Combined Notice of Filings #1, 37750-37751 [2021-15147]
Download as PDF
37750
Federal Register / Vol. 86, No. 134 / Friday, July 16, 2021 / Notices
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
DEPARTMENT OF ENERGY
Dated: July 8, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
Combined Notice of Filings #1
[FR Doc. 2021–15150 Filed 7–15–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jbell on DSKJLSW7X2PROD with NOTICES
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP21–961–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing: GT&C
Section 50—PTR Replacement on ICTS
to be effective 8/8/2021.
Filed Date: 7/8/21.
Accession Number: 20210708–5060.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: RP21–962–000.
Applicants: Eastern Gas Transmission
and Storage, Inc.
Description: § 4(d) Rate Filing:
EGTS—July 8, 2021 Administrative
Changes to be effective 8/9/2021.
Filed Date: 7/8/21.
Accession Number: 20210708–5062.
Comments Due: 5 p.m. ET 7/20/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 12, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–15156 Filed 7–15–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:26 Jul 15, 2021
Jkt 253001
Federal Energy Regulatory
Commission
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–103–000.
Applicants: Rainbow Energy Center,
LLC, Nexus Line, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Nexus Line, LLC,
et al.
Filed Date: 7/8/21.
Accession Number: 20210708–5071.
Comments Due: 5 p.m. ET 7/29/21.
Take notice that the Commission
received the following electric rate
filings:.
Docket Numbers: ER10–1910–021;
ER10–1911–021.
Applicants: Duquesne Light
Company, Duquesne Power, LLC.
Description: Notice of Change in
Status of Duquesne Light Company, et
al.
Filed Date: 7/7/21.
Accession Number: 20210707–5129.
Comments Due: 5 p.m. ET 7/28/21.
Docket Numbers: ER20–2719–001.
Applicants: Ringer Hill Wind, LLC.
Description: Report Filing: Refund
Report to be effective N/A.
Filed Date: 7/8/21.
Accession Number: 20210708–5044.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–1647–001.
Applicants: Central Hudson Gas &
Electric Corporation, Consolidated
Edison Company of New York, Inc.,
Orange and Rockland Utilities, Inc.,
Niagara Mohawk Power Corporation,
Rochester Gas and Electric Corporation,
New York State Electric & Gas
Corporation, New York Independent
System Operator, Inc.
Description: Tariff Amendment:
Deficiency response on behalf of NYTOs
re: TO Funding of Tra to be effective
9/7/2021.
Filed Date: 7/8/21.
Accession Number: 20210708–5069.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–2374–000.
Applicants: ALLETE, Inc.
Description: § 205(d) Rate Filing:
Certificate of Concurrence (Fargo CMA)
to be effective 4/24/2013.
Filed Date: 7/8/21.
Accession Number: 20210708–5038.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–2375–000.
Applicants: ALLETE, Inc.
Description: § 205(d) Rate Filing:
Certificate of Concurrence (Fargo OMA)
to be effective 4/24/2013.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Filed Date: 7/8/21.
Accession Number: 20210708–5040.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–2376–000.
Applicants: ALLETE, Inc.
Description: § 205(d) Rate Filing:
Certificate of Concurrence (Fargo TCEA)
to be effective 4/24/2013.
Filed Date: 7/8/21.
Accession Number: 20210708–5043.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–2377–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: First
Amendment LGIA Athos Power Plant
Project SA No. 227 TOT849 to be
effective 7/9/2021.
Filed Date: 7/8/21.
Accession Number: 20210708–5061.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–2378–000.
Applicants: National Grid Generation
LLC.
Description: § 205(d) Rate Filing:
Annual Reset of Pension and OPEB
Expenses to be effective 1/1/2021.
Filed Date: 7/8/21.
Accession Number: 20210708–5086.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–2379–000.
Applicants: Rainbow Energy Center,
LLC.
Description: Baseline eTariff Filing:
Rainbow Energy Center, LLC MBR
Application Filing to be effective 8/31/
2021.
Filed Date: 7/8/21.
Accession Number: 20210708–5101.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–2380–000.
Applicants: EDF Trading North
America, LLC.
Description: Compliance filing:
Compliance Justification filing 2021 to
be effective N/A.
Filed Date: 7/8/21.
Accession Number: 20210708–5119.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21–2381–000.
Applicants: Wisconsin Electric Power
Company.
Description: § 205(d) Rate Filing:
Formula Rate Update Filing for 2020
Rate Year to be effective 9/7/2021.
Filed Date: 7/8/21.
Accession Number: 20210708–5121.
Comments Due: 5 p.m. ET 7/29/21.
Take notice that the Commission
received the following electric
reliability filings.
Docket Numbers: RD21–5–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of the North
American Electric Reliability
Corporation For Approval of Proposed
E:\FR\FM\16JYN1.SGM
16JYN1
Federal Register / Vol. 86, No. 134 / Friday, July 16, 2021 / Notices
Reliability Standards EOP–011–2, IRO–
010–4, and TOP–003–5 and Request for
Expedited Action.
Filed Date: 6/17/21.
Accession Number: 20210617–5165.
Comments Due: 5 p.m. ET 7/29/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 8, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
BILLING CODE 6560–50–P
FEDERAL COMMUNICATIONS
COMMISSION
[OMB 3060–0149; FR ID 38144]
Federal Communications
Commission.
ACTION: Notice and request for
comments.
ENVIRONMENTAL PROTECTION
AGENCY
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed July 2, 2021 10 a.m. EST Through
July 12, 2021 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20210095, Draft, FHWA, NY,
Interstate 81 Viaduct Project,
Comment Period Ends: 09/14/2021,
Contact: Richard J. Marquis 518–431–
4127.
EIS No. 20210096, Final, AZDOT,
FHWA, AZ, Tier 1 Environmental
Jkt 253001
As part of its continuing effort
to reduce paperwork burdens, and as
required by the Paperwork Reduction
Act of 1995 (PRA), the Federal
Communications Commission (FCC or
Commission) invites the general public
and other Federal agencies to take this
opportunity to comment on the
following information collections.
Comments are requested concerning:
Whether the proposed collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information shall have practical utility;
the accuracy of the Commission’s
burden estimate; ways to enhance the
quality, utility, and clarity of the
information collected; ways to minimize
the burden of the collection of
information on the respondents,
including the use of automated
collection techniques or other forms of
information technology; and ways to
further reduce the information
collection burden on small business
concerns with fewer than 25 employees.
The FCC may not conduct or sponsor a
collection of information unless it
displays a currently valid Office of
SUMMARY:
[ER–FRL–9057–4]
jbell on DSKJLSW7X2PROD with NOTICES
[FR Doc. 2021–15134 Filed 7–15–21; 8:45 am]
AGENCY:
BILLING CODE 6717–01–P
17:26 Jul 15, 2021
Dated: July 12, 2021.
Cindy S. Barger,
Director, NEPA Compliance Division, Office
of Federal Activities.
Information Collection Being Reviewed
by the Federal Communications
Commission
[FR Doc. 2021–15147 Filed 7–15–21; 8:45 am]
VerDate Sep<11>2014
Impact Statement and Preliminary
Section 4(f) Evaluation for Interstate
11 Corridor between Nogales and
Wickenburg, Arizona, Review Period
Ends: 08/16/2021, Contact: Alan
Hansen 602–382–8964.
EIS No. 20210097, Draft, FERC, AZ,
North Baja Xpress Project, Comment
Period Ends: 08/30/2021, Contact:
Office of External Affairs 866–208–
3372.
EIS No. 20210098, Draft, VA, PRO, Draft
Programmatic Environmental Impact
Statement for Veterans Affairs
Housing Loan Program, Comment
Period Ends: 08/30/2021, Contact:
Elysium Drumm 202–632–8862.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
37751
Management and Budget (OMB) control
number. No person shall be subject to
any penalty for failing to comply with
a collection of information subject to the
PRA that does not display a valid OMB
control number.
DATES: Written PRA comments should
be submitted on or before September 14,
2021. If you anticipate that you will be
submitting comments, but find it
difficult to do so within the period of
time allowed by this notice, you should
advise the contact listed below as soon
as possible.
ADDRESSES: Direct all PRA comments to
Nicole Ongele, FCC, via email PRA@
fcc.gov and to Nicole.Ongele@fcc.gov.
FOR FURTHER INFORMATION CONTACT: For
additional information about the
information collection, contact Nicole
Ongele, (202) 418–2991.
SUPPLEMENTARY INFORMATION:
OMB Control Number: 3060–0149.
Title: Part 63, Accelerating Wireline
Broadband Deployment by Removing
Barriers to Infrastructure Investment,
WC Docket No. 17–84, FCC 18–74.
Form Number(s): N/A.
Type of Review: Extension of a
currently approved collection.
Respondents: Business or other for
profit.
Number of Respondents and
Responses: 80 respondents; 88
responses.
Estimated Time per Response: 6–62
hours per response.
Frequency of Response: One-time
reporting requirement and third-party
disclosure requirements.
Obligation to Respond: Required to
obtain or retain benefits. Statutory
authority for this collection of
information is contained in 47 U.S.C.
214 and 402 of the Communications Act
of 1934, as amended.
Total Annual Burden: 1,096 hours.
Total Annual Cost: $27,900.
Privacy Act Impact Assessment: No
impact(s).
Nature and Extent of Confidentiality:
Information filed in section 214
applications has generally been
nonconfidential. Requests from parties
seeking confidential treatment are
considered by Commission staff
pursuant to 47 CFR 0.459 of the
Commission’s rules.
Needs and Uses: The Commission is
seeking the Office of Management and
Budget (OMB) approval for an extension
of a currently approved collection to
OMB. The Commission will submit this
information collection to OMB after this
60-day comment period. Section 214 of
the Communications Act of 1934, as
amended, requires that a carrier must
first obtain FCC authorization either to
E:\FR\FM\16JYN1.SGM
16JYN1
Agencies
[Federal Register Volume 86, Number 134 (Friday, July 16, 2021)]
[Notices]
[Pages 37750-37751]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-15147]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC21-103-000.
Applicants: Rainbow Energy Center, LLC, Nexus Line, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act of Nexus Line, LLC, et al.
Filed Date: 7/8/21.
Accession Number: 20210708-5071.
Comments Due: 5 p.m. ET 7/29/21.
Take notice that the Commission received the following electric
rate filings:.
Docket Numbers: ER10-1910-021; ER10-1911-021.
Applicants: Duquesne Light Company, Duquesne Power, LLC.
Description: Notice of Change in Status of Duquesne Light Company,
et al.
Filed Date: 7/7/21.
Accession Number: 20210707-5129.
Comments Due: 5 p.m. ET 7/28/21.
Docket Numbers: ER20-2719-001.
Applicants: Ringer Hill Wind, LLC.
Description: Report Filing: Refund Report to be effective N/A.
Filed Date: 7/8/21.
Accession Number: 20210708-5044.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21-1647-001.
Applicants: Central Hudson Gas & Electric Corporation, Consolidated
Edison Company of New York, Inc., Orange and Rockland Utilities, Inc.,
Niagara Mohawk Power Corporation, Rochester Gas and Electric
Corporation, New York State Electric & Gas Corporation, New York
Independent System Operator, Inc.
Description: Tariff Amendment: Deficiency response on behalf of
NYTOs re: TO Funding of Tra to be effective 9/7/2021.
Filed Date: 7/8/21.
Accession Number: 20210708-5069.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21-2374-000.
Applicants: ALLETE, Inc.
Description: Sec. 205(d) Rate Filing: Certificate of Concurrence
(Fargo CMA) to be effective 4/24/2013.
Filed Date: 7/8/21.
Accession Number: 20210708-5038.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21-2375-000.
Applicants: ALLETE, Inc.
Description: Sec. 205(d) Rate Filing: Certificate of Concurrence
(Fargo OMA) to be effective 4/24/2013.
Filed Date: 7/8/21.
Accession Number: 20210708-5040.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21-2376-000.
Applicants: ALLETE, Inc.
Description: Sec. 205(d) Rate Filing: Certificate of Concurrence
(Fargo TCEA) to be effective 4/24/2013.
Filed Date: 7/8/21.
Accession Number: 20210708-5043.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21-2377-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: First Amendment LGIA Athos
Power Plant Project SA No. 227 TOT849 to be effective 7/9/2021.
Filed Date: 7/8/21.
Accession Number: 20210708-5061.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21-2378-000.
Applicants: National Grid Generation LLC.
Description: Sec. 205(d) Rate Filing: Annual Reset of Pension and
OPEB Expenses to be effective 1/1/2021.
Filed Date: 7/8/21.
Accession Number: 20210708-5086.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21-2379-000.
Applicants: Rainbow Energy Center, LLC.
Description: Baseline eTariff Filing: Rainbow Energy Center, LLC
MBR Application Filing to be effective 8/31/2021.
Filed Date: 7/8/21.
Accession Number: 20210708-5101.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21-2380-000.
Applicants: EDF Trading North America, LLC.
Description: Compliance filing: Compliance Justification filing
2021 to be effective N/A.
Filed Date: 7/8/21.
Accession Number: 20210708-5119.
Comments Due: 5 p.m. ET 7/29/21.
Docket Numbers: ER21-2381-000.
Applicants: Wisconsin Electric Power Company.
Description: Sec. 205(d) Rate Filing: Formula Rate Update Filing
for 2020 Rate Year to be effective 9/7/2021.
Filed Date: 7/8/21.
Accession Number: 20210708-5121.
Comments Due: 5 p.m. ET 7/29/21.
Take notice that the Commission received the following electric
reliability filings.
Docket Numbers: RD21-5-000.
Applicants: North American Electric Reliability Corporation.
Description: Petition of the North American Electric Reliability
Corporation For Approval of Proposed
[[Page 37751]]
Reliability Standards EOP-011-2, IRO-010-4, and TOP-003-5 and Request
for Expedited Action.
Filed Date: 6/17/21.
Accession Number: 20210617-5165.
Comments Due: 5 p.m. ET 7/29/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: July 8, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-15147 Filed 7-15-21; 8:45 am]
BILLING CODE 6717-01-P