Notice of Amendment Application To Incorporate Species Protection Plan Into The Project Licenses and Soliciting Comments, Motions To Intervene, and Protests, 41030-41031 [2021-16269]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 41030 Federal Register / Vol. 86, No. 144 / Friday, July 30, 2021 / Notices Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–1006–001. Applicants: El Paso Electric Company. Description: Tariff Amendment: Service Agreement No. 347, Nonconforming LGIA with Hecate to be effective 1/7/2021. Filed Date: 7/26/21. Accession Number: 20210726–5076. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–1007–001. Applicants: El Paso Electric Company. Description: Tariff Amendment: Service Agreement No. 348, Nonconforming LGIA with Hecate 2 to be effective 1/7/2021. Filed Date: 7/26/21. Accession Number: 20210726–5081. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–1973–001. Applicants: PacifiCorp. Description: Compliance filing: BPA NITSA (Clark PUD) Rev 3 Compliance to be effective 5/1/2021. Filed Date: 7/26/21. Accession Number: 20210726–5100. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2092–001. Applicants: Pacific Gas and Electric Company. Description: Tariff Amendment: Amendment to Berry Petroleum Tannehill Cogen SGIA (SA 413) to be effective 6/8/2021. Filed Date: 7/26/21. Accession Number: 20210726–5079. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2093–001. Applicants: Pacific Gas and Electric Company. Description: Tariff Amendment: Amendment to Berry Petroleum University Cogen LGIA (SA 414) to be effective 6/8/2021. Filed Date: 7/26/21. Accession Number: 20210726–5080. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2498–000. Applicants: Versant Power. Description: Compliance filing: Order No. 676–I Compliance Filing and Request for Waivers to be effective 10/ 27/2021. Filed Date: 7/23/21. Accession Number: 20210723–5184. Comments Due: 5 p.m. ET 8/13/21. Docket Numbers: ER21–2499–000. Applicants: Duke Energy Progress, LLC, Duke Energy Florida, LLC, Duke Energy Carolinas, LLC. Description: Compliance filing: Duke Energy—Order 676–I Compliance Filing to be effective 12/31/9998. Filed Date: 7/23/21. Accession Number: 20210723–5192. Comments Due: 5 p.m. ET 8/13/21. Docket Numbers: ER21–2501–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to WMPA, Service Agreement No. 4794; Queue No. AC1– 116 to be effective 8/22/2017. Filed Date: 7/26/21. Accession Number: 20210726–5036. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2502–000. Applicants: Performance Materials NA, Inc. Description: Compliance filing: Revisions to Market-Based Rate Tariff to be effective 9/24/2021. Filed Date: 7/26/21. Accession Number: 20210726–5039. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2503–000. Applicants: Alabama Power Company. Description: § 205(d) Rate Filing: Hobnail Solar LGIA Amendment Filing to be effective 7/12/2021. Filed Date: 7/26/21. Accession Number: 20210726–5086. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2504–000. Applicants: Alabama Power Company. Description: Tariff Cancellation: Randolph County Solar LGIA Termination Filing to be effective 7/26/ 2021. Filed Date: 7/26/21. Accession Number: 20210726–5089. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2505–000. Applicants: Basin Electric Power Cooperative. Description: Tariff Cancellation: Basin Electric Notice of Cancellation for Service Agreement No. 32 to be effective 2/24/2021. Filed Date: 7/26/21. Accession Number: 20210726–5116. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2506–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, Service Agreement No. 6111; Queue No. AD1–016 to be effective 6/25/2021. Filed Date: 7/26/21. Accession Number: 20210726–5126. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2507–000. Applicants: Basin Electric Power Cooperative. Description: § 205(d) Rate Filing: Submission of Amendment to Service Agreement No. 100 to be effective 5/11/ 2021. Filed Date: 7/26/21. Accession Number: 20210726–5138. Comments Due: 5 p.m. ET 8/16/21. Docket Numbers: ER21–2508–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, Service Agreement No. 6114; Queue No. AD1–129 to be effective 6/25/2021. Filed Date: 7/26/21. Accession Number: 20210726–5140. Comments Due: 5 p.m. ET 8/16/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 26, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–16270 Filed 7–29–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Amendment Application To Incorporate Species Protection Plan Into The Project Licenses and Soliciting Comments, Motions To Intervene, and Protests Brookfield White Pine Hydro, LLC .............................................................................................................................. Merimil Limited Partnership ........................................................................................................................................ Hydro-Kennebec, LLC ................................................................................................................................................... VerDate Sep<11>2014 22:10 Jul 29, 2021 Jkt 253001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\30JYN1.SGM 30JYN1 Project No. 2325–100. Project No. 2574–092. Project No. 2611–091. lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 86, No. 144 / Friday, July 30, 2021 / Notices Take notice that the following amendment application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of Licenses. b. Project Nos: P–2325–100; P–2574– 092; P–2611–091. c. Date Filed: June 1, 2021. d. Applicants: Brookfield White Pine Hydro, LLC; Merimil Limited Partnership; Hydro-Kennebec, LLC. e. Name of Projects: Weston, Lockwood, and Hydro-Kennebec Hydroelectric Projects. f. Locations: The projects are located on the lower Kennebec River in Kennebec and Somerset Counties, Maine. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Kelly Maloney, Licensing and Compliance Manager, Brookfield White Pine Hydro, LLC, 150 Main Street, Lewiston, ME 04240; telephone: (207) 755–5605. i. FERC Contact: Marybeth Gay, (202) 502–6125, Marybeth.Gay@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: August 25, 2021. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket numbers P–2325–100, P–2574–092, and P–2611–091. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the VerDate Sep<11>2014 17:24 Jul 29, 2021 Jkt 253001 official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Brookfield Power US Asset Management, LLC (Brookfield), on behalf of the affiliated licensees for the Lockwood (P–2574), Hydro-Kennebec (P–2611), and Weston (P–2325) Projects, requests Commission approval to amend the project licenses to incorporate the provisions of a Species Protection Plan for Atlantic salmon, Atlantic sturgeon, and shortnose sturgeon (Final Plan). The Final Plan identifies proposed upstream and downstream fish passage measures, as well as monitoring and management measures designed to avoid or minimize the potential adverse effects of continued operation of the projects on endangered Atlantic salmon, threatened Atlantic sturgeon, and endangered shortnose sturgeon, and the designated critical habitat for Atlantic salmon and Atlantic sturgeon. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 41031 o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: July 26, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–16269 Filed 7–29–21; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9057–6] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/nepa. Weekly receipt of Environmental Impact Statements (EIS) Filed July 19, 2021 10 a.m. EST Through July 26, 2021 10 a.m. EST Pursuant to 40 CFR 1506.9. Notice: Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20210101, Final, NOAA, HI, Enhancing Protections for Hawaiian Spinner Dolphins to Prevent Disturbance, Review Period Ends: 08/ 30/2021, Contact: Kevin Brindock 808–725–5146. EIS No. 20210102, Draft Supplement, FERC, PA, Atlantic Coast Pipeline and Supply Header Project, Comment Period Ends: 09/13/2021, Contact: Office of External Affairs 866–208– 3372. EIS No. 20210103, Draft, FTA, CA, West Santa Ana Branch Transit Corridor Project Draft Environmental Impact E:\FR\FM\30JYN1.SGM 30JYN1

Agencies

[Federal Register Volume 86, Number 144 (Friday, July 30, 2021)]
[Notices]
[Pages 41030-41031]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-16269]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Amendment Application To Incorporate Species Protection 
Plan Into The Project Licenses and Soliciting Comments, Motions To 
Intervene, and Protests

 
 
 
Brookfield White Pine Hydro, LLC.  Project No. 2325-100.
Merimil Limited Partnership......  Project No. 2574-092.
Hydro-Kennebec, LLC..............  Project No. 2611-091.
 


[[Page 41031]]

    Take notice that the following amendment application has been filed 
with the Commission and is available for public inspection:
    a. Application Type: Amendment of Licenses.
    b. Project Nos: P-2325-100; P-2574-092; P-2611-091.
    c. Date Filed: June 1, 2021.
    d. Applicants: Brookfield White Pine Hydro, LLC; Merimil Limited 
Partnership; Hydro-Kennebec, LLC.
    e. Name of Projects: Weston, Lockwood, and Hydro-Kennebec 
Hydroelectric Projects.
    f. Locations: The projects are located on the lower Kennebec River 
in Kennebec and Somerset Counties, Maine.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Kelly Maloney, Licensing and Compliance 
Manager, Brookfield White Pine Hydro, LLC, 150 Main Street, Lewiston, 
ME 04240; telephone: (207) 755-5605.
    i. FERC Contact: Marybeth Gay, (202) 502-6125, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: August 25, 2021.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include docket numbers P-2325-100, P-2574-092, and P-2611-091. Comments 
emailed to Commission staff are not considered part of the Commission 
record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: Brookfield Power US Asset Management, 
LLC (Brookfield), on behalf of the affiliated licensees for the 
Lockwood (P-2574), Hydro-Kennebec (P-2611), and Weston (P-2325) 
Projects, requests Commission approval to amend the project licenses to 
incorporate the provisions of a Species Protection Plan for Atlantic 
salmon, Atlantic sturgeon, and shortnose sturgeon (Final Plan). The 
Final Plan identifies proposed upstream and downstream fish passage 
measures, as well as monitoring and management measures designed to 
avoid or minimize the potential adverse effects of continued operation 
of the projects on endangered Atlantic salmon, threatened Atlantic 
sturgeon, and endangered shortnose sturgeon, and the designated 
critical habitat for Atlantic salmon and Atlantic sturgeon.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: July 26, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-16269 Filed 7-29-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.