Combined Notice of Filings #1, 38473-38474 [2021-15513]
Download as PDF
Federal Register / Vol. 86, No. 137 / Wednesday, July 21, 2021 / Notices
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 15, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–15510 Filed 7–20–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–195–000.
Applicants: Tulare Solar Center, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Tulare Solar Center,
LLC.
Filed Date: 7/13/21.
Accession Number: 20210713–5163.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: EG21–196–000.
Applicants: Boulder Solar III, LLC.
Description: Self-Certification of EG or
FC of Boulder Solar III, LLC.
Filed Date: 7/15/21.
Accession Number: 20210715–5098.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: EG21–197–000.
Applicants: Ho’ohana Solar 1, LLC.
Description: Self-Certification of
Exempt Wholesale Generator Status of
Ho’ohana Solar 1, LLC.
Filed Date: 7/15/21.
Accession Number: 20210715–5107.
Comments Due: 5 p.m. ET 8/5/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–857–002;
ER21–856–002.
Applicants: Trent River Solar, LLC,
PGR Lessee P, LLC.
Description: Supplement to June 30,
2021 Notice of Non-Material Change in
Status of Trent River Solar, LLC, et al.
Filed Date: 7/15/21.
Accession Number: 20210715–5043.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21–1191–008.
Applicants: Southwestern Electric
Power Company.
Description: Tariff Amendment:
Amended and Restated Minden PSA to
be effective 8/1/2018.
Filed Date: 7/14/21.
Accession Number: 20210714–5138.
Comments Due: 5 p.m. ET 8/4/21.
VerDate Sep<11>2014
17:26 Jul 20, 2021
Jkt 253001
Docket Numbers: ER21–1962–001.
Applicants: Mulberry BESS LLC.
Description: Tariff Amendment:
Supplement to Market-Based Rate
Application to be effective 5/21/2021.
Filed Date: 7/15/21.
Accession Number: 20210715–5095.
Comments Due: 5 p.m. ET 7/26/21.
Docket Numbers: ER21–2025–000.
Applicants: Tampa Electric Company.
Description: Supplemental Motion of
Tampa Electric Company to the May 27,
2021 Request for Waiver by Tampa
Electric Company.
Filed Date: 7/12/21.
Accession Number: 20210712–5184.
Comments Due: 5 p.m. ET 7/19/21.
Docket Numbers: ER21–2400–000.
Applicants: Long Island Power
Authority.
Description: Joint Request for Limited
Waiver of Long Island Power Authority
and Long Island Solar Farm.
Filed Date: 7/12/21.
Accession Number: 20210712–5181.
Comments Due: 5 p.m. ET 7/26/21.
Docket Numbers: ER21–2420–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–07–14_SA 3257 ITC MidwestLouise Solar Project 1st Rev GIA (J523)
to be effective 6/29/2021.
Filed Date: 7/14/21.
Accession Number: 20210714–5118.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21–2421–000.
Applicants: RE Garland A LLC.
Description: Initial rate filing: Garland
Storage Shared Facilities Agreement
Concurrence Filing to be effective 7/15/
2021.
Filed Date: 7/14/21.
Accession Number: 20210714–5135.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21–2422–000.
Applicants: SP Garland Solar Storage,
LLC.
Description: Initial rate filing: Garland
Storage Shared Facilities Agreement
Concurrence Filing to be effective 7/15/
2021.
Filed Date: 7/14/21.
Accession Number: 20210714–5136.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21–2423–000.
Applicants: Generation Bridge
Connecticut Holdings, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application and
Request for Expedited Action to be
effective 7/15/2021.
Filed Date: 7/14/21.
Accession Number: 20210714–5143.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21–2424–000.
Applicants: Generation Bridge M&M
Holdings, LLC.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
38473
Description: Baseline eTariff Filing:
Market-Based Rate Application and
Request for Expedited Action to be
effective 7/15/2021.
Filed Date: 7/14/21.
Accession Number: 20210714–5147.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21–2425–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 392 to be
effective 6/30/2021.
Filed Date: 7/14/21.
Accession Number: 20210714–5153.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21–2426–000.
Applicants: CPRE 1 Lessee, LLC.
Description: Baseline eTariff Filing:
App. for MBR Authority, Request for
Asso. Waivers & Auth. to make Affiliate
Sales to be effective 9/13/2021.
Filed Date: 7/14/21.
Accession Number: 20210714–5156.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21–2427–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original ISA, Service Agreement No.
6108; Queue No. AE1–183 to be
effective 6/17/2021.
Filed Date: 7/15/21.
Accession Number: 20210715–5016.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21–2428–000.
Applicants: Niagara Mohawk Power
Corporation, New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205:
SGIA between Niagara Mohawk and
Capital Hill Solar, SA No. 2641 to be
effective 6/15/2021.
Filed Date: 7/15/21.
Accession Number: 20210715–5032.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21–2429–000.
Applicants: Tulare Solar Center, LLC.
Description: Baseline eTariff Filing:
Tulare Solar Center, LLC MBR Tariff to
be effective 7/16/2021.
Filed Date: 7/15/21.
Accession Number: 20210715–5048.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21–2430–000.
Applicants: Virginia Electric and
Power Company, PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
VEPCo submits revised Mutual
Operating Agreement No. 2032 to be
effective 6/15/2021.
Filed Date: 7/15/21.
Accession Number: 20210715–5051.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21–2431–000.
Applicants: Southern California
Edison Company.
E:\FR\FM\21JYN1.SGM
21JYN1
jbell on DSKJLSW7X2PROD with NOTICES
38474
Federal Register / Vol. 86, No. 137 / Wednesday, July 21, 2021 / Notices
Description: § 205(d) Rate Filing:
LGIA Desert Quartzite, LLC—Quartzite
Solar 11 SA No. 270, TOT872 to be
effective 7/16/2021.
Filed Date: 7/15/21.
Accession Number: 20210715–5054.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21–2432–000.
Applicants: San Diego Gas & Electric
Company.
Description: § 205(d) Rate Filing:
Captiva Energy Storage E&P Agreement
to be effective 7/16/2021.
Filed Date: 7/15/21.
Accession Number: 20210715–5067.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21–2433–000.
Applicants: Florida Power & Light
Company.
Description: Tariff Cancellation: FPL
Cancellation of eTariff Records for
Attachments H–1 and H–2 of the OATT
to be effective 4/1/2020.
Filed Date: 7/15/21.
Accession Number: 20210715–5068.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21–2434–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: BPA
NITSA—(SE Idaho Area) Rev 6 to be
effective 7/1/2021.
Filed Date: 7/15/21.
Accession Number: 20210715–5074.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21–2435–000.
Applicants: WPS Power Development,
LLC.
Description: Tariff Cancellation:
Cancellation of Market-Based Rate Tariff
to be effective 9/14/2021.
Filed Date: 7/15/21.
Accession Number: 20210715–5102.
Comments Due: 5 p.m. ET 8/5/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
17:26 Jul 20, 2021
Jkt 253001
Dated: July 15, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–15513 Filed 7–20–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–470–000]
Freeport LNG Development, L.P.;
FLNG Liquefaction, LLC; FLNG
Liquefaction 2, LLC; FLNG
Liquefaction 3, LLC; Notice of
Application and Establishing
Intervention Deadline
Take notice that on June 29, 2021,
Freeport LNG Development, L.P., FLNG
Liquefaction, LLC, FLNG Liquefaction 2,
LLC and FLNG Liquefaction 3, LLC
(Freeport LNG), 333 Clay Street, Suite
5050, Houston, TX 77002, filed an
application under section 3(a) of the
Natural Gas Act (NGA), and Part 153 of
the Commission’s regulations requesting
authorization for a limited amendment
to their existing authorizations to
increase the authorized maximum
liquefied natural gas production
capacity of Freeport LNG’s Liquefaction
Project, from 782 Billion cubic feet per
year (Bcf/y), to approximately 870 Bcf/
y. Freeport LNG states that no
additional construction or modification
of previously authorized facilities is
required to implement this increase, all
as more fully set forth in the application
which is on file with the Commission
and open for public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding Freeport
LNG’s application may be directed to
John Tobola, Freeport LNG
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Development, L.P., 333 Clay Street,
Suite 5050, Houston, TX 77002, by
phone at (713) 980–2888, or by email at
jtobola@freeportlng.com; or Lisa M.
Tonery, Partner, Orrick, Herrington &
Sutcliffe LLP, 51 West 52nd Street, New
York, NY 10019, by phone at (212) 506–
3710, or by email at ltonery@orrick.com.
Pursuant to section 157.9 of the
Commission’s Rules of Practice and
Procedure,1 within 90 days of this
Notice the Commission staff will either:
Complete its environmental review and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or environmental assessment (EA) for
this proposal. The filing of an EA in the
Commission’s public record for this
proceeding or the issuance of a Notice
of Schedule for Environmental Review
will serve to notify federal and state
agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: You can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on August 4, 2021. How
to file comments and motions to
intervene is explained below.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before August 4,
2021. However, the filing of a comment
alone will not serve to make the filer a
party to the proceeding. To become a
party, you must intervene in the
proceeding.
Persons who comment on the
environmental review of this project
will be placed on the Commission’s
1 18
E:\FR\FM\21JYN1.SGM
CFR (Code of Federal Regulations) 157.9.
21JYN1
Agencies
[Federal Register Volume 86, Number 137 (Wednesday, July 21, 2021)]
[Notices]
[Pages 38473-38474]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-15513]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-195-000.
Applicants: Tulare Solar Center, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Tulare Solar Center, LLC.
Filed Date: 7/13/21.
Accession Number: 20210713-5163.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: EG21-196-000.
Applicants: Boulder Solar III, LLC.
Description: Self-Certification of EG or FC of Boulder Solar III,
LLC.
Filed Date: 7/15/21.
Accession Number: 20210715-5098.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: EG21-197-000.
Applicants: Ho'ohana Solar 1, LLC.
Description: Self-Certification of Exempt Wholesale Generator
Status of Ho'ohana Solar 1, LLC.
Filed Date: 7/15/21.
Accession Number: 20210715-5107.
Comments Due: 5 p.m. ET 8/5/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER21-857-002; ER21-856-002.
Applicants: Trent River Solar, LLC, PGR Lessee P, LLC.
Description: Supplement to June 30, 2021 Notice of Non-Material
Change in Status of Trent River Solar, LLC, et al.
Filed Date: 7/15/21.
Accession Number: 20210715-5043.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21-1191-008.
Applicants: Southwestern Electric Power Company.
Description: Tariff Amendment: Amended and Restated Minden PSA to
be effective 8/1/2018.
Filed Date: 7/14/21.
Accession Number: 20210714-5138.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21-1962-001.
Applicants: Mulberry BESS LLC.
Description: Tariff Amendment: Supplement to Market-Based Rate
Application to be effective 5/21/2021.
Filed Date: 7/15/21.
Accession Number: 20210715-5095.
Comments Due: 5 p.m. ET 7/26/21.
Docket Numbers: ER21-2025-000.
Applicants: Tampa Electric Company.
Description: Supplemental Motion of Tampa Electric Company to the
May 27, 2021 Request for Waiver by Tampa Electric Company.
Filed Date: 7/12/21.
Accession Number: 20210712-5184.
Comments Due: 5 p.m. ET 7/19/21.
Docket Numbers: ER21-2400-000.
Applicants: Long Island Power Authority.
Description: Joint Request for Limited Waiver of Long Island Power
Authority and Long Island Solar Farm.
Filed Date: 7/12/21.
Accession Number: 20210712-5181.
Comments Due: 5 p.m. ET 7/26/21.
Docket Numbers: ER21-2420-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2021-07-14_SA 3257 ITC
Midwest-Louise Solar Project 1st Rev GIA (J523) to be effective 6/29/
2021.
Filed Date: 7/14/21.
Accession Number: 20210714-5118.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21-2421-000.
Applicants: RE Garland A LLC.
Description: Initial rate filing: Garland Storage Shared Facilities
Agreement Concurrence Filing to be effective 7/15/2021.
Filed Date: 7/14/21.
Accession Number: 20210714-5135.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21-2422-000.
Applicants: SP Garland Solar Storage, LLC.
Description: Initial rate filing: Garland Storage Shared Facilities
Agreement Concurrence Filing to be effective 7/15/2021.
Filed Date: 7/14/21.
Accession Number: 20210714-5136.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21-2423-000.
Applicants: Generation Bridge Connecticut Holdings, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
and Request for Expedited Action to be effective 7/15/2021.
Filed Date: 7/14/21.
Accession Number: 20210714-5143.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21-2424-000.
Applicants: Generation Bridge M&M Holdings, LLC.
Description: Baseline eTariff Filing: Market-Based Rate Application
and Request for Expedited Action to be effective 7/15/2021.
Filed Date: 7/14/21.
Accession Number: 20210714-5147.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21-2425-000.
Applicants: Arizona Public Service Company.
Description: Sec. 205(d) Rate Filing: Service Agreement No. 392 to
be effective 6/30/2021.
Filed Date: 7/14/21.
Accession Number: 20210714-5153.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21-2426-000.
Applicants: CPRE 1 Lessee, LLC.
Description: Baseline eTariff Filing: App. for MBR Authority,
Request for Asso. Waivers & Auth. to make Affiliate Sales to be
effective 9/13/2021.
Filed Date: 7/14/21.
Accession Number: 20210714-5156.
Comments Due: 5 p.m. ET 8/4/21.
Docket Numbers: ER21-2427-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original ISA, Service
Agreement No. 6108; Queue No. AE1-183 to be effective 6/17/2021.
Filed Date: 7/15/21.
Accession Number: 20210715-5016.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21-2428-000.
Applicants: Niagara Mohawk Power Corporation, New York Independent
System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 205: SGIA between Niagara
Mohawk and Capital Hill Solar, SA No. 2641 to be effective 6/15/2021.
Filed Date: 7/15/21.
Accession Number: 20210715-5032.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21-2429-000.
Applicants: Tulare Solar Center, LLC.
Description: Baseline eTariff Filing: Tulare Solar Center, LLC MBR
Tariff to be effective 7/16/2021.
Filed Date: 7/15/21.
Accession Number: 20210715-5048.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21-2430-000.
Applicants: Virginia Electric and Power Company, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: VEPCo submits revised Mutual
Operating Agreement No. 2032 to be effective 6/15/2021.
Filed Date: 7/15/21.
Accession Number: 20210715-5051.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21-2431-000.
Applicants: Southern California Edison Company.
[[Page 38474]]
Description: Sec. 205(d) Rate Filing: LGIA Desert Quartzite, LLC--
Quartzite Solar 11 SA No. 270, TOT872 to be effective 7/16/2021.
Filed Date: 7/15/21.
Accession Number: 20210715-5054.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21-2432-000.
Applicants: San Diego Gas & Electric Company.
Description: Sec. 205(d) Rate Filing: Captiva Energy Storage E&P
Agreement to be effective 7/16/2021.
Filed Date: 7/15/21.
Accession Number: 20210715-5067.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21-2433-000.
Applicants: Florida Power & Light Company.
Description: Tariff Cancellation: FPL Cancellation of eTariff
Records for Attachments H-1 and H-2 of the OATT to be effective 4/1/
2020.
Filed Date: 7/15/21.
Accession Number: 20210715-5068.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21-2434-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: BPA NITSA--(SE Idaho Area)
Rev 6 to be effective 7/1/2021.
Filed Date: 7/15/21.
Accession Number: 20210715-5074.
Comments Due: 5 p.m. ET 8/5/21.
Docket Numbers: ER21-2435-000.
Applicants: WPS Power Development, LLC.
Description: Tariff Cancellation: Cancellation of Market-Based Rate
Tariff to be effective 9/14/2021.
Filed Date: 7/15/21.
Accession Number: 20210715-5102.
Comments Due: 5 p.m. ET 8/5/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 15, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-15513 Filed 7-20-21; 8:45 am]