Enable Gas Transmission, LLC; Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline, 29760-29761 [2021-11657]
Download as PDF
29760
Federal Register / Vol. 86, No. 105 / Thursday, June 3, 2021 / Notices
final EIS will be available in electronic
format in the public record through
eLibrary 2 and the Commission’s natural
gas environmental documents web page
(https://www.ferc.gov/industries-data/
natural-gas/environment/
environmental-documents).
khammond on DSKJM1Z7X2PROD with NOTICES
Schedule for Environmental Review
This notice identifies the Commission
staff’s planned schedule for completion
of a final EIS for the Project, which is
based on an issuance of the draft EIS in
July 2021.
Issuance of Notice of Availability of the
final EIS September 24, 2021
90-day Federal Authorization Decision
Deadline December 23, 2021
If a schedule change becomes
necessary for the final EIS, an additional
notice will be provided so that the
relevant agencies are kept informed of
the Project’s progress.
Environmental Mailing List
This notice is being sent to the
Commission’s current environmental
mailing list for the Project, which
includes: Federal, State, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
Project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the Project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
Project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP20–493–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
2 For
instructions on connecting to eLibrary, refer
to the ‘‘Additional Information’’ section of this
notice.
VerDate Sep<11>2014
17:23 Jun 02, 2021
Jkt 253001
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 1).
Additional Information
In order to receive notification of the
issuance of the EIS and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
ferc-online/overview to register for
eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Dated: May 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–11664 Filed 6–2–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–450–000]
Enable Gas Transmission, LLC; Notice
of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on May 18, 2021,
Enable Gas Transmission, LLC (EGT),
910 Louisiana Street, 48th Floor,
Houston, Texas 77002, filed in the
above referenced docket, a prior notice
request pursuant to sections 157.205
and 157.216 of the Commission’s
regulations under the Natural Gas Act
(NGA) and EGT’s blanket certificate
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
issued in Docket Nos. CP82–384–000
and CP82–384–001, for authorization to
abandon in place all existing
compressor units and related major and
minor auxiliary facilities at its Taylor
Compressor Station in Columbia
County, Arkansas, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this prior
notice request should be directed to Lisa
Yoho, Senior Director, Regulatory and
FERC Compliance, Enable Gas
Transmission, LLC, 910 Louisiana
Street, 48th Floor, Houston, Texas
77002, at (346) 701–2539 or by email to
lisa.yoho@enablemidstream.com.
Public Participation
There are three ways to become
involved in the Commission’s review of
this project: you can file a protest to the
project, you can file a motion to
intervene in the proceeding, and you
can file comments on the project. There
is no fee or cost for filing protests,
motions to intervene, or comments. The
deadline for filing protests, motions to
intervene, and comments is 5:00 p.m.
Eastern Time on July 26, 2021. How to
file protests, motions to intervene, and
comments is explained below.
Protests
Pursuant to section 157.205 of the
Commission’s regulations under the
NGA,1 any person 2 or the Commission’s
staff may file a protest to the request. If
no protest is filed within the time
allowed or if a protest is filed and then
withdrawn within 30 days after the
1 18
CFR 157.205.
include individuals, organizations,
businesses, municipalities, and other entities. 18
CFR 385.102(d).
2 Persons
E:\FR\FM\03JNN1.SGM
03JNN1
Federal Register / Vol. 86, No. 105 / Thursday, June 3, 2021 / Notices
khammond on DSKJM1Z7X2PROD with NOTICES
allowed time for filing a protest, the
proposed activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request for
authorization will be considered by the
Commission.
Protests must comply with the
requirements specified in section
157.205(e) of the Commission’s
regulations,3 and must be submitted by
the protest deadline, which is July 26,
2021. A protest may also serve as a
motion to intervene so long as the
protestor states it also seeks to be an
intervenor.
Interventions
Any person has the option to file a
motion to intervene in this proceeding.
Only intervenors have the right to
request rehearing of Commission orders
issued in this proceeding and to
subsequently challenge the
Commission’s orders in the U.S. Circuit
Courts of Appeal.
To intervene, you must submit a
motion to intervene to the Commission
in accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure 4 and the regulations under
the NGA 5 by the intervention deadline
for the project, which is July 26, 2021.
As described further in Rule 214, your
motion to intervene must state, to the
extent known, your position regarding
the proceeding, as well as your interest
in the proceeding. For an individual,
this could include your status as a
landowner, ratepayer, resident of an
impacted community, or recreationist.
You do not need to have property
directly impacted by the project in order
to intervene. For more information
about motions to intervene, refer to the
FERC website at https://www.ferc.gov/
resources/guides/how-to/intervene.asp.
All timely, unopposed motions to
intervene are automatically granted by
operation of Rule 214(c)(1). Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations. A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
3 18
CFR 157.205(e).
CFR 385.214.
5 18 CFR 157.10.
4 18
VerDate Sep<11>2014
19:59 Jun 02, 2021
Jkt 253001
of all documents filed by the applicant
and by all other parties.
Comments
Any person wishing to comment on
the project may do so. The Commission
considers all comments received about
the project in determining the
appropriate action to be taken. To
ensure that your comments are timely
and properly recorded, please submit
your comments on or before July 26,
2021. The filing of a comment alone will
not serve to make the filer a party to the
proceeding. To become a party, you
must intervene in the proceeding.
How To File Protests, Interventions, and
Comments
There are two ways to submit
protests, motions to intervene, and
comments. In both instances, please
reference the Project docket number
CP21–450–000 in your submission.
(1) You may file your protest, motion
to intervene, and comments by using the
Commission’s eFiling feature, which is
located on the Commission’s website
(www.ferc.gov) under the link to
Documents and Filings. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You will be
asked to select the type of filing you are
making; first select General’’ and then
select ‘‘Protest’’, ‘‘Intervention’’, or
‘‘Comment on a Filing’’; or 6
(2) You can file a paper copy of your
submission by mailing it to the address
below.7 Your submission must reference
the Project docket number CP21–450–
000..
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
The Commission encourages
electronic filing of submissions (option
1 above) and has eFiling staff available
to assist you at (202) 502–8258 or
FercOnlineSupport@ferc.gov.
Protests and motions to intervene
must be served on the applicant either
by mail at: 910 Louisiana Street, 48th
Floor, Houston, Texas 77002, or email
(with a link to the document) at:
lisa.yoho@enablemidstream.com. Any
subsequent submissions by an
intervenor must be served on the
6 Additionally, you may file your comments
electronically by using the eComment feature,
which is located on the Commission’s website at
www.ferc.gov under the link to Documents and
Filings. Using eComment is an easy method for
interested persons to submit brief, text-only
comments on a project.
7 Hand-delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
29761
applicant and all other parties to the
proceeding. Contact information for
parties can be downloaded from the
service list at the eService link on FERC
Online.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Dated: May 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–11657 Filed 6–2–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP21–14–000]
Adelphia Gateway, LLC; Notice of
Intent To Prepare an Environmental
Impact Statement for the Proposed
Marcus Hook Electric Compression
Project and Schedule for
Environmental Review
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental impact statement (EIS)
for the Marcus Hook Electric
Compression Project (Project), proposed
by Adelphia Gateway, LLC (Adelphia)
in Delaware County, Pennsylvania. The
EIS will tier off Commission staff’s
Environmental Assessment (EA) and its
findings and conclusions for the Project
issued on February 9, 2021, and respond
to comments filed on the EA.1 The EIS
will assist the Commission in its
consideration of the Project’s
contribution to climate change and its
1 The EA for the Project is filed in Docket No.
CP21–14–000 under Accession No. 20210209–3004.
E:\FR\FM\03JNN1.SGM
03JNN1
Agencies
[Federal Register Volume 86, Number 105 (Thursday, June 3, 2021)]
[Notices]
[Pages 29760-29761]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-11657]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP21-450-000]
Enable Gas Transmission, LLC; Notice of Request Under Blanket
Authorization and Establishing Intervention and Protest Deadline
Take notice that on May 18, 2021, Enable Gas Transmission, LLC
(EGT), 910 Louisiana Street, 48th Floor, Houston, Texas 77002, filed in
the above referenced docket, a prior notice request pursuant to
sections 157.205 and 157.216 of the Commission's regulations under the
Natural Gas Act (NGA) and EGT's blanket certificate issued in Docket
Nos. CP82-384-000 and CP82-384-001, for authorization to abandon in
place all existing compressor units and related major and minor
auxiliary facilities at its Taylor Compressor Station in Columbia
County, Arkansas, all as more fully set forth in the application which
is on file with the Commission and open to public inspection.
In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TYY,
(202) 502-8659.
Any questions regarding this prior notice request should be
directed to Lisa Yoho, Senior Director, Regulatory and FERC Compliance,
Enable Gas Transmission, LLC, 910 Louisiana Street, 48th Floor,
Houston, Texas 77002, at (346) 701-2539 or by email to
[email protected].
Public Participation
There are three ways to become involved in the Commission's review
of this project: you can file a protest to the project, you can file a
motion to intervene in the proceeding, and you can file comments on the
project. There is no fee or cost for filing protests, motions to
intervene, or comments. The deadline for filing protests, motions to
intervene, and comments is 5:00 p.m. Eastern Time on July 26, 2021. How
to file protests, motions to intervene, and comments is explained
below.
Protests
Pursuant to section 157.205 of the Commission's regulations under
the NGA,\1\ any person \2\ or the Commission's staff may file a protest
to the request. If no protest is filed within the time allowed or if a
protest is filed and then withdrawn within 30 days after the
[[Page 29761]]
allowed time for filing a protest, the proposed activity shall be
deemed to be authorized effective the day after the time allowed for
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request for
authorization will be considered by the Commission.
---------------------------------------------------------------------------
\1\ 18 CFR 157.205.
\2\ Persons include individuals, organizations, businesses,
municipalities, and other entities. 18 CFR 385.102(d).
---------------------------------------------------------------------------
Protests must comply with the requirements specified in section
157.205(e) of the Commission's regulations,\3\ and must be submitted by
the protest deadline, which is July 26, 2021. A protest may also serve
as a motion to intervene so long as the protestor states it also seeks
to be an intervenor.
---------------------------------------------------------------------------
\3\ 18 CFR 157.205(e).
---------------------------------------------------------------------------
Interventions
Any person has the option to file a motion to intervene in this
proceeding. Only intervenors have the right to request rehearing of
Commission orders issued in this proceeding and to subsequently
challenge the Commission's orders in the U.S. Circuit Courts of Appeal.
To intervene, you must submit a motion to intervene to the
Commission in accordance with Rule 214 of the Commission's Rules of
Practice and Procedure \4\ and the regulations under the NGA \5\ by the
intervention deadline for the project, which is July 26, 2021. As
described further in Rule 214, your motion to intervene must state, to
the extent known, your position regarding the proceeding, as well as
your interest in the proceeding. For an individual, this could include
your status as a landowner, ratepayer, resident of an impacted
community, or recreationist. You do not need to have property directly
impacted by the project in order to intervene. For more information
about motions to intervene, refer to the FERC website at https://www.ferc.gov/resources/guides/how-to/intervene.asp.
---------------------------------------------------------------------------
\4\ 18 CFR 385.214.
\5\ 18 CFR 157.10.
---------------------------------------------------------------------------
All timely, unopposed motions to intervene are automatically
granted by operation of Rule 214(c)(1). Motions to intervene that are
filed after the intervention deadline are untimely and may be denied.
Any late-filed motion to intervene must show good cause for being late
and must explain why the time limitation should be waived and provide
justification by reference to factors set forth in Rule 214(d) of the
Commission's Rules and Regulations. A person obtaining party status
will be placed on the service list maintained by the Secretary of the
Commission and will receive copies (paper or electronic) of all
documents filed by the applicant and by all other parties.
Comments
Any person wishing to comment on the project may do so. The
Commission considers all comments received about the project in
determining the appropriate action to be taken. To ensure that your
comments are timely and properly recorded, please submit your comments
on or before July 26, 2021. The filing of a comment alone will not
serve to make the filer a party to the proceeding. To become a party,
you must intervene in the proceeding.
How To File Protests, Interventions, and Comments
There are two ways to submit protests, motions to intervene, and
comments. In both instances, please reference the Project docket number
CP21-450-000 in your submission.
(1) You may file your protest, motion to intervene, and comments by
using the Commission's eFiling feature, which is located on the
Commission's website (www.ferc.gov) under the link to Documents and
Filings. New eFiling users must first create an account by clicking on
``eRegister.'' You will be asked to select the type of filing you are
making; first select General'' and then select ``Protest'',
``Intervention'', or ``Comment on a Filing''; or \6\
---------------------------------------------------------------------------
\6\ Additionally, you may file your comments electronically by
using the eComment feature, which is located on the Commission's
website at www.ferc.gov under the link to Documents and Filings.
Using eComment is an easy method for interested persons to submit
brief, text-only comments on a project.
---------------------------------------------------------------------------
(2) You can file a paper copy of your submission by mailing it to
the address below.\7\ Your submission must reference the Project docket
number CP21-450-000..
---------------------------------------------------------------------------
\7\ Hand-delivered submissions in docketed proceedings should be
delivered to Health and Human Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
---------------------------------------------------------------------------
First Street NE, Washington, DC 20426
The Commission encourages electronic filing of submissions (option
1 above) and has eFiling staff available to assist you at (202) 502-
8258 or [email protected]
Protests and motions to intervene must be served on the applicant
either by mail at: 910 Louisiana Street, 48th Floor, Houston, Texas
77002, or email (with a link to the document) at:
[email protected]. Any subsequent submissions by an
intervenor must be served on the applicant and all other parties to the
proceeding. Contact information for parties can be downloaded from the
service list at the eService link on FERC Online.
Tracking the Proceeding
Throughout the proceeding, additional information about the project
will be available from the Commission's Office of External Affairs, at
(866) 208-FERC, or on the FERC website at www.ferc.gov using the
``eLibrary'' link as described above. The eLibrary link also provides
access to the texts of all formal documents issued by the Commission,
such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. For more information and to register, go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: May 27, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-11657 Filed 6-2-21; 8:45 am]
BILLING CODE 6717-01-P