South Sutter Water District; Notice of Authorization for Continued Project Operation, 38331-38332 [2021-15406]
Download as PDF
Federal Register / Vol. 86, No. 136 / Tuesday, July 20, 2021 / Notices
notice by the Commission, unless the
Commission orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Cornell University is authorized to
continue operation of the Cornell
University Hydroelectric Project, until
such time as the Commission acts on its
application for a subsequent license.
Dated: July 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–15407 Filed 7–19–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM07–16–000]
Notice of Format Change for Combined
Notices; Filing Via the Internet
The purpose of this notice is to
announce that the Commission will use
a new format for Combined Notices
(CNF) coming in early August 2021. The
format will change to include a single
table for each section of the combined
notice for electric filings and two tables
for the combined notice for natural gas
filings, one for filings initiating
proceedings and one for filings in
existing proceedings, as shown in the
examples below. This allows alignments
which improve the readability of the
document.
Beginning in August, the links
displayed in these combined notices
will include the following:
Docket Number Link: Links to the
Docket List page.
Description Link: Links to the File List
page. On the File List page, you can
generate the FERC PDF, download
single files, or download all files for the
document.
Accession Number Link: Links to the
Document Info page.
Also, the Combined Notices will
include additional filing types, in
particular complaints.
Electric CNF
khammond on DSKJM1Z7X2PROD with NOTICES
Gas CNF
Filings Instituting Proceedings
Docket Numbers: RP21–100–000.
Applicants: GEF Pipeline LLC.
Description: § 4(d) Rate Filing:
Updated Negotiated Rate PAL
Agreements—February 2021 to be
effective 5/10/2021.
Filed Date: 4/9/21.
Accession Number: 20210409–5065.
Comment Date: 5 p.m. ET 4/21/21.
Filings in Existing Proceedings
Docket Numbers: RP21–200–001.
Applicants: JLK Company of America
LLC.
Description: Tariff Amendment:
Amendment Filing to a Negotiated Rate
Agreement—Sempra Gas & Power to be
effective 4/1/2021.
Filed Date: 4/8/21.
Accession Number: 20210408–5290.
Comment Date: 5 p.m. ET 4/20/21.
Dated: July 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–15401 Filed 7–19–21; 8:45 am]
BILLING CODE 6717–01–P
Examples
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–1–000.
Applicants: VRP Energy Storage, LLC.
Description: Ventura Energy Storage,
LLC submits Notice of Consummation of
Transaction.
Filed Date: 5/19/21.
Accession Number: 20210519–5111.
Comment Date: 5 p.m. ET 6/9/21.
VerDate Sep<11>2014
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–1–000.
Applicants: NOP Renewables
Americas, LLC.
Description: Self-Certification of EWG
for Hickory Park Solar, LLC.
Filed Date: 5/19/21.
Accession Number: 20210519–5090.
Comment Date: 5 p.m. ET 6/9/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER21–100–000.
Applicants: ABC Electric Power
Company.
Description: Compliance filing: ABC
Energy Station 1, LLC submits tariff
filing per 35: Revised Rate Schedule
FERC No. 1 to be effective 12/1/2020.
Filed Date: 1/6/21.
Accession Number: 20210106–5021.
Comment Date: 5 p.m. ET 1/27/21.
17:00 Jul 19, 2021
Jkt 253001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2997–000]
South Sutter Water District; Notice of
Authorization for Continued Project
Operation
On July 1, 2019, South Sutter Water
District, licensee for the Camp Far West
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
38331
Hydroelectric Project No.2997, filed an
Application for a Subsequent License
pursuant to the Federal Power Act
(FPA) and the Commission’s regulations
thereunder. The Camp Far West
Hydroelectric Project is located on the
Bear River in Yuba, Nevada, and Placer
Counties, California.
The license for Project No. 2997 was
issued for a period ending June 30,
2021. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee(s)
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2997
is issued to the South Sutter Water
District, for a period effective July 1,
2021 through June 30, 2022 or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before June 30,
2022, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that South Sutter Water District is
authorized to continue operation of the
Camp Far West Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
E:\FR\FM\20JYN1.SGM
20JYN1
38332
Federal Register / Vol. 86, No. 136 / Tuesday, July 20, 2021 / Notices
Dated: July 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–15406 Filed 7–19–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–2376–003;
ER15–2025–002.
Applicants: Energy Power Investment
Company, LLC, EPP Renewable Energy,
LLC.
Description: Notice of Non-Material
Change in Status of Energy Power
Investment Company, LLC, et al.
Filed Date: 7/12/21.
Accession Number: 20210712–5183.
Comments Due: 5 p.m. ET 8/2/21.
Docket Numbers: ER20–660–006;
ER10–1892–019; ER10–2739–032;
ER16–1652–019; ER16–1924–006;
ER16–1925–006; ER16–1926–006.
Applicants: Bolt Energy Marketing,
LLC, Columbia Energy LLC, LifeEnergy,
LLC, LS Power Marketing, LLC, Bison
Solar LLC, Pavant Solar II LLC, San
Isabel Solar LLC.
Description: Notice of Change in
Status of Bolt Energy Marketing, LLC, et
al.
Filed Date: 7/12/21.
Accession Number: 20210712–5185.
Comments Due: 5 p.m. ET 8/2/21.
Docket Numbers: ER20–1719–003.
Applicants: PPL Electric Utilities
Corporation, PJM Interconnection,
L.L.C.
Description: Compliance filing: PPL
Electric submits Deficiency Response to
Compliance in ER20–1719 re Order 864
to be effective N/A.
Filed Date: 7/13/21.
Accession Number: 20210713–5059.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: ER20–2452–003;
ER20–844–002; ER20–2453–004.
Applicants: Hamilton Liberty LLC,
Hamilton Patriot LLC, Hamilton Projects
Acquiror, LLC.
Description: Notice of Non-Material
Change in Status of Hamilton Liberty
LLC, et al.
Filed Date: 7/9/21.
Accession Number: 20210709–5164.
Comments Due: 5 p.m. ET 7/30/21.
Docket Numbers: ER21–1191–007.
Applicants: Southwestern Electric
Power Company.
VerDate Sep<11>2014
17:00 Jul 19, 2021
Jkt 253001
Description: Tariff Amendment:
Amended and Restated Minden PSA to
be effective 8/1/2018.
Filed Date: 7/12/21.
Accession Number: 20210712–5128.
Comments Due: 5 p.m. ET 8/2/21.
Docket Numbers: ER21–1572–000.
Applicants: Avista Corporation.
Description: Report Filing: Avista
Response to Request for Additional
Information, Docket No. ER21–1572–
000 to be effective N/A.
Filed Date: 7/8/21.
Accession Number: 20210708–5045.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–2400–000.
Applicants: Long Island Power
Authority.
Description: Joint Request for Limited
Waiver of Long Island Power Authority
and Long Island Solar Farm.
Filed Date: 7/12/21.
Accession Number: 20210712–5181.
Comments Due: 5 p.m. ET 8/2/21.
Docket Numbers: ER21–2401–000.
Applicants: Oliver Wind Energy
Center II, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 8/31/2021.
Filed Date: 7/13/21.
Accession Number: 20210713–5045.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: ER21–2402–000.
Applicants: MET Southwest Trading
LLC.
Description: Tariff Cancellation:
Cancellation of MBR Tariff to be
effective 7/14/2021.
Filed Date: 7/13/21.
Accession Number: 20210713–5051.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: ER21–2403–000.
Applicants: Solios Power MidAtlantic Trading, LLC.
Description: Tariff Cancellation:
Cancellation of MBR Tariff to be
effective 7/14/2021.
Filed Date: 7/13/21.
Accession Number: 20210713–5052.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: ER21–2404–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 6107; Queue
No. AG1–318 to be effective 6/23/2021.
Filed Date: 7/13/21.
Accession Number: 20210713–5053.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: ER21–2405–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Amended CLGIA ORNI 50 LLC & Notice
of Termination of the eTariff to be
effective 7/14/2021.
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
Filed Date: 7/13/21.
Accession Number: 20210713–5058.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: ER21–2406–000.
Applicants: Lancaster Solar LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 9/12/2021.
Filed Date: 7/13/21.
Accession Number: 20210713–5097.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: ER21–2407–000.
Applicants: SR Georgia Portfolio II
Lessee, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 9/12/2021.
Filed Date: 7/13/21.
Accession Number: 20210713–5105.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: ER21–2408–000.
Applicants: SR Lumpkin, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 9/12/2021.
Filed Date: 7/13/21.
Accession Number: 20210713–5114.
Comments Due: 5 p.m. ET 8/3/21.
Docket Numbers: ER21–2409–000.
Applicants: SR Snipesville II, LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 9/12/2021.
Filed Date: 7/13/21.
Accession Number: 20210713–5119.
Comments Due: 5 p.m. ET 8/3/21.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH21–12–000.
Applicants: Enbridge Inc.
Description: Enbridge Inc. submits
FERC–65A Notice of Material Change in
Facts to Waiver Notification.
Filed Date: 7/9/21.
Accession Number: 20210709–5163.
Comments Due: 5 p.m. ET 7/30/21.
Docket Numbers: PH21–13–000.
Applicants: LS Power Development,
LLC.
Description: LS Power Development,
LLC submits FERC–65B Notice of NonMaterial Change in Fact to Waiver
Notification.
Filed Date: 7/12/21.
Accession Number: 20210712–5172.
Comments Due: 5 p.m. ET 8/2/21.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM21–26–000.
Applicants: Northern Virginia Electric
Cooperative.
Description: Application of Northern
Virginia Electric Cooperative, Inc. to
Terminate Its Mandatory Purchase
Obligation under the Public Utility
Regulatory Policies Act of 1978.
E:\FR\FM\20JYN1.SGM
20JYN1
Agencies
[Federal Register Volume 86, Number 136 (Tuesday, July 20, 2021)]
[Notices]
[Pages 38331-38332]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-15406]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2997-000]
South Sutter Water District; Notice of Authorization for
Continued Project Operation
On July 1, 2019, South Sutter Water District, licensee for the Camp
Far West Hydroelectric Project No.2997, filed an Application for a
Subsequent License pursuant to the Federal Power Act (FPA) and the
Commission's regulations thereunder. The Camp Far West Hydroelectric
Project is located on the Bear River in Yuba, Nevada, and Placer
Counties, California.
The license for Project No. 2997 was issued for a period ending
June 30, 2021. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee(s) under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2997 is issued to
the South Sutter Water District, for a period effective July 1, 2021
through June 30, 2022 or until the issuance of a new license for the
project or other disposition under the FPA, whichever comes first. If
issuance of a new license (or other disposition) does not take place on
or before June 30, 2022, notice is hereby given that, pursuant to 18
CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that South Sutter Water District is authorized to continue
operation of the Camp Far West Hydroelectric Project, until such time
as the Commission acts on its application for a subsequent license.
[[Page 38332]]
Dated: July 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-15406 Filed 7-19-21; 8:45 am]