Columbia Gulf Transmission, LLC; Notice of Intent To Prepare a AnEnvironmental Impact Statement for the Proposed; East Lateral Xpress Project and Schedule for Environmental Review, 29766 [2021-11662]
Download as PDF
29766
Federal Register / Vol. 86, No. 105 / Thursday, June 3, 2021 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP20–527–000]
Columbia Gulf Transmission, LLC;
Notice of Intent To Prepare a
AnEnvironmental Impact Statement for
the Proposed; East Lateral Xpress
Project and Schedule for
Environmental Review
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
for the East Lateral XPress Project
(Project), proposed by Columbia Gulf
Transmission, LLC (Columbia Gulf) in
Jefferson, Plaquemines, St. Mary, and
Lafourche Parishes, Louisiana. The EIS
will tier off Commission staff’s
Environmental Assessment (EA) and its
findings and conclusions for the Project
issued on March 16, 2021, and respond
to comments filed on the EA.1 The EIS
will assist the Commission in its
consideration of the Project’s
contribution to climate change and its
decision-making process to determine
whether Columbia Gulf’s proposed
Project is in the public convenience and
necessity. The schedule for preparation
of the EIS is discussed in the ‘‘Schedule
for Environmental Review’’ section of
this notice.
khammond on DSKJM1Z7X2PROD with NOTICES
The National Environmental Policy Act
Process
The production of the EIS is part of
the Commission’s overall National
Environmental Policy Act review
process. Commission staff will
independently analyze the proposed
Project and prepare a draft EIS, which
will be issued for public comment.
Commission staff will consider all
timely comments received during the
comment period on the draft EIS and
revise the document, as necessary,
before issuing a final EIS. Any draft and
final EIS will be available in electronic
format in the public record through
eLibrary 2 and the Commission’s natural
gas environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents).
Schedule for Environmental Review
This notice identifies the Commission
staff’s planned schedule for completion
1 The EA for the Project is filed in Docket No.
CP20–527–000 under Accession No. 20210316–
3010.
2 For instructions on connecting to eLibrary, refer
to the ‘‘Additional Information’’ section of this
notice.
VerDate Sep<11>2014
17:23 Jun 02, 2021
Jkt 253001
of a final EIS for the Project, which is
based on an issuance of the draft EIS in
June 2021.
Issuance of Notice of Availability of the
final EIS—September 17, 2021
90-day Federal Authorization Decision
Deadline—December 16, 2021
If a schedule change becomes
necessary for the final EIS, an additional
notice will be provided so that the
relevant agencies are kept informed of
the Project’s progress.
Environmental Mailing List
This notice is being sent to the
Commission’s current environmental
mailing list for the Project which
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
Project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the Project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
Project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP20–527–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 1).
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Dated: May 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–11662 Filed 6–2–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–161–000.
Applicants: Hubbard Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Hubbard Wind, LLC.
Filed Date: 5/27/21.
Accession Number: 20210527–5234.
Comments Due: 5 p.m. ET 6/17/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1818–026;
ER10–1817–023; ER10–1819–030;
ER10–1820–033.
Applicants: Public Service Company
of Colorado, Southwestern Public
Service Company, Northern States
Power Company a Minnesota
corporation, Northern States Power
Company a Wisconsin corporation.
Description: Notice of Change in
Status of Public Service Company of
Colorado, et al.
Filed Date: 5/27/21.
E:\FR\FM\03JNN1.SGM
03JNN1
Agencies
[Federal Register Volume 86, Number 105 (Thursday, June 3, 2021)]
[Notices]
[Page 29766]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-11662]
[[Page 29766]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-527-000]
Columbia Gulf Transmission, LLC; Notice of Intent To Prepare a
AnEnvironmental Impact Statement for the Proposed; East Lateral Xpress
Project and Schedule for Environmental Review
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental impact statement (EIS) for
the East Lateral XPress Project (Project), proposed by Columbia Gulf
Transmission, LLC (Columbia Gulf) in Jefferson, Plaquemines, St. Mary,
and Lafourche Parishes, Louisiana. The EIS will tier off Commission
staff's Environmental Assessment (EA) and its findings and conclusions
for the Project issued on March 16, 2021, and respond to comments filed
on the EA.\1\ The EIS will assist the Commission in its consideration
of the Project's contribution to climate change and its decision-making
process to determine whether Columbia Gulf's proposed Project is in the
public convenience and necessity. The schedule for preparation of the
EIS is discussed in the ``Schedule for Environmental Review'' section
of this notice.
---------------------------------------------------------------------------
\1\ The EA for the Project is filed in Docket No. CP20-527-000
under Accession No. 20210316-3010.
---------------------------------------------------------------------------
The National Environmental Policy Act Process
The production of the EIS is part of the Commission's overall
National Environmental Policy Act review process. Commission staff will
independently analyze the proposed Project and prepare a draft EIS,
which will be issued for public comment. Commission staff will consider
all timely comments received during the comment period on the draft EIS
and revise the document, as necessary, before issuing a final EIS. Any
draft and final EIS will be available in electronic format in the
public record through eLibrary \2\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents).
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
``Additional Information'' section of this notice.
---------------------------------------------------------------------------
Schedule for Environmental Review
This notice identifies the Commission staff's planned schedule for
completion of a final EIS for the Project, which is based on an
issuance of the draft EIS in June 2021.
Issuance of Notice of Availability of the final EIS--September 17, 2021
90-day Federal Authorization Decision Deadline--December 16, 2021
If a schedule change becomes necessary for the final EIS, an
additional notice will be provided so that the relevant agencies are
kept informed of the Project's progress.
Environmental Mailing List
This notice is being sent to the Commission's current environmental
mailing list for the Project which includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for Project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the Project and includes a mailing address with their
comments. Commission staff will update the environmental mailing list
as the analysis proceeds to ensure that Commission notices related to
this environmental review are sent to all individuals, organizations,
and government entities interested in and/or potentially affected by
the proposed Project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please complete one of
the following steps:
(1) Send an email to [email protected] stating your
request. You must include the docket number CP20-527-000 in your
request. If you are requesting a change to your address, please be sure
to include your name and the correct address. If you are requesting to
delete your address from the mailing list, please include your name and
address as it appeared on this notice. This email address is unable to
accept comments.
OR
(2) Return the attached ``Mailing List Update Form'' (appendix 1).
Additional Information
In order to receive notification of the issuance of the EIS and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Additional information about the Project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Dated: May 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-11662 Filed 6-2-21; 8:45 am]