Chittenden Falls Hydropower, Inc.; Notice of Authorization for Continued Project Operation, 32031 [2021-12649]

Download as PDF Federal Register / Vol. 86, No. 114 / Wednesday, June 16, 2021 / Notices distribution grid, and (5) cybersecurity challenges and needs associated with electrifying the transportation sector. Specific questions can be found in the RFI. The RFI is available at: https://eereexchange.energy.gov/. Confidential Business Information: Pursuant to 10 CFR 1004.11, any person submitting information that he or she believes to be confidential and exempt by law from public disclosure should submit via email two well-marked copies: One copy of the document marked ‘‘confidential’’ including all the information believed to be confidential, and one copy of the document marked ‘‘non-confidential’’ with the information believed to be confidential deleted. Submit these documents via email. DOE will make its own determination about the confidential status of the information and treat it according to its determination. Signing Authority: This document of the Department of Energy was signed on June 10, 2021, by David Howell, Acting Director, Vehicle Technologies Office, Office of Energy Efficiency and Renewable Energy, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC, on June 10, 2021. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. Federal Energy Regulatory Commission Combined Notice of Filings jbell on DSKJLSW7X2PROD with NOTICES BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Chittenden Falls Hydropower, Inc.; Notice of Authorization for Continued Project Operation DEPARTMENT OF ENERGY Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP21–893–000. Applicants: Enable Mississippi River Transmission, LLC. Description: § 4(d) Rate Filing: Negotiated Rate Filing—City of Red Bud 6.9.2021 to be effective 6/9/2021. Jkt 253001 [FR Doc. 2021–12699 Filed 6–15–21; 8:45 am] [Project No. 3273–000] BILLING CODE 6450–01–P 17:27 Jun 15, 2021 Dated: June 10, 2021. Debbie-Anne A. Reese, Deputy Secretary. Federal Energy Regulatory Commission [FR Doc. 2021–12670 Filed 6–15–21; 8:45 am] VerDate Sep<11>2014 Filed Date: 6/9/21. Accession Number: 20210609–5055. Comments Due: 5 p.m. ET 6/21/21. Docket Numbers: RP21–894–000. Applicants: EQT Energy, LLC, Alta Energy Marketing, LLC. Description: Joint Petition for Limited Waiver of Capacity Release Regulations, et al. of EQT Energy, LLC, et al. Filed Date: 6/9/21. Accession Number: 20210609–5174. Comments Due: 5 p.m. ET 6/16/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. On May 31, 2019, Chittenden Falls Hydropower, Inc., licensee for the Chittenden Falls Hydroelectric Project No. 3273, filed an Application for a Subsequent License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Chittenden Falls Hydroelectric Project is located on Kinderhook Creek, near the Town of Stockport, Columbia County, New York. The license for Project No. 3273 was issued for a period ending May 31, 2021. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a PO 00000 Frm 00019 Fmt 4703 Sfmt 9990 32031 license term, to issue from year-to-year an annual license to the then licensee(s) under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 3273 is issued to Chittenden Falls Hydropower, Inc, for a period effective June 1, 2021 through May 31, 2022 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before May 31, 2022, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that Chittenden Falls Hydropower, Inc. is authorized to continue operation of the Chittenden Falls Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. Dated: June 10, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–12649 Filed 6–15–21; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\16JNN1.SGM 16JNN1

Agencies

[Federal Register Volume 86, Number 114 (Wednesday, June 16, 2021)]
[Notices]
[Page 32031]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-12649]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3273-000]


Chittenden Falls Hydropower, Inc.; Notice of Authorization for 
Continued Project Operation

    On May 31, 2019, Chittenden Falls Hydropower, Inc., licensee for 
the Chittenden Falls Hydroelectric Project No. 3273, filed an 
Application for a Subsequent License pursuant to the Federal Power Act 
(FPA) and the Commission's regulations thereunder. The Chittenden Falls 
Hydroelectric Project is located on Kinderhook Creek, near the Town of 
Stockport, Columbia County, New York.
    The license for Project No. 3273 was issued for a period ending May 
31, 2021. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires 
the Commission, at the expiration of a license term, to issue from 
year-to-year an annual license to the then licensee(s) under the terms 
and conditions of the prior license until a new license is issued, or 
the project is otherwise disposed of as provided in section 15 or any 
other applicable section of the FPA. If the project's prior license 
waived the applicability of section 15 of the FPA, then, based on 
section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and 
as set forth at 18 CFR 16.21(a), if the licensee of such project has 
filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 3273 is issued to 
Chittenden Falls Hydropower, Inc, for a period effective June 1, 2021 
through May 31, 2022 or until the issuance of a new license for the 
project or other disposition under the FPA, whichever comes first. If 
issuance of a new license (or other disposition) does not take place on 
or before May 31, 2022, notice is hereby given that, pursuant to 18 CFR 
16.18(c), an annual license under section 15(a)(1) of the FPA is 
renewed automatically without further order or notice by the 
Commission, unless the Commission orders otherwise.
    If the project is not subject to section 15 of the FPA, notice is 
hereby given that Chittenden Falls Hydropower, Inc. is authorized to 
continue operation of the Chittenden Falls Hydroelectric Project, until 
such time as the Commission acts on its application for a subsequent 
license.

    Dated: June 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-12649 Filed 6-15-21; 8:45 am]
BILLING CODE 6717-01-P