South Sutter Water District; Notice of Authorization for Continued Project Operation, 38331-38332 [2021-15406]

Download as PDF Federal Register / Vol. 86, No. 136 / Tuesday, July 20, 2021 / Notices notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Cornell University is authorized to continue operation of the Cornell University Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: July 13, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–15407 Filed 7–19–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM07–16–000] Notice of Format Change for Combined Notices; Filing Via the Internet The purpose of this notice is to announce that the Commission will use a new format for Combined Notices (CNF) coming in early August 2021. The format will change to include a single table for each section of the combined notice for electric filings and two tables for the combined notice for natural gas filings, one for filings initiating proceedings and one for filings in existing proceedings, as shown in the examples below. This allows alignments which improve the readability of the document. Beginning in August, the links displayed in these combined notices will include the following: Docket Number Link: Links to the Docket List page. Description Link: Links to the File List page. On the File List page, you can generate the FERC PDF, download single files, or download all files for the document. Accession Number Link: Links to the Document Info page. Also, the Combined Notices will include additional filing types, in particular complaints. Electric CNF khammond on DSKJM1Z7X2PROD with NOTICES Gas CNF Filings Instituting Proceedings Docket Numbers: RP21–100–000. Applicants: GEF Pipeline LLC. Description: § 4(d) Rate Filing: Updated Negotiated Rate PAL Agreements—February 2021 to be effective 5/10/2021. Filed Date: 4/9/21. Accession Number: 20210409–5065. Comment Date: 5 p.m. ET 4/21/21. Filings in Existing Proceedings Docket Numbers: RP21–200–001. Applicants: JLK Company of America LLC. Description: Tariff Amendment: Amendment Filing to a Negotiated Rate Agreement—Sempra Gas & Power to be effective 4/1/2021. Filed Date: 4/8/21. Accession Number: 20210408–5290. Comment Date: 5 p.m. ET 4/20/21. Dated: July 13, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–15401 Filed 7–19–21; 8:45 am] BILLING CODE 6717–01–P Examples Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–1–000. Applicants: VRP Energy Storage, LLC. Description: Ventura Energy Storage, LLC submits Notice of Consummation of Transaction. Filed Date: 5/19/21. Accession Number: 20210519–5111. Comment Date: 5 p.m. ET 6/9/21. VerDate Sep<11>2014 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG21–1–000. Applicants: NOP Renewables Americas, LLC. Description: Self-Certification of EWG for Hickory Park Solar, LLC. Filed Date: 5/19/21. Accession Number: 20210519–5090. Comment Date: 5 p.m. ET 6/9/21. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER21–100–000. Applicants: ABC Electric Power Company. Description: Compliance filing: ABC Energy Station 1, LLC submits tariff filing per 35: Revised Rate Schedule FERC No. 1 to be effective 12/1/2020. Filed Date: 1/6/21. Accession Number: 20210106–5021. Comment Date: 5 p.m. ET 1/27/21. 17:00 Jul 19, 2021 Jkt 253001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2997–000] South Sutter Water District; Notice of Authorization for Continued Project Operation On July 1, 2019, South Sutter Water District, licensee for the Camp Far West PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 38331 Hydroelectric Project No.2997, filed an Application for a Subsequent License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Camp Far West Hydroelectric Project is located on the Bear River in Yuba, Nevada, and Placer Counties, California. The license for Project No. 2997 was issued for a period ending June 30, 2021. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2997 is issued to the South Sutter Water District, for a period effective July 1, 2021 through June 30, 2022 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before June 30, 2022, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that South Sutter Water District is authorized to continue operation of the Camp Far West Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. E:\FR\FM\20JYN1.SGM 20JYN1 38332 Federal Register / Vol. 86, No. 136 / Tuesday, July 20, 2021 / Notices Dated: July 13, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–15406 Filed 7–19–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSKJM1Z7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER15–2376–003; ER15–2025–002. Applicants: Energy Power Investment Company, LLC, EPP Renewable Energy, LLC. Description: Notice of Non-Material Change in Status of Energy Power Investment Company, LLC, et al. Filed Date: 7/12/21. Accession Number: 20210712–5183. Comments Due: 5 p.m. ET 8/2/21. Docket Numbers: ER20–660–006; ER10–1892–019; ER10–2739–032; ER16–1652–019; ER16–1924–006; ER16–1925–006; ER16–1926–006. Applicants: Bolt Energy Marketing, LLC, Columbia Energy LLC, LifeEnergy, LLC, LS Power Marketing, LLC, Bison Solar LLC, Pavant Solar II LLC, San Isabel Solar LLC. Description: Notice of Change in Status of Bolt Energy Marketing, LLC, et al. Filed Date: 7/12/21. Accession Number: 20210712–5185. Comments Due: 5 p.m. ET 8/2/21. Docket Numbers: ER20–1719–003. Applicants: PPL Electric Utilities Corporation, PJM Interconnection, L.L.C. Description: Compliance filing: PPL Electric submits Deficiency Response to Compliance in ER20–1719 re Order 864 to be effective N/A. Filed Date: 7/13/21. Accession Number: 20210713–5059. Comments Due: 5 p.m. ET 8/3/21. Docket Numbers: ER20–2452–003; ER20–844–002; ER20–2453–004. Applicants: Hamilton Liberty LLC, Hamilton Patriot LLC, Hamilton Projects Acquiror, LLC. Description: Notice of Non-Material Change in Status of Hamilton Liberty LLC, et al. Filed Date: 7/9/21. Accession Number: 20210709–5164. Comments Due: 5 p.m. ET 7/30/21. Docket Numbers: ER21–1191–007. Applicants: Southwestern Electric Power Company. VerDate Sep<11>2014 17:00 Jul 19, 2021 Jkt 253001 Description: Tariff Amendment: Amended and Restated Minden PSA to be effective 8/1/2018. Filed Date: 7/12/21. Accession Number: 20210712–5128. Comments Due: 5 p.m. ET 8/2/21. Docket Numbers: ER21–1572–000. Applicants: Avista Corporation. Description: Report Filing: Avista Response to Request for Additional Information, Docket No. ER21–1572– 000 to be effective N/A. Filed Date: 7/8/21. Accession Number: 20210708–5045. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–2400–000. Applicants: Long Island Power Authority. Description: Joint Request for Limited Waiver of Long Island Power Authority and Long Island Solar Farm. Filed Date: 7/12/21. Accession Number: 20210712–5181. Comments Due: 5 p.m. ET 8/2/21. Docket Numbers: ER21–2401–000. Applicants: Oliver Wind Energy Center II, LLC. Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 8/31/2021. Filed Date: 7/13/21. Accession Number: 20210713–5045. Comments Due: 5 p.m. ET 8/3/21. Docket Numbers: ER21–2402–000. Applicants: MET Southwest Trading LLC. Description: Tariff Cancellation: Cancellation of MBR Tariff to be effective 7/14/2021. Filed Date: 7/13/21. Accession Number: 20210713–5051. Comments Due: 5 p.m. ET 8/3/21. Docket Numbers: ER21–2403–000. Applicants: Solios Power MidAtlantic Trading, LLC. Description: Tariff Cancellation: Cancellation of MBR Tariff to be effective 7/14/2021. Filed Date: 7/13/21. Accession Number: 20210713–5052. Comments Due: 5 p.m. ET 8/3/21. Docket Numbers: ER21–2404–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, SA No. 6107; Queue No. AG1–318 to be effective 6/23/2021. Filed Date: 7/13/21. Accession Number: 20210713–5053. Comments Due: 5 p.m. ET 8/3/21. Docket Numbers: ER21–2405–000. Applicants: Southern California Edison Company. Description: Tariff Cancellation: Amended CLGIA ORNI 50 LLC & Notice of Termination of the eTariff to be effective 7/14/2021. PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 Filed Date: 7/13/21. Accession Number: 20210713–5058. Comments Due: 5 p.m. ET 8/3/21. Docket Numbers: ER21–2406–000. Applicants: Lancaster Solar LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 9/12/2021. Filed Date: 7/13/21. Accession Number: 20210713–5097. Comments Due: 5 p.m. ET 8/3/21. Docket Numbers: ER21–2407–000. Applicants: SR Georgia Portfolio II Lessee, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 9/12/2021. Filed Date: 7/13/21. Accession Number: 20210713–5105. Comments Due: 5 p.m. ET 8/3/21. Docket Numbers: ER21–2408–000. Applicants: SR Lumpkin, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 9/12/2021. Filed Date: 7/13/21. Accession Number: 20210713–5114. Comments Due: 5 p.m. ET 8/3/21. Docket Numbers: ER21–2409–000. Applicants: SR Snipesville II, LLC. Description: Baseline eTariff Filing: Market-Based Rate Application to be effective 9/12/2021. Filed Date: 7/13/21. Accession Number: 20210713–5119. Comments Due: 5 p.m. ET 8/3/21. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH21–12–000. Applicants: Enbridge Inc. Description: Enbridge Inc. submits FERC–65A Notice of Material Change in Facts to Waiver Notification. Filed Date: 7/9/21. Accession Number: 20210709–5163. Comments Due: 5 p.m. ET 7/30/21. Docket Numbers: PH21–13–000. Applicants: LS Power Development, LLC. Description: LS Power Development, LLC submits FERC–65B Notice of NonMaterial Change in Fact to Waiver Notification. Filed Date: 7/12/21. Accession Number: 20210712–5172. Comments Due: 5 p.m. ET 8/2/21. Take notice that the Commission received the following PURPA 210(m)(3) filings: Docket Numbers: QM21–26–000. Applicants: Northern Virginia Electric Cooperative. Description: Application of Northern Virginia Electric Cooperative, Inc. to Terminate Its Mandatory Purchase Obligation under the Public Utility Regulatory Policies Act of 1978. E:\FR\FM\20JYN1.SGM 20JYN1

Agencies

[Federal Register Volume 86, Number 136 (Tuesday, July 20, 2021)]
[Notices]
[Pages 38331-38332]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-15406]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2997-000]


South Sutter Water District; Notice of Authorization for 
Continued Project Operation

    On July 1, 2019, South Sutter Water District, licensee for the Camp 
Far West Hydroelectric Project No.2997, filed an Application for a 
Subsequent License pursuant to the Federal Power Act (FPA) and the 
Commission's regulations thereunder. The Camp Far West Hydroelectric 
Project is located on the Bear River in Yuba, Nevada, and Placer 
Counties, California.
    The license for Project No. 2997 was issued for a period ending 
June 30, 2021. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee(s) under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2997 is issued to 
the South Sutter Water District, for a period effective July 1, 2021 
through June 30, 2022 or until the issuance of a new license for the 
project or other disposition under the FPA, whichever comes first. If 
issuance of a new license (or other disposition) does not take place on 
or before June 30, 2022, notice is hereby given that, pursuant to 18 
CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that South Sutter Water District is authorized to continue 
operation of the Camp Far West Hydroelectric Project, until such time 
as the Commission acts on its application for a subsequent license.


[[Page 38332]]


    Dated: July 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-15406 Filed 7-19-21; 8:45 am]
BILLING CODE 6717-01-P