Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 38703-38704 [2021-15541]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 86, No. 138 / Thursday, July 22, 2021 / Notices
prospective customers about extending
retail service to new customer[s] in
Canadian waters, North Star discovered
it did not have the necessary
authorization’’ to export power to
customers in Canada. Id. at 2–3. North
Star, via its power supplier, found that
it did not hold a required Presidential
Permit. See id. at 3. North Star has
represented that it ‘‘was not aware of the
requirement to have either a
Presidential permit or export
authorization.’’ Id. North Star has
further represented that ‘‘[a]s soon as it
became aware of [the] requirements, [it]
contacted counsel to determine
appropriate remedial actions, including
filing the necessary applications and
obtaining the required permit(s) and
authorization.’’ Id. Accordingly, the
Applicant has submitted this
application for export and,
concurrently, submitted an application
for a Presidential Permit.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
Application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedure (18 CFR
385.211). Any person desiring to
become a party to this proceeding
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214).
Comments and other filings
concerning North Star’s application to
export electric energy to Canada should
be clearly marked with OE Docket No.
EA–489. Additional copies are to be
provided directly to Daniel E. Frank,
700 Sixth St. NW, Suite 700,
Washington, DC 20001–3980,
danielfrank@eversheds-sutherland.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the U.S. electric power supply system.
Copies of the Application will be
made available, upon request, by
accessing the program website at https://
energy.gov/node/11845, or by emailing
Matt Aronoff at matthew.aronoff@
hq.doe.gov.
VerDate Sep<11>2014
17:10 Jul 21, 2021
Jkt 253001
Signed in Washington, DC, on July 19,
2021.
Christopher Lawrence,
Management and Program Analyst, Energy
Resilience Division, Office of Electricity.
[FR Doc. 2021–15596 Filed 7–21–21; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2310–243]
Pacific Gas and Electric Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Temporary
variance of license requirement.
b. Project No.: 2310–243.
c. Date Filed: July 8, 2021 and
supplemented on July 14, 2021.
d. Applicant: Pacific Gas and Electric
Company (licensee).
e. Name of Project: Drum-Spaulding
Project.
f. Location: South Yuba River and
Bear River in Placer and Nevada
counties, California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Michelle
Ocken, License Coordinator, Pacific Gas
and Electric Company, (530) 863–3439.
i. FERC Contact: Robert Ballantine,
(202) 502–6289, robert.ballantine@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 20
days from the issuance of this notice by
the Commission (August 4, 2021).
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
38703
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. The first page of
any filing should include docket
number P–2310–243. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Due to
persistent drought conditions, the
licensee requests Commission approval
of a temporary variance of the minimum
flow requirement at streamflow gage
YB–292 (Mormon Ravine). The licensee
is requesting to decrease the target flow
from an instantaneous 5 cubic feet per
second (cfs) to 3 cfs, measured as a 24hour average. The reduced flow is
necessary to manage water resources in
association with Placer County Water
Agency and license required flows. If
granted, the variance would last through
October 1, 2021, or until adequate
precipitation occurs to ensure that
inflow equals outflow at the referenced
reservoir for at least seven consecutive
days, whichever comes later.
l. Locations of the Application: The
Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Agencies may obtain copies of the
application directly from the applicant.
At this time, the Commission has
suspended access to the Commission’s
Public Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
E:\FR\FM\22JYN1.SGM
22JYN1
38704
Federal Register / Vol. 86, No. 138 / Thursday, July 22, 2021 / Notices
FERCOnlineSupport@ferc.gov or call
toll free, (866) 208–3676 or TTY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. A copy of all other filings in
reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with
385.2010.
Dated: July 15, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–15541 Filed 7–21–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSK11XQN23PROD with NOTICES1
[Docket No. IC21–22–000]
Commission Information Collection
Activities (FERC–585); Comment
Request; Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:
VerDate Sep<11>2014
17:10 Jul 21, 2021
Jkt 253001
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on a renewal of
currently approved information
collection, FERC–585 (Reporting of
Electric Energy Shortages and
Contingency Plans Under PURPA 1
Section 206), which will be submitted to
the Office of Management and Budget
(OMB) for review.
DATES: Comments on the collection of
information are due August 23, 2021.
ADDRESSES: Send written comments on
FERC–585 to OMB through
www.reginfo.gov/public/do/PRAMain.
Attention: Federal Energy Regulatory
Commission Desk Officer. Please
identify the OMB Control Number
(1902–0138) in the subject line of your
comments. Comments should be sent
within 30 days of publication of this
notice to www.reginfo.gov/public/do/
PRAMain.
Please submit copies of your
comments to the Commission. You may
submit copies of your comments
(identified by Docket No. IC21–22–000)
by one of the following methods:
Electronic filing through https://
www.ferc.gov, is preferred.
• Electronic Filing: Documents must
be filed in acceptable native
applications and print-to-PDF, but not
in scanned or picture format.
• For those unable to file
electronically, comments may be filed
by USPS mail or by hand (including
courier) delivery.
Æ Mail via U.S. Postal Service Only:
Addressed to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (Including Courier) Delivery:
Deliver to: Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Instructions: OMB submissions must
be formatted and filed in accordance
with submission guidelines at
www.reginfo.gov/public/do/PRAMain.
Using the search function under the
‘‘Currently Under Review’’ field, select
Federal Energy Regulatory Commission;
click ‘‘submit,’’ and select ‘‘comment’’
to the right of the subject collection.
FERC submissions must be formatted
and filed in accordance with submission
guidelines at: https://www.ferc.gov. For
user assistance, contact FERC Online
Support by email at ferconlinesupport@
SUMMARY:
1 PURPA = Public Utility Regulatory Policies Act
of 1979 (Pub. L. 95–617, 92 Stat. 3117), enacted 11/
9/1978.
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
ferc.gov, or by phone at: (866) 208–3676
(toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/ferconline/overview.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
Title: FERC–585 (Reporting of Electric
Energy Shortages and Contingency
Plans Under PURPA 2 Section 206).
OMB Control No.: 1902–0138
Type of Request: Three-year extension
of the FERC–585 information collection
requirements with no changes to the
current reporting requirements.
Abstract: The Commission uses the
information collected under the
requirements of FERC–585 to
implement the statutory provisions of
Section 206 of PURPA. Section 206 of
PURPA amended the Federal Power Act
(FPA) by adding a new subsection (g) to
section 202, under which the
Commission, by rule, was to require
each public utility to report to the
Commission and any appropriate state
regulatory authority:
• any anticipated shortages of electric
energy or capacity which would affect
the utility’s capability to serve its
wholesale customers; and
• a contingency plan that would
outline what circumstances might give
rise to such occurrences.
• In Order No. 575,3 the Commission
modified the reporting requirements in
18 CFR 294.101(b) to provide that, if a
public utility includes in its rates
schedule, provisions that during electric
energy and capacity shortages:
Æ It will treat firm power wholesale
customers without undue
discrimination or preference; and
Æ it will report any modifications to
its contingency plan for accommodating
shortages within 15 days to the
appropriate state regulatory agency and
to the affected wholesale customers,
then the utility need not file with the
Commission an additional statement of
contingency plan for accommodating
such shortages.
This revision merely changed the
reporting mechanism; the public
utility’s contingency plan would be
located in its filed rate rather than in a
2 PURPA = Public Utility Regulatory Policies Act
of 1979 (Pub. L. 95–617, 92 Stat. 3117), enacted 11/
9/1978.
3 Final Rule in Docket RM92–12–000, issued on
1/13/1995.
E:\FR\FM\22JYN1.SGM
22JYN1
Agencies
[Federal Register Volume 86, Number 138 (Thursday, July 22, 2021)]
[Notices]
[Pages 38703-38704]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-15541]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2310-243]
Pacific Gas and Electric Company; Notice of Application Accepted
for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Temporary variance of license requirement.
b. Project No.: 2310-243.
c. Date Filed: July 8, 2021 and supplemented on July 14, 2021.
d. Applicant: Pacific Gas and Electric Company (licensee).
e. Name of Project: Drum-Spaulding Project.
f. Location: South Yuba River and Bear River in Placer and Nevada
counties, California.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Michelle Ocken, License Coordinator, Pacific
Gas and Electric Company, (530) 863-3439.
i. FERC Contact: Robert Ballantine, (202) 502-6289,
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 20 days from the issuance of this notice by the Commission (August
4, 2021).
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. The first page of any filing should
include docket number P-2310-243. Comments emailed to Commission staff
are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: Due to persistent drought conditions,
the licensee requests Commission approval of a temporary variance of
the minimum flow requirement at streamflow gage YB-292 (Mormon Ravine).
The licensee is requesting to decrease the target flow from an
instantaneous 5 cubic feet per second (cfs) to 3 cfs, measured as a 24-
hour average. The reduced flow is necessary to manage water resources
in association with Placer County Water Agency and license required
flows. If granted, the variance would last through October 1, 2021, or
until adequate precipitation occurs to ensure that inflow equals
outflow at the referenced reservoir for at least seven consecutive
days, whichever comes later.
l. Locations of the Application: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
excluding the last three digits in the docket number field to access
the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and
issuances related to this or other pending projects. Agencies may
obtain copies of the application directly from the applicant. At this
time, the Commission has suspended access to the Commission's Public
Reference Room due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact the Federal Energy
Regulatory Commission at
[[Page 38704]]
[email protected] or call toll free, (866) 208-3676 or TTY,
(202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 385.2010.
Dated: July 15, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-15541 Filed 7-21-21; 8:45 am]