Record of Decision for the B-21 Main Operating Base 1 Beddown at Dyess AFB, Texas or Ellsworth AFB, South Dakota Environmental Impact Statement, 32250 [2021-12724]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 32250 Federal Register / Vol. 86, No. 115 / Thursday, June 17, 2021 / Notices OMB Control Number: 3045–0035. Type of Review: Renewal. Respondents/Affected Public: Businesses and Organizations OR State, Local or Tribal Governments. Total Estimated Number of Annual Responses: 1,250. Total Estimated Number of Annual Burden Hours: 17,820 hours. Abstract: The AmeriCorps Seniors Grant Application is for use by prospective and existing sponsors of AmeriCorps Seniors projects under the AmeriCorps Seniors RSVP (RSVP), AmeriCorps Seniors Foster Grandparent Program (FGP), AmeriCorps Seniors Senior Companion Program (SCP), and AmeriCorps Seniors Demonstration Project (SDP). The Project Progress Report, Project Progress Report Lite, and Project Report Supplement will be used to report progress toward accomplishing work plan goals and objectives, reporting volunteer and service outputs, reporting actual outcomes related to self-nominated performance measures, meeting challenges encountered, describing significant activities, and requesting technical assistance. The Application Instructions and PPR, PPRLite, and PRS forms in this package conform to eGrants. AmeriCorps’ webbased electronic grants management system. The SCP Independent Living Survey and SCP Respite Survey instruments collect information from a sample of Senior Companion clients and caregivers. The purpose of the surveys is to assess the feasibility of conducting a longitudinal, quasi-experimental evaluation of the impact of independent living and respite services on clients’ social ties and perceived social support. The results of the surveys may also be used to inform the feasibility of using a similar instrument to measure client and caregiver outcomes for an evaluation of RSVP. AmeriCorps also seeks to continue using the currently approved information collection until the revised information collection is approved by OMB. The currently approved information collection is due to expire on 12/31/21. Comments submitted in response to this notice will be summarized and/or included in the request for OMB approval. Comments are invited on: (a) Whether the collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency’s estimate of the burden of the collection of information; (c) ways to enhance the quality, utility, and clarity of the information to be collected; (d) ways to minimize the burden of the collection of information on VerDate Sep<11>2014 18:41 Jun 16, 2021 Jkt 253001 respondents, including through the use of automated collection techniques or other forms of information technology; and (e) estimates of capital or start-up costs and costs of operation, maintenance, and purchase of services to provide information. Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; to develop, acquire, install and utilize technology and systems for the purpose of collecting, validating and verifying information, processing and maintaining information, and disclosing and providing information; to train personnel and to be able to respond to a collection of information, to search data sources, to complete and review the collection of information; and to transmit or otherwise disclose the information. All written comments will be available for public inspection on regulations.gov. Dated: June 14, 2021. Atalaya Jones Sergi, Director, AmeriCorps Seniors. infrastructure projects on Ellsworth AFB, including the construction of a Weapons Generation Facility (WGF) at the South WGF Site location. The DAF decision documented in the ROD was based on matters discussed in the Final Environmental Impact Statement, inputs from Native American Tribes, members of the public, and regulatory agencies, and other relevant factors. The Final Environmental Impact Statement was made available to the public on March 19, 2021 through a Notice of Availability in the Federal Register (Volume 86, Number 52, pages 14908– 14909) with a waiting period that ended on April 19, 2021. Authority: This Notice of Availability is published pursuant to the regulations (40 CFR part 1506.6) implementing the provisions of the National Environmental Policy Act (42 U.S.C. 4321, et seq.) and the Air Force’s Environmental Impact Analysis Process (32 CFR parts 989.21(b) and 989.24(b)(7)). Adriane Paris, Acting Air Force Federal Register Liaison Officer. [FR Doc. 2021–12724 Filed 6–16–21; 8:45 am] BILLING CODE 5001–10–P [FR Doc. 2021–12802 Filed 6–16–21; 8:45 am] BILLING CODE 6050–28–P DEPARTMENT OF EDUCATION [Docket No.: ED–2021–SCC–0091] DEPARTMENT OF DEFENSE Department of the Air Force Record of Decision for the B–21 Main Operating Base 1 Beddown at Dyess AFB, Texas or Ellsworth AFB, South Dakota Environmental Impact Statement Department of the Air Force, Department of Defense. ACTION: Notice of availability of Record of Decision. AGENCY: On June 3, 2021, the Department of the Air Force (DAF) signed the Record of Decision (ROD) for the Environmental Impact Statement B– 21 Main Operating Base (MOB) 1 Beddown at Dyess AFB, Texas or Ellsworth AFB, South Dakota. ADDRESSES: Ms. Julianne Turko, AFCEC/CZN, 2261 Hughes Avenue, Suite 155, JBSA-Lackland Air Force Base, Texas 78236–9853, (210) 295– 3777, julianne.turko.1@us.af.mil. SUPPLEMENTARY INFORMATION: The DAF will beddown the B–21 MOB 1 under the USAF Global Strike Command at Ellsworth AFB, South Dakota. The B–21 MOB 1 beddown will include construction, demolition, and renovation of various facilities and SUMMARY: PO 00000 Frm 00007 Fmt 4703 Sfmt 4703 Agency Information Collection Activities; Comment Request; the College Assistance Migrant Program (CAMP) Annual Performance Report (APR) Office of Elementary and Secondary Education (OESE), Department of Education (ED). ACTION: Notice. AGENCY: In accordance with the Paperwork Reduction Act of 1995, ED is proposing an extension without change of a currently approved collection. DATES: Interested persons are invited to submit comments on or before August 16, 2021. ADDRESSES: To access and review all the documents related to the information collection listed in this notice, please use https://www.regulations.gov by searching the Docket ID number ED– 2021–SCC–0091. Comments submitted in response to this notice should be submitted electronically through the Federal eRulemaking Portal at https:// www.regulations.gov by selecting the Docket ID number or via postal mail, commercial delivery, or hand delivery. If the regulations.gov site is not available to the public for any reason, ED will temporarily accept comments at SUMMARY: E:\FR\FM\17JNN1.SGM 17JNN1

Agencies

[Federal Register Volume 86, Number 115 (Thursday, June 17, 2021)]
[Notices]
[Page 32250]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-12724]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Air Force


Record of Decision for the B-21 Main Operating Base 1 Beddown at 
Dyess AFB, Texas or Ellsworth AFB, South Dakota Environmental Impact 
Statement

AGENCY: Department of the Air Force, Department of Defense.

ACTION: Notice of availability of Record of Decision.

-----------------------------------------------------------------------

SUMMARY: On June 3, 2021, the Department of the Air Force (DAF) signed 
the Record of Decision (ROD) for the Environmental Impact Statement B-
21 Main Operating Base (MOB) 1 Beddown at Dyess AFB, Texas or Ellsworth 
AFB, South Dakota.

ADDRESSES: Ms. Julianne Turko, AFCEC/CZN, 2261 Hughes Avenue, Suite 
155, JBSA-Lackland Air Force Base, Texas 78236-9853, (210) 295-3777, 
[email protected].

SUPPLEMENTARY INFORMATION: The DAF will beddown the B-21 MOB 1 under 
the USAF Global Strike Command at Ellsworth AFB, South Dakota. The B-21 
MOB 1 beddown will include construction, demolition, and renovation of 
various facilities and infrastructure projects on Ellsworth AFB, 
including the construction of a Weapons Generation Facility (WGF) at 
the South WGF Site location. The DAF decision documented in the ROD was 
based on matters discussed in the Final Environmental Impact Statement, 
inputs from Native American Tribes, members of the public, and 
regulatory agencies, and other relevant factors. The Final 
Environmental Impact Statement was made available to the public on 
March 19, 2021 through a Notice of Availability in the Federal Register 
(Volume 86, Number 52, pages 14908-14909) with a waiting period that 
ended on April 19, 2021.

    Authority: This Notice of Availability is published pursuant to 
the regulations (40 CFR part 1506.6) implementing the provisions of 
the National Environmental Policy Act (42 U.S.C. 4321, et seq.) and 
the Air Force's Environmental Impact Analysis Process (32 CFR parts 
989.21(b) and 989.24(b)(7)).

Adriane Paris,
Acting Air Force Federal Register Liaison Officer.
[FR Doc. 2021-12724 Filed 6-16-21; 8:45 am]
BILLING CODE 5001-10-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.