North Loup River Public Power & Irrigation District; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 31303-31304 [2021-12253]
Download as PDF
jbell on DSKJLSW7X2PROD with NOTICES
Federal Register / Vol. 86, No. 111 / Friday, June 11, 2021 / Notices
Filed Date: 6/1/21.
Accession Number: 20210601–5007.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–869–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Negotiated Rate Capacity Release
Agreements—6/1/2021 to be effective 6/
1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5035.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–870–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmts (Marathon 51753,
51754 to Spire 54108, 54107) to be
effective 6/1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5041.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–871–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing:
Amendments to Neg Rate Agmts
(Aethon 53154, 52454) to be effective 6/
1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5042.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–872–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmt (Constellation 54074
to Exelon 54109) to be effective 6/1/
2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5043.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–873–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Remove Expired Negotiated Rate
Agreements—6/1/2021 to be effective 6/
1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5044.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–874–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Cherokee AGL—
Replacement Shippers—Jun 2021 to be
effective 6/1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5045.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–875–000.
Applicants: Questar Southern Trails
Pipeline Company.
Description: Annual Fuel Gas
Reimbursement Report of Questar
Southern Trails Pipeline Company.
VerDate Sep<11>2014
19:14 Jun 10, 2021
Jkt 253001
Filed Date: 6/1/21.
Accession Number: 20210601–5047.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–876–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Releases eff 6–01–
2021 to be effective 6/1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5048.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–877–000.
Applicants: Eastern Shore Natural Gas
Company.
Description: § 4(d) Rate Filing: Fuel
Retention & Cash-Out Adjustment 2021
to be effective 7/1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5049.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–878–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—June 1, 2021 BP
to be effective 6/1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5050.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–879–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Releases eff 6–1–
2021 to be effective 6/1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5052.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–880–000.
Applicants: NEXUS Gas
Transmission, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Various Releases eff
6–1–2021 to be effective 6/1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5057.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–881–000.
Applicants: White River Hub, LLC.
Description: Annual Fuel Gas
Reimbursement Report of White River
Hub, LLC.
Filed Date: 6/1/21.
Accession Number: 20210601–5148.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–882–000.
Applicants: Equitrans, L.P.
Description: Compliance filing Notice
Regarding Non-Jurisdictional Gathering
Facilities (PEG–1 –2 –3 –4 –164).
Filed Date: 6/1/21.
Accession Number: 20210601–5154.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–883–000.
Applicants: Enable Mississippi River
Transmission, LLC.
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
31303
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—6.1.2021 to be
effective 6/1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5158.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–884–000.
Applicants: Alliance Pipeline L.P.
Description: § 4(d) Rate Filing:
Negotiated Rates—Various June 1
Capacity Releases to be effective 6/1/
2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5184.
Comments Due: 5 p.m. ET 6/14/21.
Docket Numbers: RP21–885–000.
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rates—Various Releases eff
6–1–2021 to be effective 6/1/2021.
Filed Date: 6/1/21.
Accession Number: 20210601–5268.
Comments Due: 5 p.m. ET 6/14/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: June 4, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–12251 Filed 6–10–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15148–000]
North Loup River Public Power &
Irrigation District; Notice of Application
Tendered for Filing With the
Commission and Soliciting Additional
Study Requests
Take notice that the following
hydroelectric application has been filed
E:\FR\FM\11JNN1.SGM
11JNN1
31304
Federal Register / Vol. 86, No. 111 / Friday, June 11, 2021 / Notices
with the Commission and is available
for public inspection.
a. Type of Application: Exemption
From Licensing.
b. Project No.: P–15148–000.
c. Date filed: May 21, 2021.
d. Applicant: North Loup River Public
Power & Irrigation District (North Loup
District).
e. Name of Project: Ord Diversion
Dam Hydroelectric Project (project).
f. Location: On the North Loup River,
in the Town of Ord, Valley County,
Nebraska. No federal or tribal lands
would be occupied by project works or
located within the project boundary.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Applicant Contact: Amos Lange,
General Manager of North Loup River
Public Power & Irrigation District, 128
North 16th Street, Ord, NE 68862, and
308–728–3851.
i. FERC Contact: Shana Wiseman,
202–502–8736, and shana.wiseman@
ferc.gov.
j. Cooperating Agencies: Federal,
state, local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: August 2, 2021.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–
15148–000.
m. The application is not ready for
environmental analysis at this time.
n. The proposed project would consist
of: (1) Five new concrete flumes placed
directly at the base of the existing Ord
Diversion dam (also known as the
Hardenbrook Diversion Structure); (2)
each flume would contain two vertical
axis hydrokinetic turbines directly
connected to a 480-volt, 3-phase
generator for a 12 kilowatt (kW) capacity
per flume, or 60 kW capacity for the
project; (3) an existing irrigation canal;
(4) a new turbine control and power
conditioning cabinet; (5) an new array
control cabinet; (6) a new 0.5-mile-long
transmission line; and (7) appurtenant
facilities. The project is estimated to
generate an average of 394 megawatthours annually. North Loup District
proposes to operate the project in a runof-river mode.
o. A copy of the application may be
viewed and/or printed on the
Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued on March 13, 2020. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Nebraska State
Historic Preservation Officer (SHPO), as
required by section 106 of the National
Historic Preservation Act and the
regulations of the Advisory Council on
Historic Preservation, 36 CFR 800.4.
q. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate (e.g., if there are no
deficiencies and/or scoping is waived,
the schedule would be shortened).
Milestone
Target date
Issue Deficiency/Additional Information Request (if necessary) ...................................................................................................
Issue Acceptance Letter/Ready for Environmental Analysis .........................................................................................................
Commission issues EA ..................................................................................................................................................................
Dated: June 3, 2021.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2021–12253 Filed 6–10–21; 8:45 am]
[Docket No. EL21–69–000]
BILLING CODE 6717–01–P
jbell on DSKJLSW7X2PROD with NOTICES
Federal Energy Regulatory
Commission
Dairyland Power Cooperative; Notice
of Amendment of Request for Partial
Waiver
Take notice that on June 2, 2021,
pursuant to section 292.402 of the
Federal Energy Regulatory
VerDate Sep<11>2014
19:14 Jun 10, 2021
Jkt 253001
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
July 2021.
November 2021.
February 2022.
Commission’s (Commission)
regulations, 18 CFR 292.402, Dairyland
Power Cooperative (Dairyland), on
behalf of itself and 24 rural electric
cooperative member-owners
(collectively, the Participating
Members),1 filed an amendment to its
1 Dairyland’s Participating Member-owners
joining in this petition are Barron Electric
Cooperative, Bayfield Electric Cooperative,
Chippewa Valley Electric Cooperative, Clark
Electric Cooperative, Dunn Energy Cooperative, Eau
Claire Energy Cooperative, Jackson Electric
E:\FR\FM\11JNN1.SGM
11JNN1
Agencies
[Federal Register Volume 86, Number 111 (Friday, June 11, 2021)]
[Notices]
[Pages 31303-31304]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-12253]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15148-000]
North Loup River Public Power & Irrigation District; Notice of
Application Tendered for Filing With the Commission and Soliciting
Additional Study Requests
Take notice that the following hydroelectric application has been
filed
[[Page 31304]]
with the Commission and is available for public inspection.
a. Type of Application: Exemption From Licensing.
b. Project No.: P-15148-000.
c. Date filed: May 21, 2021.
d. Applicant: North Loup River Public Power & Irrigation District
(North Loup District).
e. Name of Project: Ord Diversion Dam Hydroelectric Project
(project).
f. Location: On the North Loup River, in the Town of Ord, Valley
County, Nebraska. No federal or tribal lands would be occupied by
project works or located within the project boundary.
g. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Applicant Contact: Amos Lange, General Manager of North Loup
River Public Power & Irrigation District, 128 North 16th Street, Ord,
NE 68862, and 308-728-3851.
i. FERC Contact: Shana Wiseman, 202-502-8736, and
[email protected].
j. Cooperating Agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: August 2, 2021.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, you may submit a paper
copy. Submissions sent via the U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first page of any filing should include
docket number P-15148-000.
m. The application is not ready for environmental analysis at this
time.
n. The proposed project would consist of: (1) Five new concrete
flumes placed directly at the base of the existing Ord Diversion dam
(also known as the Hardenbrook Diversion Structure); (2) each flume
would contain two vertical axis hydrokinetic turbines directly
connected to a 480-volt, 3-phase generator for a 12 kilowatt (kW)
capacity per flume, or 60 kW capacity for the project; (3) an existing
irrigation canal; (4) a new turbine control and power conditioning
cabinet; (5) an new array control cabinet; (6) a new 0.5-mile-long
transmission line; and (7) appurtenant facilities. The project is
estimated to generate an average of 394 megawatt-hours annually. North
Loup District proposes to operate the project in a run-of-river mode.
o. A copy of the application may be viewed and/or printed on the
Commission's website (https://www.ferc.gov), using the ``eLibrary''
link. Enter the docket number, excluding the last three digits in the
docket number field to access the document. At this time, the
Commission has suspended access to the Commission's Public Reference
Room, due to the proclamation declaring a National Emergency concerning
the Novel Coronavirus Disease (COVID-19), issued on March 13, 2020. For
assistance, contact FERC Online Support at [email protected],
(866) 208-3676 (toll free), or (202) 502-8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. With this notice, we are initiating consultation with the
Nebraska State Historic Preservation Officer (SHPO), as required by
section 106 of the National Historic Preservation Act and the
regulations of the Advisory Council on Historic Preservation, 36 CFR
800.4.
q. Procedural schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate (e.g., if there are no deficiencies and/or
scoping is waived, the schedule would be shortened).
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Deficiency/Additional July 2021.
Information Request (if necessary).
Issue Acceptance Letter/Ready for November 2021.
Environmental Analysis.
Commission issues EA.................. February 2022.
------------------------------------------------------------------------
Dated: June 3, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-12253 Filed 6-10-21; 8:45 am]