Notice of Amendment Application To Incorporate Species Protection Plan Into The Project Licenses and Soliciting Comments, Motions To Intervene, and Protests, 41030-41031 [2021-16269]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
41030
Federal Register / Vol. 86, No. 144 / Friday, July 30, 2021 / Notices
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–1006–001.
Applicants: El Paso Electric Company.
Description: Tariff Amendment:
Service Agreement No. 347,
Nonconforming LGIA with Hecate to be
effective 1/7/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5076.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–1007–001.
Applicants: El Paso Electric Company.
Description: Tariff Amendment:
Service Agreement No. 348,
Nonconforming LGIA with Hecate 2 to
be effective 1/7/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5081.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–1973–001.
Applicants: PacifiCorp.
Description: Compliance filing: BPA
NITSA (Clark PUD) Rev 3 Compliance
to be effective 5/1/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5100.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2092–001.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment:
Amendment to Berry Petroleum
Tannehill Cogen SGIA (SA 413) to be
effective 6/8/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5079.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2093–001.
Applicants: Pacific Gas and Electric
Company.
Description: Tariff Amendment:
Amendment to Berry Petroleum
University Cogen LGIA (SA 414) to be
effective 6/8/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5080.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2498–000.
Applicants: Versant Power.
Description: Compliance filing: Order
No. 676–I Compliance Filing and
Request for Waivers to be effective 10/
27/2021.
Filed Date: 7/23/21.
Accession Number: 20210723–5184.
Comments Due: 5 p.m. ET 8/13/21.
Docket Numbers: ER21–2499–000.
Applicants: Duke Energy Progress,
LLC, Duke Energy Florida, LLC, Duke
Energy Carolinas, LLC.
Description: Compliance filing: Duke
Energy—Order 676–I Compliance Filing
to be effective 12/31/9998.
Filed Date: 7/23/21.
Accession Number: 20210723–5192.
Comments Due: 5 p.m. ET 8/13/21.
Docket Numbers: ER21–2501–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to WMPA, Service
Agreement No. 4794; Queue No. AC1–
116 to be effective 8/22/2017.
Filed Date: 7/26/21.
Accession Number: 20210726–5036.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2502–000.
Applicants: Performance Materials
NA, Inc.
Description: Compliance filing:
Revisions to Market-Based Rate Tariff to
be effective 9/24/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5039.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2503–000.
Applicants: Alabama Power
Company.
Description: § 205(d) Rate Filing:
Hobnail Solar LGIA Amendment Filing
to be effective 7/12/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5086.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2504–000.
Applicants: Alabama Power
Company.
Description: Tariff Cancellation:
Randolph County Solar LGIA
Termination Filing to be effective 7/26/
2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5089.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2505–000.
Applicants: Basin Electric Power
Cooperative.
Description: Tariff Cancellation: Basin
Electric Notice of Cancellation for
Service Agreement No. 32 to be effective
2/24/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5116.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2506–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
6111; Queue No. AD1–016 to be
effective 6/25/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5126.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2507–000.
Applicants: Basin Electric Power
Cooperative.
Description: § 205(d) Rate Filing:
Submission of Amendment to Service
Agreement No. 100 to be effective 5/11/
2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5138.
Comments Due: 5 p.m. ET 8/16/21.
Docket Numbers: ER21–2508–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
6114; Queue No. AD1–129 to be
effective 6/25/2021.
Filed Date: 7/26/21.
Accession Number: 20210726–5140.
Comments Due: 5 p.m. ET 8/16/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 26, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–16270 Filed 7–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Amendment Application To
Incorporate Species Protection Plan
Into The Project Licenses and
Soliciting Comments, Motions To
Intervene, and Protests
Brookfield White Pine Hydro, LLC ..............................................................................................................................
Merimil Limited Partnership ........................................................................................................................................
Hydro-Kennebec, LLC ...................................................................................................................................................
VerDate Sep<11>2014
22:10 Jul 29, 2021
Jkt 253001
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
E:\FR\FM\30JYN1.SGM
30JYN1
Project No. 2325–100.
Project No. 2574–092.
Project No. 2611–091.
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 86, No. 144 / Friday, July 30, 2021 / Notices
Take notice that the following
amendment application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
Licenses.
b. Project Nos: P–2325–100; P–2574–
092; P–2611–091.
c. Date Filed: June 1, 2021.
d. Applicants: Brookfield White Pine
Hydro, LLC; Merimil Limited
Partnership; Hydro-Kennebec, LLC.
e. Name of Projects: Weston,
Lockwood, and Hydro-Kennebec
Hydroelectric Projects.
f. Locations: The projects are located
on the lower Kennebec River in
Kennebec and Somerset Counties,
Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Kelly Maloney,
Licensing and Compliance Manager,
Brookfield White Pine Hydro, LLC, 150
Main Street, Lewiston, ME 04240;
telephone: (207) 755–5605.
i. FERC Contact: Marybeth Gay, (202)
502–6125, Marybeth.Gay@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
August 25, 2021.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
numbers P–2325–100, P–2574–092, and
P–2611–091. Comments emailed to
Commission staff are not considered
part of the Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
VerDate Sep<11>2014
17:24 Jul 29, 2021
Jkt 253001
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Brookfield
Power US Asset Management, LLC
(Brookfield), on behalf of the affiliated
licensees for the Lockwood (P–2574),
Hydro-Kennebec (P–2611), and Weston
(P–2325) Projects, requests Commission
approval to amend the project licenses
to incorporate the provisions of a
Species Protection Plan for Atlantic
salmon, Atlantic sturgeon, and
shortnose sturgeon (Final Plan). The
Final Plan identifies proposed upstream
and downstream fish passage measures,
as well as monitoring and management
measures designed to avoid or minimize
the potential adverse effects of
continued operation of the projects on
endangered Atlantic salmon, threatened
Atlantic sturgeon, and endangered
shortnose sturgeon, and the designated
critical habitat for Atlantic salmon and
Atlantic sturgeon.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
41031
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: July 26, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–16269 Filed 7–29–21; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9057–6]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental
Impact Statements (EIS)
Filed July 19, 2021 10 a.m. EST Through
July 26, 2021 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air
Act requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20210101, Final, NOAA, HI,
Enhancing Protections for Hawaiian
Spinner Dolphins to Prevent
Disturbance, Review Period Ends: 08/
30/2021, Contact: Kevin Brindock
808–725–5146.
EIS No. 20210102, Draft Supplement,
FERC, PA, Atlantic Coast Pipeline and
Supply Header Project, Comment
Period Ends: 09/13/2021, Contact:
Office of External Affairs 866–208–
3372.
EIS No. 20210103, Draft, FTA, CA, West
Santa Ana Branch Transit Corridor
Project Draft Environmental Impact
E:\FR\FM\30JYN1.SGM
30JYN1
Agencies
[Federal Register Volume 86, Number 144 (Friday, July 30, 2021)]
[Notices]
[Pages 41030-41031]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-16269]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Amendment Application To Incorporate Species Protection
Plan Into The Project Licenses and Soliciting Comments, Motions To
Intervene, and Protests
Brookfield White Pine Hydro, LLC. Project No. 2325-100.
Merimil Limited Partnership...... Project No. 2574-092.
Hydro-Kennebec, LLC.............. Project No. 2611-091.
[[Page 41031]]
Take notice that the following amendment application has been filed
with the Commission and is available for public inspection:
a. Application Type: Amendment of Licenses.
b. Project Nos: P-2325-100; P-2574-092; P-2611-091.
c. Date Filed: June 1, 2021.
d. Applicants: Brookfield White Pine Hydro, LLC; Merimil Limited
Partnership; Hydro-Kennebec, LLC.
e. Name of Projects: Weston, Lockwood, and Hydro-Kennebec
Hydroelectric Projects.
f. Locations: The projects are located on the lower Kennebec River
in Kennebec and Somerset Counties, Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Kelly Maloney, Licensing and Compliance
Manager, Brookfield White Pine Hydro, LLC, 150 Main Street, Lewiston,
ME 04240; telephone: (207) 755-5605.
i. FERC Contact: Marybeth Gay, (202) 502-6125,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: August 25, 2021.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include docket numbers P-2325-100, P-2574-092, and P-2611-091. Comments
emailed to Commission staff are not considered part of the Commission
record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: Brookfield Power US Asset Management,
LLC (Brookfield), on behalf of the affiliated licensees for the
Lockwood (P-2574), Hydro-Kennebec (P-2611), and Weston (P-2325)
Projects, requests Commission approval to amend the project licenses to
incorporate the provisions of a Species Protection Plan for Atlantic
salmon, Atlantic sturgeon, and shortnose sturgeon (Final Plan). The
Final Plan identifies proposed upstream and downstream fish passage
measures, as well as monitoring and management measures designed to
avoid or minimize the potential adverse effects of continued operation
of the projects on endangered Atlantic salmon, threatened Atlantic
sturgeon, and endangered shortnose sturgeon, and the designated
critical habitat for Atlantic salmon and Atlantic sturgeon.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: July 26, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-16269 Filed 7-29-21; 8:45 am]
BILLING CODE 6717-01-P