BOST5 Hydroelectric LLC; Notice of Application for Amendment of License, Soliciting Comments, Motions To Intervene, and Protests, 36544 [2021-14718]
Download as PDF
36544
Federal Register / Vol. 86, No. 130 / Monday, July 12, 2021 / Notices
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: July 6, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–14759 Filed 7–9–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12758–007]
khammond on DSKJM1Z7X2PROD with NOTICES
BOST5 Hydroelectric LLC; Notice of
Application for Amendment of License,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Application for
non-capacity amendment of license.
b. Project No.: 12758–007.
c. Date Filed: February 9, 2021, as
supplemented on February 22, 2021.
d. Licensee: BOST5 Hydroelectric
LLC.
e. Name of Project: Red River Lock
and Dam No. 5 Hydroelectric Project.
f. Location: The project is located at
the U.S. Army Corps of Engineers’
(Corps) Lock and Dam No. 5, on the Red
River near the town of Ninock, in
Bossier Parish, Louisiana.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Licensee Contact: Douglas A.
Spaulding, P.E., Nelson Energy LLC,
8441 Wayzata Blvd., Suite 101, Golden
Valley, MN 55426, (952) 544–8133.
i. FERC Contact: Christopher Chaney,
(202) 502–6778, christopher.chaney@
ferc.gov.
VerDate Sep<11>2014
17:26 Jul 09, 2021
Jkt 253001
j. Deadline for filing comments,
interventions, and protests: Deadline for
filing comments, motions to intervene,
and protests is 30 days from the
issuance of this notice by the
Commission.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. The first page of
any filing should include docket
number P–12758–007. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee proposes certain design
changes to the project; however, the
authorized installed capacity would
remain as licensed. The licensee
proposes to: (1) Install five 5.63megawatt (MW) Kaplan bulb turbinegenerator units, instead of one 28.1–MW
unit; (2) shift the powerhouse location
approximately 300 feet, and change the
footprint from 301 feet long by 90 feet
wide to 204 feet long by 153 feet wide;
(3) shift the location of the Corps’
recreation facilities the licensee is
required to reconstruct from
downstream to upstream of the dam;
and (4) reduce the project’s total
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
hydraulic capacity from 18,486 cubic
feet per second (cfs) to 17,650 cfs.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: July 6, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–14718 Filed 7–9–21; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\12JYN1.SGM
12JYN1
Agencies
[Federal Register Volume 86, Number 130 (Monday, July 12, 2021)]
[Notices]
[Page 36544]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-14718]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12758-007]
BOST5 Hydroelectric LLC; Notice of Application for Amendment of
License, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Application for non-capacity amendment of
license.
b. Project No.: 12758-007.
c. Date Filed: February 9, 2021, as supplemented on February 22,
2021.
d. Licensee: BOST5 Hydroelectric LLC.
e. Name of Project: Red River Lock and Dam No. 5 Hydroelectric
Project.
f. Location: The project is located at the U.S. Army Corps of
Engineers' (Corps) Lock and Dam No. 5, on the Red River near the town
of Ninock, in Bossier Parish, Louisiana.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Licensee Contact: Douglas A. Spaulding, P.E., Nelson Energy LLC,
8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426, (952) 544-8133.
i. FERC Contact: Christopher Chaney, (202) 502-6778,
[email protected].
j. Deadline for filing comments, interventions, and protests:
Deadline for filing comments, motions to intervene, and protests is 30
days from the issuance of this notice by the Commission.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. The first page of any filing should
include docket number P-12758-007. Comments emailed to Commission staff
are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee proposes certain design
changes to the project; however, the authorized installed capacity
would remain as licensed. The licensee proposes to: (1) Install five
5.63-megawatt (MW) Kaplan bulb turbine-generator units, instead of one
28.1-MW unit; (2) shift the powerhouse location approximately 300 feet,
and change the footprint from 301 feet long by 90 feet wide to 204 feet
long by 153 feet wide; (3) shift the location of the Corps' recreation
facilities the licensee is required to reconstruct from downstream to
upstream of the dam; and (4) reduce the project's total hydraulic
capacity from 18,486 cubic feet per second (cfs) to 17,650 cfs.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: July 6, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-14718 Filed 7-9-21; 8:45 am]
BILLING CODE 6717-01-P