Iroquois Gas Transmission System, L.P.; Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Enhancement By Compression Project and Schedule for Environmental Review, 29769-29770 [2021-11661]
Download as PDF
Federal Register / Vol. 86, No. 105 / Thursday, June 3, 2021 / Notices
Dated: May 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–11663 Filed 6–2–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2997–031]
South Sutter Water District; Notice of
Waiver Period for Water Quality
Certification Application
On May 17, 2021, South Sutter Water
District submitted to the Federal Energy
Regulatory Commission (Commission) a
copy of its application for a Clean Water
Act Section 401(a)(1) water quality
certification filed with the California
State Water Resources Control Board
(California Water Board), in conjunction
with the above captioned project.
Pursuant to 40 CFR 121.6, we hereby
notify the California Water Board of the
following:
Date of Receipt of the Certification
Request: May 17, 2021.
Reasonable Period of Time to Act on
the Certification Request: One year.
Date Waiver Occurs for Failure to Act:
May 17, 2022.
If the California Water Board fails or
refuses to act on the water quality
certification request by the above waiver
date, then the agency’s certifying
authority is deemed waived pursuant to
Section 401(a)(1) of the Clean Water
Act, 33 U.S.C. 1341(a)(1).
Dated: May 19, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–11666 Filed 6–2–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
[Docket No. CP20–48–000]
Iroquois Gas Transmission System,
L.P.; Notice of Intent To Prepare an
Environmental Impact Statement for
the Proposed Enhancement By
Compression Project and Schedule for
Environmental Review
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
for the Enhancement by Compression
Project (Project), proposed by Iroquois
VerDate Sep<11>2014
17:23 Jun 02, 2021
Jkt 253001
Gas Transmission System, L.P.
(Iroquois) in Greene and Dutchess
Counties, New York and Fairfield and
New Haven Counties, Connecticut. The
EIS will tier off Commission staff’s
Environmental Assessment (EA) and its
findings and conclusions for the Project
issued on September 30, 2020, and
respond to comments filed on the EA.1
The EIS will assist the Commission in
its consideration of the Project’s
contribution to climate change and its
decision-making process to determine
whether Iroquois’ proposed Project is in
the public convenience and necessity.
The schedule for preparation of the EIS
is discussed in the ‘‘Schedule for
Environmental Review’’ section of this
notice.
The National Environmental Policy Act
Process
The production of the EIS is part of
the Commission’s overall National
Environmental Policy Act review
process. Commission staff will
independently analyze the proposed
Project and prepare a draft EIS, which
will be issued for public comment.
Commission staff will consider all
timely comments received during the
comment period on the draft EIS and
revise the document, as necessary,
before issuing a final EIS. Any draft and
final EIS will be available in electronic
format in the public record through
eLibrary 2 and the Commission’s natural
gas environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents).
Schedule for Environmental Review
This notice identifies the Commission
staff’s planned schedule for completion
of a final EIS for the Project, which is
based on an issuance of the draft EIS in
June 2021.
Issuance of Notice of Availability of the
final EIS September 3, 2021
90-day Federal Authorization Decision
Deadline December 2, 2021
If a schedule change becomes
necessary for the final EIS, an additional
notice will be provided so that the
relevant agencies are kept informed of
the Project’s progress.
Environmental Mailing List
This notice is being sent to the
Commission’s current environmental
mailing list for the Project which
includes federal, state, and local
1 The EA for the Project is filed in Docket No.
CP20–48–000 under Accession No. 20200930–3011.
2 For instructions on connecting to eLibrary, refer
to the ‘‘Additional Information’’ section of this
notice.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
29769
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries.
This list also includes all affected
landowners (as defined in the
Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
Project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the Project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
Project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP20–48–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 1).
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
E:\FR\FM\03JNN1.SGM
03JNN1
29770
Federal Register / Vol. 86, No. 105 / Thursday, June 3, 2021 / Notices
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Dated: May 27, 2021.
Kimberly D. Bose,
Secretary.
Dated: May 27, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–11708 Filed 6–2–21; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OGC–2021–0351; FRL–10024–26–
OGC]
Proposed Consent Decree, Clean Air
Act Citizen Suit
[FR Doc. 2021–11661 Filed 6–2–21; 8:45 am]
BILLING CODE 6717–01–P
Environmental Protection
Agency (EPA).
ACTION: Notice of proposed consent
decree; request for public comment.
AGENCY:
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP21–686–001.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: Compliance filing
Compliance Filing—Crediting of Storage
Reservation Charges to be effective 5/1/
2021.
Filed Date: 5/26/21.
Accession Number: 20210526–5164.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: RP21–843–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: ROFR
Agreement Definition Modification to be
effective 6/25/2021.
Filed Date: 5/26/21.
Accession Number: 20210526–5206.
Comments Due: 5 p.m. ET 6/7/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
VerDate Sep<11>2014
17:23 Jun 02, 2021
In accordance with section
the Clean Air Act, as amended (‘‘CAA’’
or the ‘‘Act’’), notice is given of a
proposed consent decree in Association
of Irritated Residents v. EPA, No. 4:21–
cv–426–JST (N.D. CA.). On January 17,
2021, Plaintiff filed a complaint in the
United States District Court for the
Northern District of California, Oakland
Division, alleging that the
Environmental Protection Agency (EPA)
failed to perform several mandatory
duties under the CAA. On May 10,
2019, the State of California submitted
a SIP revision to EPA with two
components titled ‘‘2018 Plan for the
1997, 2006, and 2012 PM2.5 Standards’’
and ‘‘San Joaquin Valley Supplement to
the 2016 State Strategy for the State
Implementation Plan’’ (together, the
‘‘SJV PM2.5 Plan’’) to address CAA
requirements for attainment of the PM2.5
NAAQS in the SJV Area. The SJV PM2.5
Plan includes measures intended to
control emissions of fine particulate
matter and its precursors within the San
Joaquin Valley for purposes of attaining
the 1997 annual and 24-hour PM2.5
NAAQS, 2006 24-hour PM2.5 NAAQS
and 2012 annual PM2.5 NAAQS. The
proposed consent decree would
establish deadlines for EPA to take final
actions on the portions of the SJV PM2.5
Plan that address requirements for the
various PM2.5 NAAQS by specific dates.
DATES: Written comments on the
proposed consent decree must be
received by July 6, 2021.
ADDRESSES: Submit your comments,
identified by Docket ID number EPA–
HQ–OGC–2021–0351, online at https://
www.regulations.gov (EPA’s preferred
method). Follow the online instructions
for submitting comments.
Instructions: All submissions received
must include the Docket ID number for
this action. Comments received may be
posted without change to https://
SUMMARY:
Combined Notice of Filings
Jkt 253001
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
www.regulations.gov, including any
personal information provided. For
detailed instructions on sending
comments and additional information
on the rulemaking process, see the
‘‘Additional Information about
Commenting on the Proposed Consent
Decree’’ heading under the
SUPPLEMENTARY INFORMATION section of
this document. Out of an abundance of
caution for members of the public and
our staff, the EPA Docket Center and
Reading Room are closed to the public,
with limited exceptions, to reduce the
risk of transmitting COVID–19. Our
Docket Center staff will continue to
provide remote customer service via
email, phone, and webform. We
encourage the public to submit
comments via https://
www.regulations.gov, as there may be a
delay in processing mail and faxes.
Hand-deliveries and couriers may be
received by scheduled appointment
only. For further information on EPA
Docket Center services and the current
status, please visit us online at https://
www.epa.gov/dockets.
EPA continues to carefully and
continuously monitor information from
the CDC, local area health departments,
and our federal partners so that we can
respond rapidly as conditions change
regarding COVID–19.
FOR FURTHER INFORMATION CONTACT:
Geoffrey L. Wilcox, Air and Radiation
Law Office (2344A), Office of General
Counsel, U.S. Environmental Protection
Agency, 1200 Pennsylvania Ave. NW,
Washington, DC 20460; telephone: (202)
564–5601; email address:
wilcox.geoffrey@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining a Copy of the Proposed
Consent Decree
The official public docket for this
action (identified by Docket ID No.
EPA–HQ–OGC–2021–0351) contains a
copy of the proposed consent decree.
The electronic version of the public
docket for this action contains a copy of
the proposed consent decree and is
available through https://
www.regulations.gov. You may use
https://www.regulations.gov to submit
or view public comments, access the
index listing of the contents of the
official public docket, and access those
documents in the public docket that are
available electronically. Once in the
system, key in the appropriate docket
identification number then select
‘‘search.’’
II. Additional Information About the
Proposed Consent Decree
The proposed consent decree would
establish deadlines for EPA to take final
E:\FR\FM\03JNN1.SGM
03JNN1
Agencies
[Federal Register Volume 86, Number 105 (Thursday, June 3, 2021)]
[Notices]
[Pages 29769-29770]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-11661]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-48-000]
Iroquois Gas Transmission System, L.P.; Notice of Intent To
Prepare an Environmental Impact Statement for the Proposed Enhancement
By Compression Project and Schedule for Environmental Review
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental impact statement (EIS) for
the Enhancement by Compression Project (Project), proposed by Iroquois
Gas Transmission System, L.P. (Iroquois) in Greene and Dutchess
Counties, New York and Fairfield and New Haven Counties, Connecticut.
The EIS will tier off Commission staff's Environmental Assessment (EA)
and its findings and conclusions for the Project issued on September
30, 2020, and respond to comments filed on the EA.\1\ The EIS will
assist the Commission in its consideration of the Project's
contribution to climate change and its decision-making process to
determine whether Iroquois' proposed Project is in the public
convenience and necessity. The schedule for preparation of the EIS is
discussed in the ``Schedule for Environmental Review'' section of this
notice.
---------------------------------------------------------------------------
\1\ The EA for the Project is filed in Docket No. CP20-48-000
under Accession No. 20200930-3011.
---------------------------------------------------------------------------
The National Environmental Policy Act Process
The production of the EIS is part of the Commission's overall
National Environmental Policy Act review process. Commission staff will
independently analyze the proposed Project and prepare a draft EIS,
which will be issued for public comment. Commission staff will consider
all timely comments received during the comment period on the draft EIS
and revise the document, as necessary, before issuing a final EIS. Any
draft and final EIS will be available in electronic format in the
public record through eLibrary \2\ and the Commission's natural gas
environmental documents web page (https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents).
---------------------------------------------------------------------------
\2\ For instructions on connecting to eLibrary, refer to the
``Additional Information'' section of this notice.
---------------------------------------------------------------------------
Schedule for Environmental Review
This notice identifies the Commission staff's planned schedule for
completion of a final EIS for the Project, which is based on an
issuance of the draft EIS in June 2021.
Issuance of Notice of Availability of the final EIS September 3, 2021
90-day Federal Authorization Decision Deadline December 2, 2021
If a schedule change becomes necessary for the final EIS, an
additional notice will be provided so that the relevant agencies are
kept informed of the Project's progress.
Environmental Mailing List
This notice is being sent to the Commission's current environmental
mailing list for the Project which includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American tribes; other
interested parties; and local libraries. This list also includes all
affected landowners (as defined in the Commission's regulations) who
are potential right-of-way grantors, whose property may be used
temporarily for Project purposes, or who own homes within certain
distances of aboveground facilities, and anyone who submits comments on
the Project and includes a mailing address with their comments.
Commission staff will update the environmental mailing list as the
analysis proceeds to ensure that Commission notices related to this
environmental review are sent to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed Project.
If you need to make changes to your name/address, or if you would
like to remove your name from the mailing list, please complete one of
the following steps:
(1) Send an email to [email protected] stating your
request. You must include the docket number CP20-48-000 in your
request. If you are requesting a change to your address, please be sure
to include your name and the correct address. If you are requesting to
delete your address from the mailing list, please include your name and
address as it appeared on this notice. This email address is unable to
accept comments.
OR
(2) Return the attached ``Mailing List Update Form'' (appendix 1).
Additional Information
In order to receive notification of the issuance of the EIS and to
keep track of all formal issuances and submittals in specific dockets,
the Commission offers a free service called eSubscription. This can
reduce the amount of time you spend researching proceedings by
automatically providing you with notification of these filings,
document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Additional information about the Project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC website at www.ferc.gov using the eLibrary link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number
in the ``Docket Number'' field. Be sure you have selected an
[[Page 29770]]
appropriate date range. For assistance, please contact FERC Online
Support at [email protected] or (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of all formal documents issued by the Commission, such as orders,
notices, and rulemakings.
Dated: May 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-11661 Filed 6-2-21; 8:45 am]
BILLING CODE 6717-01-P