Combined Notice of Filings #1, 37750-37751 [2021-15147]

Download as PDF 37750 Federal Register / Vol. 86, No. 134 / Friday, July 16, 2021 / Notices can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Dated: July 8, 2021. Debbie-Anne A. Reese, Deputy Secretary. Combined Notice of Filings #1 [FR Doc. 2021–15150 Filed 7–15–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission jbell on DSKJLSW7X2PROD with NOTICES Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP21–961–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: GT&C Section 50—PTR Replacement on ICTS to be effective 8/8/2021. Filed Date: 7/8/21. Accession Number: 20210708–5060. Comments Due: 5 p.m. ET 7/20/21. Docket Numbers: RP21–962–000. Applicants: Eastern Gas Transmission and Storage, Inc. Description: § 4(d) Rate Filing: EGTS—July 8, 2021 Administrative Changes to be effective 8/9/2021. Filed Date: 7/8/21. Accession Number: 20210708–5062. Comments Due: 5 p.m. ET 7/20/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 12, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–15156 Filed 7–15–21; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:26 Jul 15, 2021 Jkt 253001 Federal Energy Regulatory Commission Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–103–000. Applicants: Rainbow Energy Center, LLC, Nexus Line, LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act of Nexus Line, LLC, et al. Filed Date: 7/8/21. Accession Number: 20210708–5071. Comments Due: 5 p.m. ET 7/29/21. Take notice that the Commission received the following electric rate filings:. Docket Numbers: ER10–1910–021; ER10–1911–021. Applicants: Duquesne Light Company, Duquesne Power, LLC. Description: Notice of Change in Status of Duquesne Light Company, et al. Filed Date: 7/7/21. Accession Number: 20210707–5129. Comments Due: 5 p.m. ET 7/28/21. Docket Numbers: ER20–2719–001. Applicants: Ringer Hill Wind, LLC. Description: Report Filing: Refund Report to be effective N/A. Filed Date: 7/8/21. Accession Number: 20210708–5044. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–1647–001. Applicants: Central Hudson Gas & Electric Corporation, Consolidated Edison Company of New York, Inc., Orange and Rockland Utilities, Inc., Niagara Mohawk Power Corporation, Rochester Gas and Electric Corporation, New York State Electric & Gas Corporation, New York Independent System Operator, Inc. Description: Tariff Amendment: Deficiency response on behalf of NYTOs re: TO Funding of Tra to be effective 9/7/2021. Filed Date: 7/8/21. Accession Number: 20210708–5069. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–2374–000. Applicants: ALLETE, Inc. Description: § 205(d) Rate Filing: Certificate of Concurrence (Fargo CMA) to be effective 4/24/2013. Filed Date: 7/8/21. Accession Number: 20210708–5038. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–2375–000. Applicants: ALLETE, Inc. Description: § 205(d) Rate Filing: Certificate of Concurrence (Fargo OMA) to be effective 4/24/2013. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Filed Date: 7/8/21. Accession Number: 20210708–5040. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–2376–000. Applicants: ALLETE, Inc. Description: § 205(d) Rate Filing: Certificate of Concurrence (Fargo TCEA) to be effective 4/24/2013. Filed Date: 7/8/21. Accession Number: 20210708–5043. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–2377–000. Applicants: Southern California Edison Company. Description: § 205(d) Rate Filing: First Amendment LGIA Athos Power Plant Project SA No. 227 TOT849 to be effective 7/9/2021. Filed Date: 7/8/21. Accession Number: 20210708–5061. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–2378–000. Applicants: National Grid Generation LLC. Description: § 205(d) Rate Filing: Annual Reset of Pension and OPEB Expenses to be effective 1/1/2021. Filed Date: 7/8/21. Accession Number: 20210708–5086. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–2379–000. Applicants: Rainbow Energy Center, LLC. Description: Baseline eTariff Filing: Rainbow Energy Center, LLC MBR Application Filing to be effective 8/31/ 2021. Filed Date: 7/8/21. Accession Number: 20210708–5101. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–2380–000. Applicants: EDF Trading North America, LLC. Description: Compliance filing: Compliance Justification filing 2021 to be effective N/A. Filed Date: 7/8/21. Accession Number: 20210708–5119. Comments Due: 5 p.m. ET 7/29/21. Docket Numbers: ER21–2381–000. Applicants: Wisconsin Electric Power Company. Description: § 205(d) Rate Filing: Formula Rate Update Filing for 2020 Rate Year to be effective 9/7/2021. Filed Date: 7/8/21. Accession Number: 20210708–5121. Comments Due: 5 p.m. ET 7/29/21. Take notice that the Commission received the following electric reliability filings. Docket Numbers: RD21–5–000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation For Approval of Proposed E:\FR\FM\16JYN1.SGM 16JYN1 Federal Register / Vol. 86, No. 134 / Friday, July 16, 2021 / Notices Reliability Standards EOP–011–2, IRO– 010–4, and TOP–003–5 and Request for Expedited Action. Filed Date: 6/17/21. Accession Number: 20210617–5165. Comments Due: 5 p.m. ET 7/29/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: July 8, 2021. Debbie-Anne A. Reese, Deputy Secretary. BILLING CODE 6560–50–P FEDERAL COMMUNICATIONS COMMISSION [OMB 3060–0149; FR ID 38144] Federal Communications Commission. ACTION: Notice and request for comments. ENVIRONMENTAL PROTECTION AGENCY Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/nepa. Weekly receipt of Environmental Impact Statements (EIS) Filed July 2, 2021 10 a.m. EST Through July 12, 2021 10 a.m. EST Pursuant to 40 CFR 1506.9. Notice Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20210095, Draft, FHWA, NY, Interstate 81 Viaduct Project, Comment Period Ends: 09/14/2021, Contact: Richard J. Marquis 518–431– 4127. EIS No. 20210096, Final, AZDOT, FHWA, AZ, Tier 1 Environmental Jkt 253001 As part of its continuing effort to reduce paperwork burdens, and as required by the Paperwork Reduction Act of 1995 (PRA), the Federal Communications Commission (FCC or Commission) invites the general public and other Federal agencies to take this opportunity to comment on the following information collections. Comments are requested concerning: Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission’s burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid Office of SUMMARY: [ER–FRL–9057–4] jbell on DSKJLSW7X2PROD with NOTICES [FR Doc. 2021–15134 Filed 7–15–21; 8:45 am] AGENCY: BILLING CODE 6717–01–P 17:26 Jul 15, 2021 Dated: July 12, 2021. Cindy S. Barger, Director, NEPA Compliance Division, Office of Federal Activities. Information Collection Being Reviewed by the Federal Communications Commission [FR Doc. 2021–15147 Filed 7–15–21; 8:45 am] VerDate Sep<11>2014 Impact Statement and Preliminary Section 4(f) Evaluation for Interstate 11 Corridor between Nogales and Wickenburg, Arizona, Review Period Ends: 08/16/2021, Contact: Alan Hansen 602–382–8964. EIS No. 20210097, Draft, FERC, AZ, North Baja Xpress Project, Comment Period Ends: 08/30/2021, Contact: Office of External Affairs 866–208– 3372. EIS No. 20210098, Draft, VA, PRO, Draft Programmatic Environmental Impact Statement for Veterans Affairs Housing Loan Program, Comment Period Ends: 08/30/2021, Contact: Elysium Drumm 202–632–8862. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 37751 Management and Budget (OMB) control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the PRA that does not display a valid OMB control number. DATES: Written PRA comments should be submitted on or before September 14, 2021. If you anticipate that you will be submitting comments, but find it difficult to do so within the period of time allowed by this notice, you should advise the contact listed below as soon as possible. ADDRESSES: Direct all PRA comments to Nicole Ongele, FCC, via email PRA@ fcc.gov and to Nicole.Ongele@fcc.gov. FOR FURTHER INFORMATION CONTACT: For additional information about the information collection, contact Nicole Ongele, (202) 418–2991. SUPPLEMENTARY INFORMATION: OMB Control Number: 3060–0149. Title: Part 63, Accelerating Wireline Broadband Deployment by Removing Barriers to Infrastructure Investment, WC Docket No. 17–84, FCC 18–74. Form Number(s): N/A. Type of Review: Extension of a currently approved collection. Respondents: Business or other for profit. Number of Respondents and Responses: 80 respondents; 88 responses. Estimated Time per Response: 6–62 hours per response. Frequency of Response: One-time reporting requirement and third-party disclosure requirements. Obligation to Respond: Required to obtain or retain benefits. Statutory authority for this collection of information is contained in 47 U.S.C. 214 and 402 of the Communications Act of 1934, as amended. Total Annual Burden: 1,096 hours. Total Annual Cost: $27,900. Privacy Act Impact Assessment: No impact(s). Nature and Extent of Confidentiality: Information filed in section 214 applications has generally been nonconfidential. Requests from parties seeking confidential treatment are considered by Commission staff pursuant to 47 CFR 0.459 of the Commission’s rules. Needs and Uses: The Commission is seeking the Office of Management and Budget (OMB) approval for an extension of a currently approved collection to OMB. The Commission will submit this information collection to OMB after this 60-day comment period. Section 214 of the Communications Act of 1934, as amended, requires that a carrier must first obtain FCC authorization either to E:\FR\FM\16JYN1.SGM 16JYN1

Agencies

[Federal Register Volume 86, Number 134 (Friday, July 16, 2021)]
[Notices]
[Pages 37750-37751]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-15147]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:
    Docket Numbers: EC21-103-000.
    Applicants: Rainbow Energy Center, LLC, Nexus Line, LLC.
    Description: Application for Authorization Under Section 203 of the 
Federal Power Act of Nexus Line, LLC, et al.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5071.
    Comments Due: 5 p.m. ET 7/29/21.

    Take notice that the Commission received the following electric 
rate filings:.

    Docket Numbers: ER10-1910-021; ER10-1911-021.
    Applicants: Duquesne Light Company, Duquesne Power, LLC.
    Description: Notice of Change in Status of Duquesne Light Company, 
et al.
    Filed Date: 7/7/21.
    Accession Number: 20210707-5129.
    Comments Due: 5 p.m. ET 7/28/21.

    Docket Numbers: ER20-2719-001.
    Applicants: Ringer Hill Wind, LLC.
    Description: Report Filing: Refund Report to be effective N/A.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5044.
    Comments Due: 5 p.m. ET 7/29/21.

    Docket Numbers: ER21-1647-001.
    Applicants: Central Hudson Gas & Electric Corporation, Consolidated 
Edison Company of New York, Inc., Orange and Rockland Utilities, Inc., 
Niagara Mohawk Power Corporation, Rochester Gas and Electric 
Corporation, New York State Electric & Gas Corporation, New York 
Independent System Operator, Inc.
    Description: Tariff Amendment: Deficiency response on behalf of 
NYTOs re: TO Funding of Tra to be effective 9/7/2021.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5069.
    Comments Due: 5 p.m. ET 7/29/21.

    Docket Numbers: ER21-2374-000.
    Applicants: ALLETE, Inc.
    Description: Sec.  205(d) Rate Filing: Certificate of Concurrence 
(Fargo CMA) to be effective 4/24/2013.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5038.
    Comments Due: 5 p.m. ET 7/29/21.

    Docket Numbers: ER21-2375-000.
    Applicants: ALLETE, Inc.
    Description: Sec.  205(d) Rate Filing: Certificate of Concurrence 
(Fargo OMA) to be effective 4/24/2013.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5040.
    Comments Due: 5 p.m. ET 7/29/21.

    Docket Numbers: ER21-2376-000.
    Applicants: ALLETE, Inc.
    Description: Sec.  205(d) Rate Filing: Certificate of Concurrence 
(Fargo TCEA) to be effective 4/24/2013.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5043.
    Comments Due: 5 p.m. ET 7/29/21.

    Docket Numbers: ER21-2377-000.
    Applicants: Southern California Edison Company.
    Description: Sec.  205(d) Rate Filing: First Amendment LGIA Athos 
Power Plant Project SA No. 227 TOT849 to be effective 7/9/2021.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5061.
    Comments Due: 5 p.m. ET 7/29/21.

    Docket Numbers: ER21-2378-000.
    Applicants: National Grid Generation LLC.
    Description: Sec.  205(d) Rate Filing: Annual Reset of Pension and 
OPEB Expenses to be effective 1/1/2021.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5086.
    Comments Due: 5 p.m. ET 7/29/21.

    Docket Numbers: ER21-2379-000.
    Applicants: Rainbow Energy Center, LLC.
    Description: Baseline eTariff Filing: Rainbow Energy Center, LLC 
MBR Application Filing to be effective 8/31/2021.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5101.
    Comments Due: 5 p.m. ET 7/29/21.

    Docket Numbers: ER21-2380-000.
    Applicants: EDF Trading North America, LLC.
    Description: Compliance filing: Compliance Justification filing 
2021 to be effective N/A.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5119.
    Comments Due: 5 p.m. ET 7/29/21.

    Docket Numbers: ER21-2381-000.
    Applicants: Wisconsin Electric Power Company.
    Description: Sec.  205(d) Rate Filing: Formula Rate Update Filing 
for 2020 Rate Year to be effective 9/7/2021.
    Filed Date: 7/8/21.
    Accession Number: 20210708-5121.
    Comments Due: 5 p.m. ET 7/29/21.

    Take notice that the Commission received the following electric 
reliability filings.

    Docket Numbers: RD21-5-000.
    Applicants: North American Electric Reliability Corporation.
    Description: Petition of the North American Electric Reliability 
Corporation For Approval of Proposed

[[Page 37751]]

Reliability Standards EOP-011-2, IRO-010-4, and TOP-003-5 and Request 
for Expedited Action.
    Filed Date: 6/17/21.
    Accession Number: 20210617-5165.
    Comments Due: 5 p.m. ET 7/29/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: July 8, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-15147 Filed 7-15-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.