Iroquois Gas Transmission System, L.P.; Notice of Revised Comment Period Deadline, 37150 [2021-14943]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 37150 Federal Register / Vol. 86, No. 132 / Wednesday, July 14, 2021 / Notices Filed Date: 7/7/21. Accession Number: 20210707–5103. Comments Due: 5 p.m. ET 7/28/21. Docket Numbers: ER21–2371–000. Applicants: Lanyard Power Holdings, LLC. Description: Tariff Cancellation: Cancellation of Effective Dickerson Reactive Tariff effective June 29, 2021 to be effective 6/29/2021. Filed Date: 7/7/21. Accession Number: 20210707–5105. Comments Due: 5 p.m. ET 7/28/21. Docket Numbers: ER21–2372–000. Applicants: Ohio Power Company. Description: American Electric Power/Ohio Power Co. submits a Notice of Termination of an Operation and Maintenance Agreement designated as Supplement No. 32 to Rate Schedule FERC No. 74. Filed Date: 6/30/21. Accession Number: 20210630–5376. Comments Due: 5 p.m. ET 7/21/21. Docket Numbers: ER21–2373–000. Applicants: DTE Energy Trading, Inc. Description: Compliance filing: DTE Eenrgy Trading Cost Justification Filing to be effective N/A. Filed Date: 7/7/21. Accession Number: 20210707–5112. Comments Due: 5 p.m. ET 7/28/21. Take notice that the Commission received the following public utility holding company filings: Docket Numbers: PH21–11–000. Applicants: Axium Infrastructure Inc. Description: Axium Infrastructure, Inc. submits FERC–65B Notice of Change in Fact to Waiver Notification. Filed Date: 7/6/21. Accession Number: 20210706–5159. Comments Due: 5 p.m. ET 7/27/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. VerDate Sep<11>2014 17:49 Jul 13, 2021 Jkt 253001 Dated: July 7, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–14908 Filed 7–13–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP20–48–000] Iroquois Gas Transmission System, L.P.; Notice of Revised Comment Period Deadline On June 11, 2021, the Commission issued a notice setting August 2, 2021, as the date to file comments on the draft Environmental Impact Statement (EIS) for the Enhancement by Compression Project. The comment due date was based on the Environmental Protection Agency (EPA) issuing its Federal Register Notice of Availability of the EIS on the following Friday, June 18, 2021, consistent with EPA’s filing guidance and procedures. However, in observance of Juneteenth (as announced on June 17, 2021), the EPA did not issue its Federal Register notice for the EIS until June 25, 2021. Per Title 40 Code of Federal Regulations Section 1506.11, it is the EPA’s notice that establishes the beginning dates for comment periods on EISs. Therefore, the Commission is notifying all interested parties that the comment period now expires on August 9, 2021. Dated: July 8, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–14943 Filed 7–13–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 298–082] Southern California Edison Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary variance of license flow requirements. b. Project No.: 298–082. c. Date Filed: July 1, 2021. d. Applicant: Southern California Edison Company (licensee). PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 e. Name of Project: Kaweah Project. f. Location: The project is located on the East Fork, Marble Fork, and Middle Fork of the Kaweah River in Tulare County, California, and occupies lands of the United States administered by the Bureau of Land Management. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Wayne Allen, Southern California Edison Company, 1515 Walnut Grove Avenue, Rosemead, California 91770; (626) 302– 9741; wayne.allen@sce.com. i. FERC Contact: Brian Bartos, (202) 502–6679, brian.bartos@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is August 9, 2021. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. The first page of any filing should include docket number P–298–082. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The licensee requests Commission approval through the end of 2021 for a temporary variance of the minimum flow requirements below the Kaweah No. 1 E:\FR\FM\14JYN1.SGM 14JYN1

Agencies

[Federal Register Volume 86, Number 132 (Wednesday, July 14, 2021)]
[Notices]
[Page 37150]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-14943]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP20-48-000]


Iroquois Gas Transmission System, L.P.; Notice of Revised Comment 
Period Deadline

    On June 11, 2021, the Commission issued a notice setting August 2, 
2021, as the date to file comments on the draft Environmental Impact 
Statement (EIS) for the Enhancement by Compression Project. The comment 
due date was based on the Environmental Protection Agency (EPA) issuing 
its Federal Register Notice of Availability of the EIS on the following 
Friday, June 18, 2021, consistent with EPA's filing guidance and 
procedures. However, in observance of Juneteenth (as announced on June 
17, 2021), the EPA did not issue its Federal Register notice for the 
EIS until June 25, 2021. Per Title 40 Code of Federal Regulations 
Section 1506.11, it is the EPA's notice that establishes the beginning 
dates for comment periods on EISs. Therefore, the Commission is 
notifying all interested parties that the comment period now expires on 
August 9, 2021.

    Dated: July 8, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-14943 Filed 7-13-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.