Combined Notice of Filings #2, 35790-35791 [2021-14372]
Download as PDF
35790
Federal Register / Vol. 86, No. 127 / Wednesday, July 7, 2021 / Notices
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 29, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–14373 Filed 7–6–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: ER21–2246–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1894R10 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5116.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2247–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1897R11 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5122.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2248–000.
Applicants: PacifiCorp.
Description: Tariff Cancellation:
Termination of UAMPS Const Agmt for
Heber 2nd POD to be effective 9/6/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5123.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2249–000.
Applicants: Kentucky Utilities
Company.
VerDate Sep<11>2014
17:44 Jul 06, 2021
Jkt 253001
Description: § 205(d) Rate Filing:
Revisions to Wholesale Requirements
Service Bardstown and Nicholasville to
be effective 7/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5127.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2250–000.
Applicants: Sayreville Power LP.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
Tariffs (I) to be effective 5/18/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5128.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2251–000.
Applicants: American Transmission
Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI submits Two ECSAs, SA Nos.
5951 and 5952 to be effective 8/29/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5130.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2252–000.
Applicants: Sayreville Power LP.
Description: § 205(d) Rate Filing:
Notice of Succession and Revisions to
Tariffs (II) to be effective 5/18/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5129.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2253–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1892R10 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5136.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2254–000.
Applicants: Assembly Solar I, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5150.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2255–000.
Applicants: Dressor Plains Solar, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5144.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2256–000.
Applicants: Iris Solar, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5145.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2257–000.
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
Applicants: North Star Solar PV LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5146.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2258–000.
Applicants: NRG Cottonwood Tenant
LLC.
Description: § 205(d) Rate Filing:
Market-Based Rate Tariff Revisions to be
effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5151.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2259–000.
Applicants: Prairie State Solar, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5155.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2260–000.
Applicants: St. James Solar, LLC.
Description: § 205(d) Rate Filing:
Revised Market-Based Rate Tariff Filing
to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5157.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2261–000.
Applicants: Exelon Generation
Company, LLC.
Description: § 205(d) Rate Filing:
Reactive Service Rate Schedule Filing
for Deactivation of Units to be effective
9/14/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5158.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2262–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2045R10 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5169.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21–2263–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1978R10 Evergy Kansas Central, Inc.
NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629–5189.
Comments Due: 5 p.m. ET 7/20/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene or
protest in any of the above proceedings
E:\FR\FM\07JYN1.SGM
07JYN1
Federal Register / Vol. 86, No. 127 / Wednesday, July 7, 2021 / Notices
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 29, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–14372 Filed 7–6–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC21–18–000]
Commission Information Collection
Activities (FERC–725Y); Comment
Request; Extension
Federal Energy Regulatory
Commission.
ACTION: Notice of information collection
and request for comments.
AGENCY:
In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on a renewal of
currently approved information
collection FERC–725Y, Mandatory
Reliability Standard (Personnel
Performance, Training, and
Qualifications), which will be submitted
to the Office of Management and Budget
(OMB) for review.
DATES: Comments on the collection of
information are due August 6, 2021.
ADDRESSES: Send written comments on
FERC–725Y to OMB through
www.reginfo.gov/public/do/PRAMain.
Attention: Federal Energy Regulatory
Commission Desk Officer. Please
identify the OMB Control Number
(1902–0279) in the subject line of your
comments. Comments should be sent
within 30 days of publication of this
notice to www.reginfo.gov/public/do/
PRAMain.
Please submit copies of your
comments to the Commission. You may
submit copies of your comments
khammond on DSKJM1Z7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:44 Jul 06, 2021
Jkt 253001
(identified by Docket No. IC21–18–000)
by one of the following methods:
Electronic filing through https://
www.ferc.gov, is preferred.
• Electronic Filing: Documents must
be filed in acceptable native
applications and print-to-PDF, but not
in scanned or picture format.
• For those unable to file
electronically, comments may be filed
by USPS mail or by hand (including
courier) delivery.
Æ Mail via U.S. Postal Service Only:
Addressed to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE,
Washington, DC 20426.
Æ Hand (including courier) Delivery:
Deliver to: Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852.
Instructions: OMB submissions must
be formatted and filed in accordance
with submission guidelines at
www.reginfo.gov/public/do/PRAMain.
Using the search function under the
‘‘Currently Under Review’’ field, select
Federal Energy Regulatory Commission;
click ‘‘submit,’’ and select ‘‘comment’’
to the right of the subject collection.
FERC submissions must be formatted
and filed in accordance with submission
guidelines at: https://www.ferc.gov. For
user assistance, contact FERC Online
Support by email at ferconlinesupport@
ferc.gov, or by phone at: (866) 208–3676
(toll-free).
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at https://www.ferc.gov/ferconline/overview.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at DataClearance@FERC.gov, telephone
at (202) 502–8663.
SUPPLEMENTARY INFORMATION:
Title: FERC–725Y, Mandatory
Reliability Standard (Personnel
Performance, Training, and
Qualifications).
OMB Control No.: 1902–0279.
Type of Request: Three-year extension
of the FERC–725Y information
collection requirements with no changes
to the reporting requirements.
Abstract: The FERC–725Y
information collection is intended to
help ensure the safe and reliable
operation of the interconnected grid
through the retention of suitably trained
and qualified personnel in positions
that can impact the reliable operation of
the Bulk-Power System. The
Commission uses the FERC–725Y to
implement the Congressional mandate
of the Energy Policy Act of 2005 to
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
35791
develop mandatory and enforceable
Reliability Standards to better ensure
the reliability of the nation’s BulkPower System. FERC–725Y ensures that
personnel performing or supporting
real-time operations on the Bulk Electric
System (BES) are trained using a
systematic approach. The Reliability
Standard requires entities to maintain
records subject to review by the
Commission and North American
Electric Reliability Corporation (NERC)
to ensure compliance with the
Reliability Standard.
Reliability Standard PER–005–2
(Operations Personnel Training)
requires entities to maintain records
subject to review by the Commission
and NERC to ensure compliance with
the Reliability Standard. This Reliability
Standard contains of six Requirements:
• R1 requires reliability coordinators,
balancing authorities, and
transmission operators to develop and
implement a training program for
system operators
• R2 requires transmission owners to
develop and implement a training
program for system operators
• R3 requires reliability coordinators,
balancing authorities, transmission
operators and transmission owners to
verify the capabilities of their
identified personnel
• R4 requires reliability coordinators,
balancing authorities, transmission
operators and transmission owners to
provide those personnel with
emergency operations training using
simulation technology
• R5 requires reliability coordinators,
balancing authorities, and
transmission operators develop and
implement training for system
operators whose job functions can
impact BES real-time reliability tasks
• R6 requires applicable generator
operators to develop and implement
training for certain of their dispatch
personnel at a centrally located
dispatch center
Reliability Standard PER–006–1
(Specific Training for personnel)
ensures that personnel are trained on
specific topics essential to reliability to
perform or support Real-Time
operations of the Bulk Electric System.
• R1 identifies generator operator
plant personnel responsible for Realtime control and carrying out Operating
instructions are trained on the
operational functionality of Protection
Systems and Remedial Action Schemes
that affect the output of generating
facility(ies) it operates.
E:\FR\FM\07JYN1.SGM
07JYN1
Agencies
[Federal Register Volume 86, Number 127 (Wednesday, July 7, 2021)]
[Notices]
[Pages 35790-35791]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-14372]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: ER21-2246-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1894R10 Evergy Kansas
Central, Inc. NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5116.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2247-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1897R11 Evergy Kansas
Central, Inc. NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5122.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2248-000.
Applicants: PacifiCorp.
Description: Tariff Cancellation: Termination of UAMPS Const Agmt
for Heber 2nd POD to be effective 9/6/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5123.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2249-000.
Applicants: Kentucky Utilities Company.
Description: Sec. 205(d) Rate Filing: Revisions to Wholesale
Requirements Service Bardstown and Nicholasville to be effective 7/1/
2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5127.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2250-000.
Applicants: Sayreville Power LP.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to Tariffs (I) to be effective 5/18/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5128.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2251-000.
Applicants: American Transmission Systems, Incorporated, PJM
Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: ATSI submits Two ECSAs, SA
Nos. 5951 and 5952 to be effective 8/29/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5130.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2252-000.
Applicants: Sayreville Power LP.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revisions to Tariffs (II) to be effective 5/18/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5129.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2253-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1892R10 Evergy Kansas
Central, Inc. NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5136.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2254-000.
Applicants: Assembly Solar I, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5150.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2255-000.
Applicants: Dressor Plains Solar, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5144.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2256-000.
Applicants: Iris Solar, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5145.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2257-000.
Applicants: North Star Solar PV LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5146.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2258-000.
Applicants: NRG Cottonwood Tenant LLC.
Description: Sec. 205(d) Rate Filing: Market-Based Rate Tariff
Revisions to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5151.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2259-000.
Applicants: Prairie State Solar, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5155.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2260-000.
Applicants: St. James Solar, LLC.
Description: Sec. 205(d) Rate Filing: Revised Market-Based Rate
Tariff Filing to be effective 6/30/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5157.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2261-000.
Applicants: Exelon Generation Company, LLC.
Description: Sec. 205(d) Rate Filing: Reactive Service Rate
Schedule Filing for Deactivation of Units to be effective 9/14/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5158.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2262-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 2045R10 Evergy Kansas
Central, Inc. NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5169.
Comments Due: 5 p.m. ET 7/20/21.
Docket Numbers: ER21-2263-000.
Applicants: Southwest Power Pool, Inc.
Description: Sec. 205(d) Rate Filing: 1978R10 Evergy Kansas
Central, Inc. NITSA NOA to be effective 9/1/2021.
Filed Date: 6/29/21.
Accession Number: 20210629-5189.
Comments Due: 5 p.m. ET 7/20/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings
[[Page 35791]]
must file in accordance with Rules 211 and 214 of the Commission's
Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date. Protests may be considered, but
intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: June 29, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-14372 Filed 7-6-21; 8:45 am]
BILLING CODE 6717-01-P