Erie Boulevard Hydropower, L.P.; Notice of Authorization for Continued Project Operation, 38334-38335 [2021-15402]

Download as PDF 38334 Federal Register / Vol. 86, No. 136 / Tuesday, July 20, 2021 / Notices issued by the President on March 13, 2020. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://ferconline.ferc.gov/ eSubscription.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ‘‘PRELIMINARY TERMS AND CONDITIONS,’’ or ‘‘PRELIMINARY FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. o. Procedural Schedule: The application will be processed according to the following revised Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date khammond on DSKJM1Z7X2PROD with NOTICES Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions .................................... Commission issues Draft EA or EIS ......................................................................................................................................... Comments on Draft EA or EIS .................................................................................................................................................. Modified Terms and Conditions ................................................................................................................................................ Commission Issues Final EA or EIS ......................................................................................................................................... p. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) A copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification. Please note that the certification request must comply with 40 CFR 121.5(b), including documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Please also note that the certification request must be sent to the certifying authority and to the Commission concurrently. q. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice. A notice of intent must specify the exact name, business address, and telephone number of the prospective VerDate Sep<11>2014 17:00 Jul 19, 2021 Jkt 253001 applicant, and must include an unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice. Dated: July 14, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–15404 Filed 7–19–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3452–000] Erie Boulevard Hydropower, L.P.; Notice of Authorization for Continued Project Operation On June 28, 2019, Erie Boulevard Hydropower, L.P., licensee for the Oak Orchard Hydroelectric Project No. 3452, filed an Application for a Subsequent License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Oak Orchard Hydroelectric Project is located adjacent to the New York State Canal Corporation’s Barge Canal in the Village of Medina, Orleans County, New York. The license for Project No. 3452 was issued for a period ending June 30, 2021. Section 15(a)(1) of the FPA, 16 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 September 2021. April 2022. May 2022. July 2022. October 2022. U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 3452 is issued to Erie Boulevard Hydropower, L.P. for a period effective July 1, 2021 through June 30, 2022 or until the issuance of a new license for the project E:\FR\FM\20JYN1.SGM 20JYN1 Federal Register / Vol. 86, No. 136 / Tuesday, July 20, 2021 / Notices or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before June 30, 2022, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Erie Boulevard Hydropower, L.P is authorized to continue operation of the Oak Orchard Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: July 14, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–15402 Filed 7–19–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2411–029] khammond on DSKJM1Z7X2PROD with NOTICES STS Hydropower, LLC, City of Danville, Virginia, Eagle Creek Schoolfield, LLC; Notice of Application for Partial Transfer of License and Soliciting Comments, Motions To Intervene, and Protests On June 14, 2021, STS Hydropower, LLC, (transferor), City of Danville, Virginia (co-licensee) and Eagle Creek Schoolfield, LLC (transferee) filed jointly an application for partial transfer of license for the Schoolfield Hydroelectric Project No. 2411. The project is located on the Dan River, in the City of Danville in Pittsylvania County, Virginia. The applicants seek Commission approval to partially transfer the license for the Schoolfield Hydroelectric Project from the transferor to the transferee and keeping the City of Danville, Virginia and Eagle Creek Schoolfield, LLC as colicensees. The transferee will be required by the Commission to comply with all the requirements of the license as though it were the original licensee. Applicants Contact: For transferor: Mr. Martin Karpenski, STS Hydropower, LLC, c/o Eagle Creek Renewable Energy, LLC, 65 Madison Avenue, Morristown, NJ 07960, Phone: 973–998–8400, Email: marty.karpenski@eaglecreekre.com and Mr. Joshua E. Adrian, Thompson Coburn LLP, 1909 K Street NW, Suite 600, Washington, DC 20006, Phone: VerDate Sep<11>2014 17:00 Jul 19, 2021 Jkt 253001 202–585–6922, Email: jadrian@ thompsoncoburn.com. For co-licensee: Mr. Kenneth F. Larking, City Manager, City of Danville, P.O. Box 3300, 427 Patton St., Danville, VA 24543, Phone: 434–799–5100, Email: klarking@danvilleva.gov. For transferee: Mr. Martin Karpenski, Eagle Creek Schoolfield, LLC, c/o Eagle Creek Renewable Energy, LLC, 65 Madison Avenue, Morristown, NJ 07960, Phone: 973–998–8400, Email: marty.karpenski@eaglecreekre.com and Mr. Joshua E. Adrian, Thompson Coburn LLP, 1909 K Street NW, Suite 600, Washington, DC 20006, Phone: 202–585–6922, Email: jadrian@ thompsoncoburn.com. FERC Contact: Anumzziatta Purchiaroni, (202) 502–6191, Anumzziatta.purchiaroni@ferc.gov. Deadline for filing comments, motions to intervene, and protests: 15 days from the date that the Commission issues this notice. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via U.S. Postal Service must be addressed to, Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to, Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2411–029. Comments emailed to Commission staff are not considered part of the Commission record. Dated: July 13, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–15408 Filed 7–19–21; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 38335 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC21–20–000] Commission Information Collection Activities (FERC–567, FERC–576); Consolidated Comment Request; Extension Federal Energy Regulatory Commission, Department of Energy. ACTION: Notice of information collection and request for comments. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collections, FERC–567 (Gas Pipeline Certificates: Annual Reports of System Flow Diagrams) and FERC–576 (Report of Service Interruptions or Damage to Facilities) which will be submitted to the Office of Management and Budget (OMB) for a review of the information collection requirements. DATES: Comments on the collection of information are due August 19, 2021. ADDRESSES: Send written comments on FERC–567 and/or FERC–576 to OMB through www.reginfo.gov/public/do/ PRAMain, Attention: Federal Energy Regulatory Commission Desk Officer. Please identify the OMB control number (1902–0005 and/or 1902–0004) in the subject line. Your comments should be sent within 30 days of publication of this notice in the Federal Register. Please submit copies of your comments (identified by Docket No. IC21–20–000) to the Commission as noted below. Electronic filing through https://www.ferc.gov, is preferred. • Electronic Filing: Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format. • For those unable to file electronically, comments may be filed by USPS mail or by hand (including courier) delivery. Æ Mail via U.S. Postal Service Only: Addressed to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Æ Hand (including courier) delivery: Deliver to: Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. Instructions: OMB submissions must be formatted and filed in accordance with submission SUMMARY: E:\FR\FM\20JYN1.SGM 20JYN1

Agencies

[Federal Register Volume 86, Number 136 (Tuesday, July 20, 2021)]
[Notices]
[Pages 38334-38335]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-15402]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3452-000]


Erie Boulevard Hydropower, L.P.; Notice of Authorization for 
Continued Project Operation

    On June 28, 2019, Erie Boulevard Hydropower, L.P., licensee for the 
Oak Orchard Hydroelectric Project No. 3452, filed an Application for a 
Subsequent License pursuant to the Federal Power Act (FPA) and the 
Commission's regulations thereunder. The Oak Orchard Hydroelectric 
Project is located adjacent to the New York State Canal Corporation's 
Barge Canal in the Village of Medina, Orleans County, New York.
    The license for Project No. 3452 was issued for a period ending 
June 30, 2021. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee(s) under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 3452 is issued to 
Erie Boulevard Hydropower, L.P. for a period effective July 1, 2021 
through June 30, 2022 or until the issuance of a new license for the 
project

[[Page 38335]]

or other disposition under the FPA, whichever comes first. If issuance 
of a new license (or other disposition) does not take place on or 
before June 30, 2022, notice is hereby given that, pursuant to 18 CFR 
16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that Erie Boulevard Hydropower, L.P is authorized to 
continue operation of the Oak Orchard Hydroelectric Project, until such 
time as the Commission acts on its application for a subsequent 
license.

    Dated: July 14, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-15402 Filed 7-19-21; 8:45 am]