ANR Pipeline Company; Great Lakes Transmission Limited Partnership; Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Alberta Xpress and Lease Capacity Abandonment Projects and Schedule for Environmental Review, 36740-36741 [2021-14846]
Download as PDF
36740
Federal Register / Vol. 86, No. 131 / Tuesday, July 13, 2021 / Notices
jbell on DSKJLSW7X2PROD with NOTICES
reply comments or answers will be
considered. If you wish to obtain legal
status by becoming a party to the
proceedings for this request, you
should, on or before the comment date
stated below, file a motion to intervene
in accordance with the requirements of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the Natural
Gas Act (18 CFR 157.10).4
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance.5 For
those extension requests that are
contested, the Commission will aim to
issue an order acting on the request
within 45 days.6 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.7 The Commission will not
consider arguments that re-litigate the
issuance of the certificate order,
including whether the Commission
properly found the project to be in the
public convenience and necessity and
whether the Commission’s
environmental analysis for the
certificate complied with the National
Environmental Policy Act.8 At the time
a pipeline requests an extension of time,
orders on certificates of public
convenience and necessity are final and
the Commission will not re-litigate their
issuance.9 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
4 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
5 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
6 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
7 Id. at P 40.
8 Similarly, the Commission will not re-litigate
the issuance of an NGA section 3 authorization,
including whether a proposed project is not
inconsistent with the public interest and whether
the Commission’s environmental analysis for the
permit order complied with NEPA.
9 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
VerDate Sep<11>2014
17:47 Jul 12, 2021
Jkt 253001
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and three copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on July 22, 2021.
Dated: July 7, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–14848 Filed 7–12–21; 8:45 am]
BILLING CODE 6717–01–P
whether ANR and Great Lakes proposed
Projects are in the public convenience
and necessity. The schedule for
preparation of the EIS is discussed in
the ‘‘Schedule for Environmental
Review’’ section of this notice.
The National Environmental Policy Act
Process
The production of the EIS is part of
the Commission’s overall National
Environmental Policy Act review
process. Commission staff will
independently analyze the proposed
Project and prepare a draft EIS, which
will be issued for public comment.
Commission staff will consider all
timely comments received during the
comment period on the draft EIS and
revise the document, as necessary,
before issuing a final EIS. Any draft and
final EIS will be available in electronic
format in the public record through
eLibrary 2 and the Commission’s natural
gas environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents).
ANR Pipeline Company; Great Lakes
Transmission Limited Partnership;
Notice of Intent To Prepare an
Environmental Impact Statement for
the Proposed Alberta Xpress and
Lease Capacity Abandonment Projects
and Schedule for Environmental
Review
Schedule for Environmental Review
This notice identifies the Commission
staff’s planned schedule for completion
of a final EIS for the Project, which is
based on an issuance of the draft EIS in
July 2020.
Issuance of Notice of Availability of the
final EIS—October 29, 2021
90-day Federal Authorization Decision
Deadline—January 27, 2022
If a schedule change becomes
necessary for the final EIS, an additional
notice will be provided so that the
relevant agencies are kept informed of
the Project’s progress.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
for the Alberta Xpress and Lease
Capacity Abandonment Projects
(Projects), proposed by ANR Pipeline
Company (ANR) and Great Lakes
Transmission Limited Partnership
(Great Lakes) in Evangeline Parish,
Louisiana. The EIS will tier off
Commission staff’s Environmental
Assessment (EA) and its findings and
conclusions for the Project issued on
December 4, 2020, and respond to
comments filed on the EA.1 The EIS will
assist the Commission in its
consideration of the Project’s
contribution to climate change and its
decision-making process to determine
Environmental Mailing List
This notice is being sent to the
Commission’s current environmental
mailing list for the Project which
includes federal, state, and local
government representatives and
agencies; Native American Tribes;
elected officials; other interested parties;
and local libraries and newspapers. This
list also includes all affected
landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
Project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the Project and includes a
mailing address with their comments.
Commission staff will update the
1 The EA for the Project is filed in Docket Nos.
CP20–484–000 and CP20–485–000 under Accession
No. 20201204–3004.
2 For instructions on connecting to eLibrary, refer
to the ‘‘Additional Information’’ section of this
notice.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP20–484–000; CP20–485–
000]
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
E:\FR\FM\13JYN1.SGM
13JYN1
Federal Register / Vol. 86, No. 131 / Tuesday, July 13, 2021 / Notices
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
Project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket numbers CP20–484–000 or
CP20–485–000 in your request. If you
are requesting a change to your address,
please be sure to include your name and
the correct address. If you are requesting
to delete your address from the mailing
list, please include your name and
address as it appeared on this notice.
This email address is unable to accept
comments. OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 1).
jbell on DSKJLSW7X2PROD with NOTICES
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Dated: July 7, 2021.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL21–89–000; QF21–629–000]
Hecate Energy Blair Road LLC; Notice
of Petition for Declaratory Order
Take notice that on July 6, 2021,
pursuant to Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure,1 Hecate Energy Blair Road
LLC (Blair or Petitioner), filed a petition
for declaratory order (Petition)
requesting that the Commission issue a
declaratory order providing limited
waiver of the filing requirements
applicable to small power production
facilities set forth in Section
292.203(a)(3) of the Commission’s
regulations (QF Filing Requirement) 2
for the time-period beginning when its
qualifying small power production
facility was placed into operation on
December 29, 2017, and ending on
March 30, 2021, and when Blair filed a
QF self- certification with respect to
such facility (Gap Period), as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
[FR Doc. 2021–14846 Filed 7–12–21; 8:45 am]
1 118
BILLING CODE 6717–01–P
2 18
VerDate Sep<11>2014
17:47 Jul 12, 2021
Jkt 253001
PO 00000
CFR 385.207 (2020).
CFR 292.203(a)(3).
Frm 00044
Fmt 4703
Sfmt 4703
36741
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
Comment Date: 5:00 p.m. Eastern time
on August 5, 2021.
Dated: July 7, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–14844 Filed 7–12–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP15–490–000, CP15–490–
001, CP16–20–000]
Delfin LNG LLC; Notice of Request for
Extension of Time
Take notice that on June 30, 2021,
Delfin LNG LLC (Delfin) requested that
the Federal Energy Regulatory
Commission (Commission) grant an
extension of time, until September 28,
2022, to construct and place into service
the facilities that were authorized in the
original certificate authorization issued
on September 28, 2017 (Certificate
Order).1 The Certificate Order
authorized certain ‘‘onshore facilities’’
that would be used exclusively to
transport natural gas to Delfin’s
deepwater port ‘‘offshore facilities’’
(collectively, the Project) in federal
waters offshore Louisiana. The onshore
facilities would be used to meet the
requirements of the customers of the
offshore facilities. The Certificate Order
required Delfin to construct and place
the facilities in service by September 28,
2019.
Delfin states that on June 21, 2019, it
requested an extension of time until
March 28, 2023 to complete the
construction of the onshore facilities in
conjunction with construction of the
offshore facilities. Delfin states that on
July 8, 2019, the Commission’s Office of
1 Delfin
E:\FR\FM\13JYN1.SGM
LNG LLC, 160 FERC ¶ 61,130 (2017).
13JYN1
Agencies
[Federal Register Volume 86, Number 131 (Tuesday, July 13, 2021)]
[Notices]
[Pages 36740-36741]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-14846]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP20-484-000; CP20-485-000]
ANR Pipeline Company; Great Lakes Transmission Limited
Partnership; Notice of Intent To Prepare an Environmental Impact
Statement for the Proposed Alberta Xpress and Lease Capacity
Abandonment Projects and Schedule for Environmental Review
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental impact statement (EIS) for
the Alberta Xpress and Lease Capacity Abandonment Projects (Projects),
proposed by ANR Pipeline Company (ANR) and Great Lakes Transmission
Limited Partnership (Great Lakes) in Evangeline Parish, Louisiana. The
EIS will tier off Commission staff's Environmental Assessment (EA) and
its findings and conclusions for the Project issued on December 4,
2020, and respond to comments filed on the EA.\1\ The EIS will assist
the Commission in its consideration of the Project's contribution to
climate change and its decision-making process to determine whether ANR
and Great Lakes proposed Projects are in the public convenience and
necessity. The schedule for preparation of the EIS is discussed in the
``Schedule for Environmental Review'' section of this notice.
---------------------------------------------------------------------------
\1\ The EA for the Project is filed in Docket Nos. CP20-484-000
and CP20-485-000 under Accession No. 20201204-3004.
---------------------------------------------------------------------------
The National Environmental Policy Act Process
The production of the EIS is part of the Commission's overall
National Environmental Policy Act review process. Commission staff will
independently analyze the proposed Project and prepare a draft EIS,
which will be issued for public comment. Commission staff will consider
all timely comments received during the comment period on the draft EIS
and revise the document, as necessary, before issuing a final EIS. Any
draft and final EIS will be available in electronic format in the
public record through eLibrary \2\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents).
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
``Additional Information'' section of this notice.
---------------------------------------------------------------------------
Schedule for Environmental Review
This notice identifies the Commission staff's planned schedule for
completion of a final EIS for the Project, which is based on an
issuance of the draft EIS in July 2020.
Issuance of Notice of Availability of the final EIS--October 29, 2021
90-day Federal Authorization Decision Deadline--January 27, 2022
If a schedule change becomes necessary for the final EIS, an
additional notice will be provided so that the relevant agencies are
kept informed of the Project's progress.
Environmental Mailing List
This notice is being sent to the Commission's current environmental
mailing list for the Project which includes federal, state, and local
government representatives and agencies; Native American Tribes;
elected officials; other interested parties; and local libraries and
newspapers. This list also includes all affected landowners (as defined
in the Commission's regulations) who are potential right-of-way
grantors, whose property may be used temporarily for Project purposes,
or who own homes within certain distances of aboveground facilities,
and anyone who submits comments on the Project and includes a mailing
address with their comments. Commission staff will update the
[[Page 36741]]
environmental mailing list as the analysis proceeds to ensure that
Commission notices related to this environmental review are sent to all
individuals, organizations, and government entities interested in and/
or potentially affected by the proposed Project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please complete one of
the following steps:
(1) Send an email to [email protected] stating your
request. You must include the docket numbers CP20-484-000 or CP20-485-
000 in your request. If you are requesting a change to your address,
please be sure to include your name and the correct address. If you are
requesting to delete your address from the mailing list, please include
your name and address as it appeared on this notice. This email address
is unable to accept comments. OR
(2) Return the attached ``Mailing List Update Form'' (appendix 1).
Additional Information
In order to receive notification of the issuance of the EIS and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Additional information about the Project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Dated: July 7, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-14846 Filed 7-12-21; 8:45 am]
BILLING CODE 6717-01-P