Actions Taken at June 17, 2021, Meeting, 34302-34303 [2021-13829]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
34302
Federal Register / Vol. 86, No. 122 / Tuesday, June 29, 2021 / Notices
Consumptive Use of Up to 7.50000 mgd;
Approval Date: May 7, 2021.
9. Pennsylvania General Energy
Company, L.L.C.; Pad ID: COP Tract 293
Pad F; ABR–201105001.R2; Cummings
Township, Lycoming County, Pa.;
Consumptive Use of Up to 3.0000 mgd;
Approval Date: May 7, 2021.
10. Cabot Oil & Gas Corporation; Pad
ID: GeigerK P1; ABR–202105001;
Bridgewater Township, Susquehanna
County, Pa.; Consumptive Use of Up to
5.0000 mgd; Approval Date: May 7,
2021.
11. M4 Energy, LLC; Pad ID: TrianaYoung Pad A; ABR–20100677.R2;
Hector Township, Potter County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: May 10, 2021.
12. Range Resources—Appalachia,
LLC; Pad ID: Shipman, James Unit
#1H—#2H Drilling Pad; ABR–
201104014.R2; Lewis Township,
Lycoming County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval
Date: May 10, 2021.
13. Range Resources—Appalachia,
LLC; Pad ID: Null, Eugene Unit #2H–
#7H Drilling Pad; ABR–201104011.R2;
Lewis Township, Lycoming County, Pa.;
Consumptive Use of Up to 4.0000 mgd;
Approval Date: May 10, 2021.
14. Chesapeake Appalachia, L.L.C.;
Pad ID: Hess; ABR–201105004.R2; Rome
Township, Bradford County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: May 11, 2021.
15. Chesapeake Appalachia, L.L.C.;
Pad ID: Ramblinrose; ABR–
201105003.R2; Tuscarora Township,
Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date:
May 11, 2021.
16. Chief Oil & Gas, LLC; Pad ID:
SGL–12 M NORTH UNIT PAD B; ABR–
202105002; Leroy Township, Bradford
County, Pa.; Consumptive Use of Up to
2.5000 mgd; Approval Date: May 11,
2021.
17. Chesapeake Appalachia, L.L.C.;
Pad ID: Lomison Inc.; ABR–
201105023.R2; Burlington Township,
Bradford County, Pa.; Consumptive Use
of Up to 7.5000 mgd; Approval Date:
May 27, 2021.
18. Chesapeake Appalachia, L.L.C.;
Pad ID: LRJ; ABR–201105011.R2; Rush
Township, Susquehanna County, Pa.;
Consumptive Use of Up to 7.5000 mgd;
Approval Date: May 27, 2021.
19. SWN Production Company, LLC;
Pad ID: Sadecki Well Pad; ABR–
201105020.R2; Liberty Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval
Date: May 27, 2021.
20. Chesapeake Appalachia, L.L.C.;
Pad ID: Karp; ABR–201105027.R2;
Lemon Township, Wyoming County,
VerDate Sep<11>2014
18:06 Jun 28, 2021
Jkt 253001
Pa.; Consumptive Use of Up to 7.5000
mgd; Approval Date: May 31, 2021.
21. SWN Production Company, LLC;
Pad ID: Mitchell Well Pad; ABR–
201105026.R2; Franklin Township,
Susquehanna County, Pa.; Consumptive
Use of Up to 4.0000 mgd; Approval
Date: May 31, 2021.
Approvals By Rule—Issued Under 18
CFR 806.22(f)—Revocation
1. Seneca Resources Company, LLC;
Pad ID: Hector 2; ABR–201605004;
Hector Township, Potter County, Pa.;
Revocation Date: May 24, 2021.
2. Seneca Resources Company, LLC;
Pad ID: Swingle 591; ABR–
201012018.R2; Richmond Township,
Tioga County, Pa.; Revocation Date: May
24, 2021.
3. Seneca Resources Company, LLC;
Pad ID: Costanzo 818; ABR–
201006112.R1 Chatham Township,
Tioga County, Pa.; Revocation Date: May
25, 2021.
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806, 807, and 808.
Dated: June 24, 2021.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2021–13831 Filed 6–28–21; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Actions Taken at June 17, 2021,
Meeting
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
As part of its regular business
meeting held on June 17, 2021, from
Harrisburg, Pennsylvania, the
Commission approved the applications
of certain water resources projects, and
took additional actions, as set forth in
the SUPPLEMENTARY INFORMATION below.
DATES: June 17, 2021.
ADDRESSES: Susquehanna River Basin
Commission, 4423 N. Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel and
Secretary, telephone: (717) 238–0423,
ext. 1312, fax: (717) 238–2436; email:
joyler@srbc.net. Regular mail inquiries
may be sent to the above address. See
also Commission website at
www.srbc.net.
SUPPLEMENTARY INFORMATION: In
addition to the actions taken on projects
identified in the summary above and the
listings below, the following items were
SUMMARY:
PO 00000
Frm 00108
Fmt 4703
Sfmt 4703
also presented or acted upon at the
business meeting: (1) Election of
Commission officers for FY2022; (2)
reconciliation of the budget for FY2022;
(3) ratification of two grant
amendments; (4) adoption of a newly
revised Comprehensive Plan for the
Water Resources of the Susquehanna
River Basin for 2021 through 2041; (5)
adoption of the 2022–2024 Water
Resources Program; and (4) Adoption of
a Resolution regarding Environmental
Justice.
Project Applications Approved
1. Project Sponsor and Facility: ARD
Operating, LLC (West Branch
Susquehanna River), Piatt Township,
Lycoming County, Pa. Modification to
update flow protection rates to be in
accordance with current Low Flow
Protection Policy No. 2012–01 (Docket
No. 20120601).
2. Project Sponsor: CAN DO, Inc.
Project Facility: Humbolt Industrial
Park, Hazle Township, Luzerne County,
Pa. Applications for renewal of
groundwater withdrawals (30-day
averages) of up to 0.187 mgd from
Humbolt Well 1, up to 0.187 mgd from
Humbolt Well 3, up to 0.230 mgd from
Humbolt Well 7, up to 0.144 mgd from
Humbolt Well 8, and up to 0.230 mgd
from Humbolt Well 9 (Docket No.
19960501).
3. Project Sponsor and Facility:
Geneva Farm Golf Course, Inc., Dublin
District, Harford County, Md.
Application for renewal of consumptive
use of up to 0.099 mgd (30-day average)
(Docket No. 199110104).
4. Project Sponsor and Facility:
Greenfield Township Municipal
Authority, Greenfield Township, Blair
County, Pa. Application for
groundwater withdrawal of up to 0.499
mgd (30-day average) from Well PW–4.
5. Project Sponsor and Facility: PPG
Operations LLC (West Branch
Susquehanna River), Goshen Township,
Clearfield County, Pa. Application for
surface water withdrawal of up to 3.000
mgd (peak day).
6. Project Sponsor and Facility:
Quarryville Borough Authority,
Quarryville Borough, Lancaster County,
Pa. Application for renewal of
groundwater withdrawal of up to 0.250
mgd (30-day average) from Well 2
(Docket No. 19931102).
7. Project Sponsor and Facility: SUEZ
Water Owego-Nichols Inc., Village of
Owego and Town of Owego, Tioga
County, N.Y. Applications for
groundwater withdrawals (30-day
averages) of up to 0.880 mgd from Well
1, up to 1.115 mgd from Well 3, and up
to 0.710 mgd from Well 4.
E:\FR\FM\29JNN1.SGM
29JNN1
Federal Register / Vol. 86, No. 122 / Tuesday, June 29, 2021 / Notices
8. Project Sponsor: Weaverland Valley
Authority. Project Facility: Blue Ball
Water System, East Earl Township,
Lancaster County, Pa. Application for
groundwater withdrawal of up to 0.144
mgd (30-day average) from Well 4 as
well as recognizing historic withdrawals
from wells 1, 2 and 3.
Commission-Initiated Project Approval
Modifications
9. Project Sponsor and Facility:
Municipal Authority of the Borough of
Mansfield, Richmond Township, Tioga
County, Pa. Conforming the
grandfathered amount with the
forthcoming determination for a
withdrawal from Webster Reservoir up
to 0.311 mgd (30-day average) (Docket
No. 20130609).
10. Project Sponsor and Facility:
Williamsport Municipal Water
Authority, Williamsport City, Lycoming
County, Pa. Conforming the
grandfathered amounts with the
forthcoming determination for
withdrawals (30-day averages) from
Well 3 up to 0.940 mgd, from Well 4 up
to 0.940 mgd, from Well 5 up to 2.141
mgd, from Well 6 up to 0.687 mgd, from
Well 7 up to 2.254 mgd, from Well 8 up
to 0.987 mgd, from Well 9 up to 0.800
mgd, from Mosquito Creek up to 6.833
mgd, and from Hagermans Run up to
4.926 mgd (Docket No. 20110628).
Project Approval Tabled
11. Project Sponsor and Facility:
Pennsylvania State University, College
Township, Centre County, Pa.
Applications for renewal of
groundwater withdrawal of up to 0.960
mgd (30-day average) from Well UN–37
and consumptive use of up to 0.960 mgd
(peak day) (Docket No. 19890106–1).
Project Withdrawn
12. Project Sponsor and Facility:
Beech Resources, LLC (Lycoming
Creek), Lycoming Township, Lycoming
County, Pa. Application for surface
water withdrawal of up to 1.500 mgd
(peak day).
lotter on DSK11XQN23PROD with NOTICES1
Project Terminated
13. Project Sponsor and Facility: City
of Aberdeen, Harford County, Md.
Modifications to extend the approval
term of the consumptive use, surface
water withdrawal, and out-of-basin
diversion approval (Docket No.
20021210) to allow additional time for
evaluation of the continued use of the
source for the Aberdeen Proving
Ground-Aberdeen Area.
(Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806, 807, and 808.)
VerDate Sep<11>2014
18:06 Jun 28, 2021
Jkt 253001
Dated: June 24, 2021.
Jason E. Oyler,
General Counsel and Secretary to the
Commission.
[FR Doc. 2021–13829 Filed 6–28–21; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket No. FRA–2021–0006–N–6]
Proposed Agency Information
Collection Activities; Comment
Request
Federal Railroad
Administration (FRA), U.S. Department
of Transportation (DOT).
ACTION: Notice of information collection;
request for comment.
AGENCY:
Under the Paperwork
Reduction Act of 1995 (PRA) and its
implementing regulations, FRA seeks
approval of the Information Collection
Request (ICR) abstracted below. Before
submitting this ICR to the Office of
Management and Budget (OMB) for
approval, FRA is soliciting public
comment on specific aspects of the
activities identified in the ICR.
DATES: Interested persons are invited to
submit comments on or before August
30, 2021.
ADDRESSES: Written comments and
recommendations for the proposed ICR
should be submitted on regulations.gov
to the docket, Docket No. FRA 2021–
0006. All comments received will be
posted without change to the docket,
including any personal information
provided. Please refer to the assigned
OMB control number in any
correspondence submitted. FRA will
summarize comments received in
response to this notice in a subsequent
notice and include them in its
information collection submission to
OMB for approval.
FOR FURTHER INFORMATION CONTACT: Ms.
Hodan Wells, Information Collection
Clearance Officer, at email:
hodan.wells@dot.gov or telephone: (202)
493–0440.
SUPPLEMENTARY INFORMATION: The PRA,
44 U.S.C. 3501–3520, and its
implementing regulations, 5 CFR part
1320, require Federal agencies to
provide 60-days’ notice to the public to
allow comment on information
collection activities before seeking OMB
approval of the activities. See 44 U.S.C.
3506, 3507; 5 CFR 1320.8 through
1320.12. Specifically, FRA invites
interested parties to comment on the
following ICR regarding: (1) Whether the
SUMMARY:
PO 00000
Frm 00109
Fmt 4703
Sfmt 4703
34303
information collection activities are
necessary for FRA to properly execute
its functions, including whether the
activities will have practical utility; (2)
the accuracy of FRA’s estimates of the
burden of the information collection
activities, including the validity of the
methodology and assumptions used to
determine the estimates; (3) ways for
FRA to enhance the quality, utility, and
clarity of the information being
collected; and (4) ways for FRA to
minimize the burden of information
collection activities on the public,
including the use of automated
collection techniques or other forms of
information technology. See 44 U.S.C.
3506(c)(2)(A); 5 CFR 1320.8(d)(1).
FRA believes that soliciting public
comment may reduce the administrative
and paperwork burdens associated with
the collection of information that
Federal regulations mandate. In
summary, FRA reasons that comments
received will advance three objectives:
(1) Reduce reporting burdens; (2)
organize information collection
requirements in a ‘‘user-friendly’’ format
to improve the use of such information;
and (3) accurately assess the resources
expended to retrieve and produce
information requested. See 44 U.S.C.
3501.
The summary below describes the ICR
that FRA will submit for OMB clearance
as the PRA requires:
Title: Hours of Service Regulations.
OMB Control Number: 2130–0005.
Abstract: FRA’s hours of service
recordkeeping regulations (49 CFR part
228), amended as mandated by the Rail
Safety Improvement Act of 2008,
include substantive hours of service
requirements for train employees (i.e.,
locomotive engineers and conductors)
providing commuter and intercity rail
passenger transportation (e.g., maximum
on-duty periods, minimum off-duty
periods, and other limitations). The
regulations also require railroads to
evaluate passenger train employee work
schedules for risk of employee fatigue
and implement measures to mitigate the
risk, and to submit to FRA for approval
certain schedules and mitigation plans.
Finally, the regulations include
recordkeeping and reporting provisions
requiring railroads to keep hours of
service records, and report excessive
service, for train employees, signal
employees, and dispatching service
employees on both freight and
passenger railroads.
FRA uses the information collected to
verify that railroads do not require or
allow their employees to exceed
maximum on-duty periods, and ensure
that they abide by minimum off-duty
periods, and adhere to other limitations
E:\FR\FM\29JNN1.SGM
29JNN1
Agencies
[Federal Register Volume 86, Number 122 (Tuesday, June 29, 2021)]
[Notices]
[Pages 34302-34303]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-13829]
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Actions Taken at June 17, 2021, Meeting
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: As part of its regular business meeting held on June 17, 2021,
from Harrisburg, Pennsylvania, the Commission approved the applications
of certain water resources projects, and took additional actions, as
set forth in the Supplementary Information below.
DATES: June 17, 2021.
ADDRESSES: Susquehanna River Basin Commission, 4423 N. Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel and
Secretary, telephone: (717) 238-0423, ext. 1312, fax: (717) 238-2436;
email: [email protected]. Regular mail inquiries may be sent to the above
address. See also Commission website at www.srbc.net.
SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects
identified in the summary above and the listings below, the following
items were also presented or acted upon at the business meeting: (1)
Election of Commission officers for FY2022; (2) reconciliation of the
budget for FY2022; (3) ratification of two grant amendments; (4)
adoption of a newly revised Comprehensive Plan for the Water Resources
of the Susquehanna River Basin for 2021 through 2041; (5) adoption of
the 2022-2024 Water Resources Program; and (4) Adoption of a Resolution
regarding Environmental Justice.
Project Applications Approved
1. Project Sponsor and Facility: ARD Operating, LLC (West Branch
Susquehanna River), Piatt Township, Lycoming County, Pa. Modification
to update flow protection rates to be in accordance with current Low
Flow Protection Policy No. 2012-01 (Docket No. 20120601).
2. Project Sponsor: CAN DO, Inc. Project Facility: Humbolt
Industrial Park, Hazle Township, Luzerne County, Pa. Applications for
renewal of groundwater withdrawals (30-day averages) of up to 0.187 mgd
from Humbolt Well 1, up to 0.187 mgd from Humbolt Well 3, up to 0.230
mgd from Humbolt Well 7, up to 0.144 mgd from Humbolt Well 8, and up to
0.230 mgd from Humbolt Well 9 (Docket No. 19960501).
3. Project Sponsor and Facility: Geneva Farm Golf Course, Inc.,
Dublin District, Harford County, Md. Application for renewal of
consumptive use of up to 0.099 mgd (30-day average) (Docket No.
199110104).
4. Project Sponsor and Facility: Greenfield Township Municipal
Authority, Greenfield Township, Blair County, Pa. Application for
groundwater withdrawal of up to 0.499 mgd (30-day average) from Well
PW-4.
5. Project Sponsor and Facility: PPG Operations LLC (West Branch
Susquehanna River), Goshen Township, Clearfield County, Pa. Application
for surface water withdrawal of up to 3.000 mgd (peak day).
6. Project Sponsor and Facility: Quarryville Borough Authority,
Quarryville Borough, Lancaster County, Pa. Application for renewal of
groundwater withdrawal of up to 0.250 mgd (30-day average) from Well 2
(Docket No. 19931102).
7. Project Sponsor and Facility: SUEZ Water Owego-Nichols Inc.,
Village of Owego and Town of Owego, Tioga County, N.Y. Applications for
groundwater withdrawals (30-day averages) of up to 0.880 mgd from Well
1, up to 1.115 mgd from Well 3, and up to 0.710 mgd from Well 4.
[[Page 34303]]
8. Project Sponsor: Weaverland Valley Authority. Project Facility:
Blue Ball Water System, East Earl Township, Lancaster County, Pa.
Application for groundwater withdrawal of up to 0.144 mgd (30-day
average) from Well 4 as well as recognizing historic withdrawals from
wells 1, 2 and 3.
Commission-Initiated Project Approval Modifications
9. Project Sponsor and Facility: Municipal Authority of the Borough
of Mansfield, Richmond Township, Tioga County, Pa. Conforming the
grandfathered amount with the forthcoming determination for a
withdrawal from Webster Reservoir up to 0.311 mgd (30-day average)
(Docket No. 20130609).
10. Project Sponsor and Facility: Williamsport Municipal Water
Authority, Williamsport City, Lycoming County, Pa. Conforming the
grandfathered amounts with the forthcoming determination for
withdrawals (30-day averages) from Well 3 up to 0.940 mgd, from Well 4
up to 0.940 mgd, from Well 5 up to 2.141 mgd, from Well 6 up to 0.687
mgd, from Well 7 up to 2.254 mgd, from Well 8 up to 0.987 mgd, from
Well 9 up to 0.800 mgd, from Mosquito Creek up to 6.833 mgd, and from
Hagermans Run up to 4.926 mgd (Docket No. 20110628).
Project Approval Tabled
11. Project Sponsor and Facility: Pennsylvania State University,
College Township, Centre County, Pa. Applications for renewal of
groundwater withdrawal of up to 0.960 mgd (30-day average) from Well
UN-37 and consumptive use of up to 0.960 mgd (peak day) (Docket No.
19890106-1).
Project Withdrawn
12. Project Sponsor and Facility: Beech Resources, LLC (Lycoming
Creek), Lycoming Township, Lycoming County, Pa. Application for surface
water withdrawal of up to 1.500 mgd (peak day).
Project Terminated
13. Project Sponsor and Facility: City of Aberdeen, Harford County,
Md. Modifications to extend the approval term of the consumptive use,
surface water withdrawal, and out-of-basin diversion approval (Docket
No. 20021210) to allow additional time for evaluation of the continued
use of the source for the Aberdeen Proving Ground-Aberdeen Area.
(Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 806,
807, and 808.)
Dated: June 24, 2021.
Jason E. Oyler,
General Counsel and Secretary to the Commission.
[FR Doc. 2021-13829 Filed 6-28-21; 8:45 am]