Combined Notice of Filings #1, 35785-35786 [2021-14469]
Download as PDF
35785
Federal Register / Vol. 86, No. 127 / Wednesday, July 7, 2021 / Notices
FERC–725B—(MANDATORY RELIABILITY STANDARDS FOR CRITICAL INFRASTRUCTURE PROTECTION [CIP] RELIABILITY
STANDARDS) AFTER ADDING FILERS FROM CYBERSECURITY INCENTIVES INVESTMENT ACTIVITY (SUBMITTED AS A
SEPARATE IC WITHIN FERC–725B)—Continued
Number and
type of
respondent 14
Annual
number of
responses
per
respondent
Total
number of
responses
Average burden per
response (hours) 15
& cost per response
Total annual burden
(hours) & total
annual cost 16
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
343
1
343
600 21 hrs.; $51,012 ........
205,800 hrs.; $17,497,116.
343
23 724
1
1
1
343
321
724
30 hrs.; $2550.60 ...........
2 hrs.; $170.04 ...............
83 hrs.; $7,056.66 ..........
10,290 hrs.; $874,855.80.
642 hrs.; $54,582.84.
60,092 hrs., $5,109,021.84.
........................
........................
347,923
.........................................
817,437 hrs.; $69,498,493.74.
CIP–002–5.1,
CIP–004–6,
CIP–005–7,
CIP–006–6,
CIP–007–6,
CIP–008–6,
CIP–009–6, CIP–010–3, CIP–011–2.
CIP–013–1 ....................................................
CIP–014–2 ....................................................
CIP–012–1 ....................................................
Total Burden of FERC–725B ................
22 321
khammond on DSKJM1Z7X2PROD with NOTICES
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
14 The number of respondents is based on the
NERC Compliance Registry as of June 22, 2021.
Currently there are 1,508 unique NERC Registered,
subtracting 16 Canadians Entities yields 1492 U.S.
entities.
15 Of the average estimated 295.702 hours per
response, 210 hours are for recordkeeping, and
85.702 hours are for reporting.
16 The estimates for cost per hour are $85.02/hour
(averaged based on the following occupations):
• Manager (Occupational Code: 11–0000):
$97.89/hour; and
• Electrical Engineer (Occupational Code 17–
2071): $72.15/hour, from the Bureau of Labor and
Statistics at https://bls.gov/oes/current/naics3_
221000.htm, as of June 2021.
17 Updates and reviews of low impact TCA assets
(ongoing)
18 We estimate that 1,161 entities will face an
increased paperwork burden under Reliability
Standard CIP 003–8, estimating that a majority of
these entities will have one or more low impact BES
Cyber Systems.
19 Update paperwork for access control
implementation in Section 2 and Section 3
(ongoing)
20 Modification and approval of cybersecurity
policies for all CIP Standards
21 600 hr. estimate is based on ongoing burden
estimate from Order No. 791, added to the 3-year
audit burden split over 3 years: 600 = (640/3) +
(408¥(20 + 1)). (20 + 1) is the CIP–003–8 burden.
22 321 U.S. Transmission Owners in NERC
Compliance Registry as of June 22, 2021.
23 The number of entities and the number of
hours required are based on FERC Order No. 802
which approved CIP–012–1.
VerDate Sep<11>2014
17:44 Jul 06, 2021
Jkt 253001
Dated: June 30, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–14477 Filed 7–6–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1186–012;
ER10–1329–012; ER11–2731–005;
ER11–3097–013.
Applicants: DTE Energy Supply, Inc.,
DTE Electric Company, DTE Energy
Trading, Inc., DTE Garden Wind Farm,
LLC, DTE Stoney Corners Wind Farm,
LLC, St. Paul Cogeneration, LLC.
Description: Triennial Market Power
Analysis for Central Region of DTE
Energy Supply, Inc., et al.
Filed Date: 6/29/21.
Accession Number: 20210629–5267.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER10–1520–006;
ER10–1521–006; ER10–1522–005;
ER20–2493–001.
Applicants: Occidental Power
Services, Inc., Occidental Power
Marketing, L.P., Occidental Chemical
Corporation, OTCF, LLC.
Description: Triennial Market Power
Analysis for Central Region of
Occidental Power Services, Inc., et al.
Filed Date: 6/29/21.
Accession Number: 20210629–5214.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER10–1581–025;
ER10–2265–019; ER11–1846–010;
ER11–1847–010; ER11–1850–010;
ER11–2062–027; ER11–2175–005;
ER11–2176–004; ER11–2598–013;
ER11–3188–005; ER11–3418–007;
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
ER11–4307–028; ER11–4308–028;
ER12–224–006; ER12–225–006; ER12–
2301–005; ER12–261–027; ER13–1192–
007; ER17–764–005; ER17–765–005;
ER17–767–005; ER18–1160–003.
Applicants: NRG Power Marketing
LLC, Direct Energy Business, LLC,
Direct Energy Business Marketing, LLC,
Direct Energy Marketing Inc., Direct
Energy Services, LLC, Energy Plus
Holdings LLC, Gateway Energy Services
Corporation, Green Mountain Energy
Company, Independence Energy Group
LLC, Long Beach Peakers LLC, NRG
Cottonwood Tenant LLC, Reliant Energy
Northeast LLC, SGE Energy Sourcing,
LLC, Stream Energy Columbia, LLC,
Stream Energy Delaware, LLC, Stream
Energy Illinois, LLC, Stream Energy
Maryland, LLC, Stream Energy New
Jersey, LLC, Stream Energy New York,
LLC, Stream Energy Pennsylvania, LLC,
Stream Ohio Gas & Electric, LLC, XOOM
Energy, LLC.
Description: Triennial Market Power
Analysis for Central Region of Long
Beach Peakers LLC, et al.
Filed Date: 6/29/21.
Accession Number: 20210629–5266.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER10–1874–013;
ER19–9–007.
Applicants: Mankato Energy Center,
LLC, Mankato Energy Center II, LLC.
Description: Triennial Market Power
Analysis for Central Region of Mankato
Energy Center, LLC, et al.
Filed Date: 6/29/21.
Accession Number: 20210629–5264.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER10–2742–016;
ER14–153–010; ER14–154–010; ER16–
517–005.
Applicants: Tilton Energy LLC,
Gibson City Energy Center, LLC, Grand
Tower Energy Center, LLC, Shelby
County Energy Center, LLC, Southern
Illinois Generation Company, LLC.
E:\FR\FM\07JYN1.SGM
07JYN1
khammond on DSKJM1Z7X2PROD with NOTICES
35786
Federal Register / Vol. 86, No. 127 / Wednesday, July 7, 2021 / Notices
Description: Triennial Market Power
Analysis for Central Region of Tilton
Energy, LLC, et al.
Filed Date: 6/29/21.
Accession Number: 20210629–5265.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER17–1442–003.
Applicants: Axiall, LLC.
Description: Triennial Market Power
Analysis for Central Region of Axiall,
LLC.
Filed Date: 6/29/21.
Accession Number: 20210629–5215.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER21–1264–002.
Applicants: Duke Energy Indiana,
LLC.
Description: Tariff Amendment:
Amendment to Annual Reconciliation
Filing to be effective 7/1/2020.
Filed Date: 6/29/21.
Accession Number: 20210629–5167.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–1848–000.
Applicants: Isabella Wind, LLC.
Description: Report Filing: Isabella
Wind Supplemental MBR Cancellation
Filing to be effective N/A.
Filed Date: 6/30/21.
Accession Number: 20210630–5000.
Comments Due: 5 p.m. ET 7/21/21.
Docket Numbers: ER21–2264–000.
Applicants: Terra-Gen Energy
Services, LLC.
Description: Tariff Cancellation:
Notice of Cancellation to be effective 6/
30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5213.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2265–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1885R11 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5222.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2266–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1893R11 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5240.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2267–000.
Applicants: New England Power Pool
Participants Committee.
Description: § 205(d) Rate Filing: June
2021 Membership Filing to be effective
6/1/2021.
Filed Date: 6/30/21.
Accession Number: 20210630–5001.
Comments Due: 5 p.m. ET 7/21/21.
VerDate Sep<11>2014
17:44 Jul 06, 2021
Jkt 253001
Docket Numbers: ER21–2268–000.
Applicants: City of Independence,
Missouri.
Description: Request For Waiver of
Tariff Provisions, et al. of City of
Independence Missouri.
Filed Date: 6/29/21.
Accession Number: 20210629–5259.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2269–000.
Applicants: Orangeville Energy
Storage LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 8/30/2021.
Filed Date: 6/30/21.
Accession Number: 20210630–5012.
Comments Due: 5 p.m. ET 7/21/21.
Docket Numbers: ER21–2270–000.
Applicants: Jayhawk Wind, LLC.
Description: Baseline eTariff Filing:
Filing of Market-Based Rate Application
to be effective 8/30/2021.
Filed Date: 6/30/21.
Accession Number: 20210630–5018.
Comments Due: 5 p.m. ET 7/21/21.
Docket Numbers: ER21–2271–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, Service Agreement No.
6105; Queue No. AG1–336 to be
effective 6/21/2021.
Filed Date: 6/30/21.
Accession Number: 20210630–5032.
Comments Due: 5 p.m. ET 7/21/21.
Docket Numbers: ER21–2272–000.
Applicants: Golden Hills Wind Farm,
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization, Request for Related
Waivers to be effective 8/30/2021.
Filed Date: 6/30/21.
Accession Number: 20210630–5044.
Comments Due: 5 p.m. ET 7/21/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
Dated: June 30, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–14469 Filed 7–6–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC21–21–000]
Commission Information Collection
Activities (FERC–516); Comment
Request; Revision
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection, FERC–
516 (Electric Rate Schedules and Tariff
Filings). Any interested person may file
comments directly with OMB and
should address a copy of those
comments to the Commission as
explained below.
DATES: Comments on the collection of
information are due August 6, 2021.
ADDRESSES: Send written comments on
FERC–516 to OMB through
www.reginfo.gov/public/do/PRAMain,
Attention: Federal Energy Regulatory
Commission Desk Officer. Please
identify the OMB control number
(1902–0096) in the subject line. Your
comments should be sent within 30
days of publication of this notice in the
Federal Register.
Please submit copies of your
comments (identified by Docket No.
IC21–21–000) to the Commission as
noted below. Electronic filing through
https://www.ferc.gov, is preferred.
• Electronic Filing: Documents must
be filed in acceptable native
applications and print-to-PDF, but not
in scanned or picture format.
• For those unable to file
electronically, comments may be filed
by USPS mail or by hand (including
courier) delivery.
Æ Mail via U.S. Postal Service Only:
Addressed to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (Including Courier) Delivery:
Deliver to: Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
SUMMARY:
E:\FR\FM\07JYN1.SGM
07JYN1
Agencies
[Federal Register Volume 86, Number 127 (Wednesday, July 7, 2021)]
[Notices]
[Pages 35785-35786]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-14469]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1186-012; ER10-1329-012; ER11-2731-005; ER11-
3097-013.
Applicants: DTE Energy Supply, Inc., DTE Electric Company, DTE
Energy Trading, Inc., DTE Garden Wind Farm, LLC, DTE Stoney Corners
Wind Farm, LLC, St. Paul Cogeneration, LLC.
Description: Triennial Market Power Analysis for Central Region of
DTE Energy Supply, Inc., et al.
Filed Date: 6/29/21.
Accession Number: 20210629-5267.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER10-1520-006; ER10-1521-006; ER10-1522-005; ER20-
2493-001.
Applicants: Occidental Power Services, Inc., Occidental Power
Marketing, L.P., Occidental Chemical Corporation, OTCF, LLC.
Description: Triennial Market Power Analysis for Central Region of
Occidental Power Services, Inc., et al.
Filed Date: 6/29/21.
Accession Number: 20210629-5214.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER10-1581-025; ER10-2265-019; ER11-1846-010; ER11-
1847-010; ER11-1850-010; ER11-2062-027; ER11-2175-005; ER11-2176-004;
ER11-2598-013; ER11-3188-005; ER11-3418-007; ER11-4307-028; ER11-4308-
028; ER12-224-006; ER12-225-006; ER12-2301-005; ER12-261-027; ER13-
1192-007; ER17-764-005; ER17-765-005; ER17-767-005; ER18-1160-003.
Applicants: NRG Power Marketing LLC, Direct Energy Business, LLC,
Direct Energy Business Marketing, LLC, Direct Energy Marketing Inc.,
Direct Energy Services, LLC, Energy Plus Holdings LLC, Gateway Energy
Services Corporation, Green Mountain Energy Company, Independence
Energy Group LLC, Long Beach Peakers LLC, NRG Cottonwood Tenant LLC,
Reliant Energy Northeast LLC, SGE Energy Sourcing, LLC, Stream Energy
Columbia, LLC, Stream Energy Delaware, LLC, Stream Energy Illinois,
LLC, Stream Energy Maryland, LLC, Stream Energy New Jersey, LLC, Stream
Energy New York, LLC, Stream Energy Pennsylvania, LLC, Stream Ohio Gas
& Electric, LLC, XOOM Energy, LLC.
Description: Triennial Market Power Analysis for Central Region of
Long Beach Peakers LLC, et al.
Filed Date: 6/29/21.
Accession Number: 20210629-5266.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER10-1874-013; ER19-9-007.
Applicants: Mankato Energy Center, LLC, Mankato Energy Center II,
LLC.
Description: Triennial Market Power Analysis for Central Region of
Mankato Energy Center, LLC, et al.
Filed Date: 6/29/21.
Accession Number: 20210629-5264.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER10-2742-016; ER14-153-010; ER14-154-010; ER16-
517-005.
Applicants: Tilton Energy LLC, Gibson City Energy Center, LLC,
Grand Tower Energy Center, LLC, Shelby County Energy Center, LLC,
Southern Illinois Generation Company, LLC.
[[Page 35786]]
Description: Triennial Market Power Analysis for Central Region of
Tilton Energy, LLC, et al.
Filed Date: 6/29/21.
Accession Number: 20210629-5265.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER17-1442-003.
Applicants: Axiall, LLC.
Description: Triennial Market Power Analysis for Central Region of
Axiall, LLC.
Filed Date: 6/29/21.
Accession Number: 20210629-5215.
Comments Due: 5 p.m. ET 8/30/21.
Docket Numbers: ER21-1264-002.
Applicants: Duke Energy Indiana, LLC.
Description: Tariff Amendment: Amendment to Annual Reconciliation
Filing to be effective 7/1/2020.
Filed Date: 6/29/21.
Accession Number: 20210629-5167.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-1848-000.
Applicants: Isabella Wind, LLC.
Description: Report Filing: Isabella Wind Supplemental MBR
Cancellation Filing to be effective N/A.
Filed Date: 6/30/21.
Accession Number: 20210630-5000.
Comments Due: 5 p.m. ET 7/21/21.
Docket Numbers: ER21-2264-000.
Applicants: Terra-Gen Energy Services, LLC.
Description: Tariff Cancellation: Notice of Cancellation to be
effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5213.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2265-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1885R11 Evergy Kansas
Central, Inc. NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5222.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2266-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1893R11 Evergy Kansas
Central, Inc. NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5240.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2267-000.
Applicants: New England Power Pool Participants Committee.
Description: Sec. 205(d) Rate Filing: June 2021 Membership Filing
to be effective 6/1/2021.
Filed Date: 6/30/21.
Accession Number: 20210630-5001.
Comments Due: 5 p.m. ET 7/21/21.
Docket Numbers: ER21-2268-000.
Applicants: City of Independence, Missouri.
Description: Request For Waiver of Tariff Provisions, et al. of
City of Independence Missouri.
Filed Date: 6/29/21.
Accession Number: 20210629-5259.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2269-000.
Applicants: Orangeville Energy Storage LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 8/30/2021.
Filed Date: 6/30/21.
Accession Number: 20210630-5012.
Comments Due: 5 p.m. ET 7/21/21.
Docket Numbers: ER21-2270-000.
Applicants: Jayhawk Wind, LLC.
Description: Baseline eTariff Filing: Filing of Market-Based Rate
Application to be effective 8/30/2021.
Filed Date: 6/30/21.
Accession Number: 20210630-5018.
Comments Due: 5 p.m. ET 7/21/21.
Docket Numbers: ER21-2271-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original WMPA, Service
Agreement No. 6105; Queue No. AG1-336 to be effective 6/21/2021.
Filed Date: 6/30/21.
Accession Number: 20210630-5032.
Comments Due: 5 p.m. ET 7/21/21.
Docket Numbers: ER21-2272-000.
Applicants: Golden Hills Wind Farm, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization, Request for Related Waivers to be effective 8/30/
2021.
Filed Date: 6/30/21.
Accession Number: 20210630-5044.
Comments Due: 5 p.m. ET 7/21/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 30, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-14469 Filed 7-6-21; 8:45 am]
BILLING CODE 6717-01-P