Record of Decision for the B-21 Main Operating Base 1 Beddown at Dyess AFB, Texas or Ellsworth AFB, South Dakota Environmental Impact Statement, 32250 [2021-12724]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
32250
Federal Register / Vol. 86, No. 115 / Thursday, June 17, 2021 / Notices
OMB Control Number: 3045–0035.
Type of Review: Renewal.
Respondents/Affected Public:
Businesses and Organizations OR State,
Local or Tribal Governments.
Total Estimated Number of Annual
Responses: 1,250.
Total Estimated Number of Annual
Burden Hours: 17,820 hours.
Abstract: The AmeriCorps Seniors
Grant Application is for use by
prospective and existing sponsors of
AmeriCorps Seniors projects under the
AmeriCorps Seniors RSVP (RSVP),
AmeriCorps Seniors Foster Grandparent
Program (FGP), AmeriCorps Seniors
Senior Companion Program (SCP), and
AmeriCorps Seniors Demonstration
Project (SDP). The Project Progress
Report, Project Progress Report Lite, and
Project Report Supplement will be used
to report progress toward accomplishing
work plan goals and objectives,
reporting volunteer and service outputs,
reporting actual outcomes related to
self-nominated performance measures,
meeting challenges encountered,
describing significant activities, and
requesting technical assistance. The
Application Instructions and PPR, PPRLite, and PRS forms in this package
conform to eGrants. AmeriCorps’ webbased electronic grants management
system. The SCP Independent Living
Survey and SCP Respite Survey
instruments collect information from a
sample of Senior Companion clients and
caregivers. The purpose of the surveys
is to assess the feasibility of conducting
a longitudinal, quasi-experimental
evaluation of the impact of independent
living and respite services on clients’
social ties and perceived social support.
The results of the surveys may also be
used to inform the feasibility of using a
similar instrument to measure client
and caregiver outcomes for an
evaluation of RSVP. AmeriCorps also
seeks to continue using the currently
approved information collection until
the revised information collection is
approved by OMB. The currently
approved information collection is due
to expire on 12/31/21.
Comments submitted in response to
this notice will be summarized and/or
included in the request for OMB
approval. Comments are invited on: (a)
Whether the collection of information is
necessary for the proper performance of
the functions of the agency, including
whether the information shall have
practical utility; (b) the accuracy of the
agency’s estimate of the burden of the
collection of information; (c) ways to
enhance the quality, utility, and clarity
of the information to be collected; (d)
ways to minimize the burden of the
collection of information on
VerDate Sep<11>2014
18:41 Jun 16, 2021
Jkt 253001
respondents, including through the use
of automated collection techniques or
other forms of information technology;
and (e) estimates of capital or start-up
costs and costs of operation,
maintenance, and purchase of services
to provide information. Burden means
the total time, effort, or financial
resources expended by persons to
generate, maintain, retain, disclose or
provide information to or for a Federal
agency. This includes the time needed
to review instructions; to develop,
acquire, install and utilize technology
and systems for the purpose of
collecting, validating and verifying
information, processing and
maintaining information, and disclosing
and providing information; to train
personnel and to be able to respond to
a collection of information, to search
data sources, to complete and review
the collection of information; and to
transmit or otherwise disclose the
information. All written comments will
be available for public inspection on
regulations.gov.
Dated: June 14, 2021.
Atalaya Jones Sergi,
Director, AmeriCorps Seniors.
infrastructure projects on Ellsworth
AFB, including the construction of a
Weapons Generation Facility (WGF) at
the South WGF Site location. The DAF
decision documented in the ROD was
based on matters discussed in the Final
Environmental Impact Statement, inputs
from Native American Tribes, members
of the public, and regulatory agencies,
and other relevant factors. The Final
Environmental Impact Statement was
made available to the public on March
19, 2021 through a Notice of
Availability in the Federal Register
(Volume 86, Number 52, pages 14908–
14909) with a waiting period that ended
on April 19, 2021.
Authority: This Notice of Availability is
published pursuant to the regulations (40
CFR part 1506.6) implementing the
provisions of the National Environmental
Policy Act (42 U.S.C. 4321, et seq.) and the
Air Force’s Environmental Impact Analysis
Process (32 CFR parts 989.21(b) and
989.24(b)(7)).
Adriane Paris,
Acting Air Force Federal Register Liaison
Officer.
[FR Doc. 2021–12724 Filed 6–16–21; 8:45 am]
BILLING CODE 5001–10–P
[FR Doc. 2021–12802 Filed 6–16–21; 8:45 am]
BILLING CODE 6050–28–P
DEPARTMENT OF EDUCATION
[Docket No.: ED–2021–SCC–0091]
DEPARTMENT OF DEFENSE
Department of the Air Force
Record of Decision for the B–21 Main
Operating Base 1 Beddown at Dyess
AFB, Texas or Ellsworth AFB, South
Dakota Environmental Impact
Statement
Department of the Air Force,
Department of Defense.
ACTION: Notice of availability of Record
of Decision.
AGENCY:
On June 3, 2021, the
Department of the Air Force (DAF)
signed the Record of Decision (ROD) for
the Environmental Impact Statement B–
21 Main Operating Base (MOB) 1
Beddown at Dyess AFB, Texas or
Ellsworth AFB, South Dakota.
ADDRESSES: Ms. Julianne Turko,
AFCEC/CZN, 2261 Hughes Avenue,
Suite 155, JBSA-Lackland Air Force
Base, Texas 78236–9853, (210) 295–
3777, julianne.turko.1@us.af.mil.
SUPPLEMENTARY INFORMATION: The DAF
will beddown the B–21 MOB 1 under
the USAF Global Strike Command at
Ellsworth AFB, South Dakota. The B–21
MOB 1 beddown will include
construction, demolition, and
renovation of various facilities and
SUMMARY:
PO 00000
Frm 00007
Fmt 4703
Sfmt 4703
Agency Information Collection
Activities; Comment Request; the
College Assistance Migrant Program
(CAMP) Annual Performance Report
(APR)
Office of Elementary and
Secondary Education (OESE),
Department of Education (ED).
ACTION: Notice.
AGENCY:
In accordance with the
Paperwork Reduction Act of 1995, ED is
proposing an extension without change
of a currently approved collection.
DATES: Interested persons are invited to
submit comments on or before August
16, 2021.
ADDRESSES: To access and review all the
documents related to the information
collection listed in this notice, please
use https://www.regulations.gov by
searching the Docket ID number ED–
2021–SCC–0091. Comments submitted
in response to this notice should be
submitted electronically through the
Federal eRulemaking Portal at https://
www.regulations.gov by selecting the
Docket ID number or via postal mail,
commercial delivery, or hand delivery.
If the regulations.gov site is not
available to the public for any reason,
ED will temporarily accept comments at
SUMMARY:
E:\FR\FM\17JNN1.SGM
17JNN1
Agencies
[Federal Register Volume 86, Number 115 (Thursday, June 17, 2021)]
[Notices]
[Page 32250]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-12724]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Air Force
Record of Decision for the B-21 Main Operating Base 1 Beddown at
Dyess AFB, Texas or Ellsworth AFB, South Dakota Environmental Impact
Statement
AGENCY: Department of the Air Force, Department of Defense.
ACTION: Notice of availability of Record of Decision.
-----------------------------------------------------------------------
SUMMARY: On June 3, 2021, the Department of the Air Force (DAF) signed
the Record of Decision (ROD) for the Environmental Impact Statement B-
21 Main Operating Base (MOB) 1 Beddown at Dyess AFB, Texas or Ellsworth
AFB, South Dakota.
ADDRESSES: Ms. Julianne Turko, AFCEC/CZN, 2261 Hughes Avenue, Suite
155, JBSA-Lackland Air Force Base, Texas 78236-9853, (210) 295-3777,
[email protected].
SUPPLEMENTARY INFORMATION: The DAF will beddown the B-21 MOB 1 under
the USAF Global Strike Command at Ellsworth AFB, South Dakota. The B-21
MOB 1 beddown will include construction, demolition, and renovation of
various facilities and infrastructure projects on Ellsworth AFB,
including the construction of a Weapons Generation Facility (WGF) at
the South WGF Site location. The DAF decision documented in the ROD was
based on matters discussed in the Final Environmental Impact Statement,
inputs from Native American Tribes, members of the public, and
regulatory agencies, and other relevant factors. The Final
Environmental Impact Statement was made available to the public on
March 19, 2021 through a Notice of Availability in the Federal Register
(Volume 86, Number 52, pages 14908-14909) with a waiting period that
ended on April 19, 2021.
Authority: This Notice of Availability is published pursuant to
the regulations (40 CFR part 1506.6) implementing the provisions of
the National Environmental Policy Act (42 U.S.C. 4321, et seq.) and
the Air Force's Environmental Impact Analysis Process (32 CFR parts
989.21(b) and 989.24(b)(7)).
Adriane Paris,
Acting Air Force Federal Register Liaison Officer.
[FR Doc. 2021-12724 Filed 6-16-21; 8:45 am]
BILLING CODE 5001-10-P