individuals should
address written inquiries to the FOIA
Service Center, Defense Information
Systems Agency, ATTN: Headquarters
FOIA Requester Service Center, P.O.
Box 549, Ft. Meade, MD 20755–0549.
Signed, written requests should include
the individual’s full name, current
address, telephone number, and the
name and number of this system of
records notice. In addition, the requester
must provide either a notarized
statement or an unsworn declaration
made in accordance with 28 U.S.C.
1746, in the following format:
If executed outside the United States:
‘‘I declare (or certify, verify, or state)
under penalty of perjury under the laws
of the United States of America that the
foregoing is true and correct. Executed
on (date). (Signature).’’
If executed within the United States,
its territories, possessions, or
commonwealths: ‘‘I declare (or certify,
verify, or state) under penalty of perjury
that the foregoing is true and correct.
Executed on (date). (Signature).’’
CONTESTING RECORD PROCEDURES:
The DoD rules for accessing records,
contesting contents, and appealing
Jkt 253001
cost and complexity for Hurricane and
Storm Damage Reduction.
Antoinette R. Gant,
Colonel, U.S. Army, Division Commander.
Individuals seeking to determine
whether information about themselves
is contained in this system of records
should follow the instructions for
Record Access Procedures above.
[FR Doc. 2021–16327 Filed 7–29–21; 8:45 am]
EXEMPTIONS PROMULGATED FOR THE SYSTEM:
Department of the Army, Corps of
Engineers
None.
December 8, 2010, 75 FR 76428.
[FR Doc. 2021–16304 Filed 7–29–21; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF THE DEFENSE
BILLING CODE 3720–58–P
DEPARTMENT OF THE DEFENSE
Withdrawal of the Notice of Intent To
Prepare an Environmental Impact
Statement the Lower Santa Cruz River
Flood Risk Management Feasibility
Study, Pinal County, Arizona
AGENCY:
ACTION:
Department of the Army, Corps of
Engineers
Withdrawal of the Notice of Intent To
Prepare an Environmental Impact
Statement for the Carpinteria
Shoreline, a Feasibility Study in the
City of Carpinteria, Santa Barbara
County, CA
Army Corps of Engineers, DoD.
Notice of intent; withdrawal.
AGENCY:
ACTION:
The U.S. Army Corps of
Engineers, Los Angeles District,
Planning Division is notifying interested
parties that it has withdrawn the Notice
of Intent (NOI) to develop an
environmental impact statement (EIS)
for the proposed Carpinteria Shoreline
General Investigation (GI) feasibility
study. The original NOI to prepare a EIS
was published in the Federal Register
on September 11, 2003. The proposed
Carpinteria Shoreline GI feasibility
study is being converted to a Continuing
Authority Program (CAP) study.
DATES: The notice of intent to prepare
an EIS published in the Federal Register
on September 11, 2003 (68 FR 53598),
is withdrawn as of July 30, 2021.
ADDRESSES: U.S. Army Corps of
Engineers, Los Angeles District,
Environmental Resources Branch,
(CESPL–PDR), 915 Wilshire Blvd., Suite
930, Los Angeles, CA 90017–3489.
FOR FURTHER INFORMATION CONTACT:
Questions regarding the withdrawal of
this NOI should be addressed to Mr.
Kirk Brus, 213–452–3876, or
kirk.c.brus@usace.army.mil.
SUPPLEMENTARY INFORMATION: Study
efforts in the Carpinteria study area will
be converted to the Continuing
Authorities Program (CAP) Section 103
which addresses projects of limited size,
SUMMARY:
RECORD ACCESS PROCEDURES:
18:01 Jul 29, 2021
NOTIFICATION PROCEDURES:
HISTORY:
Access to the type and amount of data
is governed by privilege management
software and policies developed and
enforced by Federal government
personnel. Data is protected by
repository and interfaces, including, but
not limited to multi-layered firewalls,
Secure Sockets Layer/Transport Layer
Security (SSL/TLS) connections, access
control lists, file system permissions,
intrusion detection and prevention
systems and log monitoring. Complete
access to all records is restricted to and
controlled by certified system
management personnel, who are
responsible for maintaining the IdSS
system integrity and the data
confidentiality. Access to computerized
data is restricted by CAC.
VerDate Sep<11>2014
initial Component determinations are
contained in 32 CFR part 310, or may
be obtained from the system manager.
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Army Corps of Engineers, DoD.
Notice of intent; withdrawal.
The U.S. Army Corps of
Engineers, Los Angeles District is
notifying interested parties that it has
withdrawn the notice of intent (NOI) to
develop an environmental impact
statement (EIS) for the proposed Lower
Santa Cruz River Flood Risk
Management Feasibility Study. The
original NOI to prepare a EIS was
published in the Federal Register on
November 9, 2015. The proposed Lower
Santa Cruz River Flood Risk
Management Feasibility Study is being
converted to a Continuing Authority
Program (CAP) study.
SUMMARY:
The notice of intent to prepare
an EIS published in the Federal Register
on November 9, 2015 (80 FR 69201), is
withdrawn as of July 30, 2021.
DATES:
U.S. Army Corps of
Engineers, Los Angeles District,
Environmental Resources Branch,
(CESPL–PDR), 915 Wilshire Boulevard,
Los Angeles, CA 90017.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Questions regarding the withdrawal of
this NOI should be addressed to Mr.
Kenneth Wong, kenneth.wong@
usace.army.mil, (213) 452–3847.
Pursuant
to the National Environmental Policy
Act (NEPA), the U.S. Army Corps of
Engineers, Los Angeles District, in
partnership with the Pinal County Flood
Control District, intended to prepare an
Integrated Feasibility Report and EIS for
the Lower Santa Cruz River Flood Risk
Management Feasibility Study.
The study’s purpose is to evaluate
methods for minimizing flood risks
along the Lower Santa Cruz River and
its major tributaries within an
approximately 1,400 square mile study
SUPPLEMENTARY INFORMATION:
E:\FR\FM\30JYN1.SGM
30JYN1
Federal Register / Vol. 86, No. 144 / Friday, July 30, 2021 / Notices
area in Pinal County, Arizona. After the
NOI’s publication, the geographic scope
of the study was reduced such that the
study will be converted to a CAP
Section 205 study which address Flood
Risk Management projects of limited
size, cost, and complexity.
Antoinette R. Gant,
Colonel, U.S. Army, Division Commander.
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Dated: July 26, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
Signed in Washington, DC, on July 27,
2021.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
[FR Doc. 2021–16268 Filed 7–29–21; 8:45 am]
[FR Doc. 2021–16273 Filed 7–29–21; 8:45 am]
BILLING CODE 6450–01–P
[FR Doc. 2021–16324 Filed 7–29–21; 8:45 am]
41029
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
BILLING CODE 3720–58–P
Combined Notice of Filings #1
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Basic Energy Sciences Advisory
Committee
Combined Notice of Filings
Office of Science, Department
of Energy.
ACTION: Notice of renewal.
AGENCY:
Pursuant to the Federal
Advisory Committee Act, the Code of
Federal Regulations, and following
consultation with the Committee
Management Secretariat, General
Services Administration, notice is
hereby given that the Basic Energy
Sciences Advisory Committee’s
(BESAC) charter will be renewed for a
two-year period. The Committee will
provide advice and recommendations to
the Office of Science on the Basic
Energy Sciences program. Additionally,
the renewal of the BESAC has been
determined to be essential to conduct
business of the Department of Energy
and to be in the public interest in
connection with the performance of
duties imposed upon the Department of
Energy, by law and agreement. The
Committee will continue to operate in
accordance with the provisions of the
Federal Advisory Committee Act, and
the rules and regulations in
implementation of that Act.
FOR FURTHER INFORMATION CONTACT: Dr.
Linda Horton at (301) 903–3081 or
email: linda.horton@science.doe.gov.
SUMMARY:
lotter on DSK11XQN23PROD with NOTICES1
Signing Authority
This document of the Department of
Energy was signed on July 27, 2021, by
Miles Fernandez, Acting Committee
Management Officer, pursuant to
delegated authority from the Secretary
of Energy. That document with the
original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
VerDate Sep<11>2014
18:01 Jul 29, 2021
Jkt 253001
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: CP21–475–000.
Applicants: NEXUS Gas
Transmission, LLC, and Texas Eastern
Transmission, LP.
Description: Joint Abbreviated
Application of NEXUS Gas
Transmission, LLC, and Texas Eastern
Transmission, LP, for Amendment to
Certificate of Public Convenience and
Necessity and Authorization to
Abandon by Lease.
Filed Date: 7/20/21.
Accession Number: 20210720–5093.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: RP20–1097–002.
Applicants: Dominion Energy Questar
Pipeline, LLC.
Description: Compliance filing
Request for Rejection of Filed Tariff
Records.
Filed Date: 7/22/21.
Accession Number: 20210722–5089.
Comments Due: 5 p.m. ET 8/3/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–204–000.
Applicants: Minco Wind Energy III,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Minco Wind Energy
III, LLC.
Filed Date: 7/26/21.
Accession Number: 20210726–5130.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: EG21–205–000.
Applicants: Crossett Power
Management LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator of Crossett Power
Management LLC.
Filed Date: 7/26/21.
Accession Number: 20210726–5143.
Comments Due: 5 p.m. ET 8/16/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2127–020.
Applicants: Invenergy TN LLC.
Description: Supplement to December
31, 2020 Triennial Market Power
Analysis for the Southeast Region of
Invenergy TN LLC.
Filed Date: 7/21/21.
Accession Number: 20210721–5191.
Comments Due: 5 p.m. ET 8/11/21.
Docket Numbers: ER16–1720–016.
Applicants: Invenergy Energy
Management LLC.
Description: Supplement to December
31, 2020 Triennial Market Power
Analysis for the Southeast Region of
Invenergy Energy Management LL.
Filed Date: 7/21/21.
Accession Number: 20210721–5190.
Comments Due: 5 p.m. ET 8/11/21.
Docket Numbers: ER20–2125–001.
Applicants: WGP Redwood Holdings,
LLC.
Description: Compliance filing:
Compliance Filing Re: Order Accepting
MBR Tariff (ER20–2125–000) to be
effective 7/14/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5061.
E:\FR\FM\30JYN1.SGM
30JYN1
Agencies
[Federal Register Volume 86, Number 144 (Friday, July 30, 2021)]
[Notices]
[Pages 41028-41029]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-16324]
-----------------------------------------------------------------------
DEPARTMENT OF THE DEFENSE
Department of the Army, Corps of Engineers
Withdrawal of the Notice of Intent To Prepare an Environmental
Impact Statement the Lower Santa Cruz River Flood Risk Management
Feasibility Study, Pinal County, Arizona
AGENCY: Army Corps of Engineers, DoD.
ACTION: Notice of intent; withdrawal.
-----------------------------------------------------------------------
SUMMARY: The U.S. Army Corps of Engineers, Los Angeles District is
notifying interested parties that it has withdrawn the notice of intent
(NOI) to develop an environmental impact statement (EIS) for the
proposed Lower Santa Cruz River Flood Risk Management Feasibility
Study. The original NOI to prepare a EIS was published in the Federal
Register on November 9, 2015. The proposed Lower Santa Cruz River Flood
Risk Management Feasibility Study is being converted to a Continuing
Authority Program (CAP) study.
DATES: The notice of intent to prepare an EIS published in the Federal
Register on November 9, 2015 (80 FR 69201), is withdrawn as of July 30,
2021.
ADDRESSES: U.S. Army Corps of Engineers, Los Angeles District,
Environmental Resources Branch, (CESPL-PDR), 915 Wilshire Boulevard,
Los Angeles, CA 90017.
FOR FURTHER INFORMATION CONTACT: Questions regarding the withdrawal of
this NOI should be addressed to Mr. Kenneth Wong,
[email protected], (213) 452-3847.
SUPPLEMENTARY INFORMATION: Pursuant to the National Environmental
Policy Act (NEPA), the U.S. Army Corps of Engineers, Los Angeles
District, in partnership with the Pinal County Flood Control District,
intended to prepare an Integrated Feasibility Report and EIS for the
Lower Santa Cruz River Flood Risk Management Feasibility Study.
The study's purpose is to evaluate methods for minimizing flood
risks along the Lower Santa Cruz River and its major tributaries within
an approximately 1,400 square mile study
[[Page 41029]]
area in Pinal County, Arizona. After the NOI's publication, the
geographic scope of the study was reduced such that the study will be
converted to a CAP Section 205 study which address Flood Risk
Management projects of limited size, cost, and complexity.
Antoinette R. Gant,
Colonel, U.S. Army, Division Commander.
[FR Doc. 2021-16324 Filed 7-29-21; 8:45 am]
BILLING CODE 3720-58-P