Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 40822-40823 [2021-16165]
Download as PDF
40822
Federal Register / Vol. 86, No. 143 / Thursday, July 29, 2021 / Notices
Federal Energy Regulatory
Commission
Street, Suite 1300, Houston, Texas
77002–2700, by phone at (832) 320–
5477 or by email at david_alonzo@
tcenergy.com.
[Docket No. CP21–473–000]
Public Participation
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on September 21, 2021.
How to file protests, motions to
intervene, and comments is explained
below.
jbell on DSKJLSW7X2PROD with NOTICES
DEPARTMENT OF ENERGY
Take notice that on July 16, 2021,
Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
1300, Houston, Texas 77002–2700, filed
in the above referenced docket a prior
notice pursuant to sections 157.205 and
157.213 of the Commission’s regulations
under the Natural Gas Act (NGA) and its
blanket certificate issued in Docket No.
CP83–76–000 requesting authorization
to construct and operate: (1) Two
injection/withdrawal (I/W) wells at its
Lucas Storage Field; (2) one I/W well at
its Pavonia Storage Field; and (3) related
pipeline and appurtenances for each
well, all located in Ashland and
Richland Counties, Ohio. Columbia
states that the new wells are designed to
maintain reliability and overall storage
field performance. Columbia asserts that
there will be no change to either storage
field’s certificated physical parameters,
including total inventory reservoir
pressure, reservoir and buffer
boundaries, and certificated capacity.
Columbia estimates the cost of the
project to be approximately $15 million,
all as more fully set forth in the request
which is on file with the Commission
and open to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application should be directed to David
A. Alonzo, Manager, Project
Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana
VerDate Sep<11>2014
19:19 Jul 28, 2021
Jkt 253001
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is
September 21, 2021. A protest may also
serve as a motion to intervene so long
as the protestor states it also seeks to be
an intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
3 18 CFR 157.205(e).
4 18 CFR 385.214.
PO 00000
1 18
2 Persons
Frm 00021
Fmt 4703
Sfmt 4703
the NGA 5 by the intervention deadline
for the project, which is September 21,
2021. As described further in Rule 214,
your motion to intervene must state, to
the extent known, your position
regarding the proceeding, as well as
your interest in the proceeding. For an
individual, this could include your
status as a landowner, ratepayer,
resident of an impacted community, or
recreationist. You do not need to have
property directly impacted by the
project in order to intervene. For more
information about motions to intervene,
refer to the FERC website at https://
www.ferc.gov/resources/guides/how-to/
intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before September
21, 2021. The filing of a comment alone
will not serve to make the filer a party
to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP21–473–000 in your submission. The
Commission encourages electronic filing
of submissions.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
5 18
E:\FR\FM\29JYN1.SGM
CFR 157.10.
29JYN1
Federal Register / Vol. 86, No. 143 / Thursday, July 29, 2021 / Notices
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing.’’
The Commission’s eFiling staff are
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
(2) You can file a paper copy of your
submission. Your submission must
reference the Project docket number
CP21–473–000.
To mail via USPS, use the following
address: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
To mail via any other courier, use the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Protests and motions to intervene
must be served on the applicant either
by mail or email (with a link to the
document) at: david_alonzo@
tcenergy.com, 700 Louisiana Street,
Suite 1300, Houston, Texas 77002–2700.
Any subsequent submissions by an
intervenor must be served on the
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
jbell on DSKJLSW7X2PROD with NOTICES
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: July 23, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–16165 Filed 7–28–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:19 Jul 28, 2021
Jkt 253001
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8756–01–R6]
Clean Air Act Operating Permit
Program; Petitions for Objection to
State Operating Permit for Sandy
Creek Services LLC, Sandy Creek
Energy Station, Brazoria County,
Texas
Environmental Protection
Agency (EPA).
ACTION: Notice of final order on petition
for objection to Clean Air Act title V
operating permit.
AGENCY:
The Environmental Protection
Agency (EPA) Administrator signed an
Order dated June 30, 2021, granting a
Petition dated January 16, 2018 from the
Environmental Integrity Project and
Sierra Club. The Petition requested that
the EPA object to a Clean Air Act (CAA)
title V operating permit issued by the
Texas Commission on Environmental
Quality (TCEQ) to Sandy Creek Services
LLC (Sandy Creek) for its Sandy Creek
Energy Station located in McLennan
County, Texas.
ADDRESSES: The EPA requests that you
contact the individual listed in the FOR
FURTHER INFORMATION CONTACT section to
view copies of the final Order, the
Petition, and other supporting
information. Out of an abundance of
caution for members of the public and
our staff, the EPA Region 6 office is
currently closed to the public to reduce
the risk of transmitting COVID–19.
Please call or email the contact listed
below if you need alternative access to
the final Order and Petition, which are
available electronically at: https://
www.epa.gov/title-v-operating-permits/
title-v-petition-database.
FOR FURTHER INFORMATION CONTACT:
Aimee Wilson, EPA Region 6 Office, Air
Permits Section, (214) 665–7596,
wilson.aimee@epa.gov.
SUPPLEMENTARY INFORMATION: The CAA
affords EPA a 45-day period to review
and object to, as appropriate, operating
permits proposed by state permitting
authorities under title V of the CAA.
Section 505(b)(2) of the CAA authorizes
any person to petition the EPA
Administrator to object to a title V
operating permit within 60 days after
the expiration of the EPA’s 45-day
review period if the EPA has not
objected on its own initiative. Petitions
must be based only on objections to the
permit that were raised with reasonable
specificity during the public comment
period provided by the state, unless the
petitioner demonstrates that it was
impracticable to raise these issues
SUMMARY:
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
40823
during the comment period or unless
the grounds for the issue arose after this
period.
The EPA received the Petition from
the Environmental Integrity Project and
Sierra Club dated January 16, 2018,
requesting that the EPA object to the
issuance of operating permit no. O3336,
issued by TCEQ to the Sandy Creek
Energy Station in McLennan County,
Texas. The Petition claims the proposed
permit failed to incorporate certified
permits by rule (PBR) registrations as
applicable requirements, and fails to
include monitoring, recordkeeping, and
reporting requirements that assure
compliance with incorporated PBRs.
On June 30, 2021, the EPA
Administrator issued an Order granting
the Petition. The Order explains the
basis for EPA’s decision.
Dated: July 22, 2021.
David Garcia,
Director, Air and Radiation Division,
Region 6.
[FR Doc. 2021–16206 Filed 7–28–21; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2008–0719; FRL–8774–01–
OW]
Proposed Information Collection
Request; Comment Request; National
Pollutant Discharge Elimination
System Program (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) is planning to submit the
‘‘Information Collection Request (ICR)
Supporting Statement for The National
Pollutant Discharge Elimination System
Program (Renewal)’’ (EPA ICR No.
0229.25, OMB Control No. 2040–0004)
to the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. Before doing so, EPA is
soliciting public comments on specific
aspects of the proposed information
collection as described below. This is a
proposed extension of the ICR, which is
currently approved through March 31,
2022. An Agency may not conduct or
sponsor, and a person is not required to,
respond to a collection of information
unless it displays a currently valid OMB
control number.
DATES: Comments must be submitted on
or before September 27, 2021.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
SUMMARY:
E:\FR\FM\29JYN1.SGM
29JYN1
Agencies
[Federal Register Volume 86, Number 143 (Thursday, July 29, 2021)]
[Notices]
[Pages 40822-40823]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-16165]
[[Page 40822]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-473-000]
Columbia Gas Transmission, LLC; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on July 16, 2021, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite 1300, Houston, Texas 77002-
2700, filed in the above referenced docket a prior notice pursuant to
sections 157.205 and 157.213 of the Commission's regulations under the
Natural Gas Act (NGA) and its blanket certificate issued in Docket No.
CP83-76-000 requesting authorization to construct and operate: (1) Two
injection/withdrawal (I/W) wells at its Lucas Storage Field; (2) one I/
W well at its Pavonia Storage Field; and (3) related pipeline and
appurtenances for each well, all located in Ashland and Richland
Counties, Ohio. Columbia states that the new wells are designed to
maintain reliability and overall storage field performance. Columbia
asserts that there will be no change to either storage field's
certificated physical parameters, including total inventory reservoir
pressure, reservoir and buffer boundaries, and certificated capacity.
Columbia estimates the cost of the project to be approximately $15
million, all as more fully set forth in the request which is on file
with the Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at [email protected] or call toll-free,
(886) 208-3676 or TYY, (202) 502-8659.
Any questions concerning this application should be directed to
David A. Alonzo, Manager, Project Authorizations, Columbia Gas
Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas
77002-2700, by phone at (832) 320-5477 or by email at
[email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: You can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on September 21,
2021. How to file protests, motions to intervene, and comments is
explained below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the allowed
time for filing a protest, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request for authorization
will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is September 21, 2021. A protest may also
serve as a motion to intervene so long as the protestor states it also
seeks to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is September 21, 2021. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before September 21, 2021. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP21-473-000 in your submission. The Commission encourages electronic
filing of submissions.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be
[[Page 40823]]
asked to select the type of filing you are making; first select
General'' and then select ``Protest'', ``Intervention'', or ``Comment
on a Filing.''
The Commission's eFiling staff are available to assist you at (202)
502-8258 or [email protected]
(2) You can file a paper copy of your submission. Your submission
must reference the Project docket number CP21-473-000.
To mail via USPS, use the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street NE,
Washington, DC 20426.
To mail via any other courier, use the following address: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
Protests and motions to intervene must be served on the applicant
either by mail or email (with a link to the document) at:
[email protected], 700 Louisiana Street, Suite 1300, Houston,
Texas 77002-2700. Any subsequent submissions by an intervenor must be
served on the applicant and all other parties to the proceeding.
Contact information for parties can be downloaded from the service list
at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: July 23, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-16165 Filed 7-28-21; 8:45 am]