Marlow Hydro, LLC; Notice of Effectiveness of Withdrawal of License Application, 28825 [2021-11337]

Download as PDF Federal Register / Vol. 86, No. 102 / Friday, May 28, 2021 / Notices eFiling feature, which is located on the Commission’s website (www.ferc.gov) under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docsfiling/efiling/ document-less-intervention.pdf.; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below.6 Your motion to intervene must reference the project docket number CP21–446–000. Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Motions to intervene must be served on the applicant either by mail or email at: 700 Louisiana Street, Suite 1300, Houston, Texas, or by email at john_ ryan@tcenergy.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 7 motions to intervene are automatically granted by operation of Rule 214(c)(1).8 Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.9 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) of all documents filed by the applicant and by all other parties. 6 Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. 7 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 8 18 CFR 385.214(c)(1). 9 18 CFR 385.214(b)(3) and (d). VerDate Sep<11>2014 17:28 May 27, 2021 Jkt 253001 Tracking the Proceeding DEPARTMENT OF ENERGY Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docsfiling/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on June 10, 2021. Dated: May 20, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–11348 Filed 5–27–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3309–021] Marlow Hydro, LLC; Notice of Effectiveness of Withdrawal of License Application On December 1, 2020, Marlow Hydro, LLC (Marlow Hydro) filed an application for a subsequent license for the 225-kilowatt Nash Mill Dam Hydroelectric Project No. 3309. On May 5, 2020, Marlow Hydro filed a notice of withdrawal of its application. No motion in opposition to the notice of withdrawal has been filed, and the Commission has taken no action to disallow the withdrawal. Pursuant to Rule 216(b) of the Commission’s Rules of Practice and Procedure,1 the withdrawal of the application became effective on May 21, 2021, and this proceeding is hereby terminated. Dated: May 21, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–11337 Filed 5–27–21; 8:45 am] BILLING CODE 6717–01–P 28825 Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP21–832–000. Applicants: Tapstone Energy, LLC, FP Wheeler Midstream, LLC. Description: Joint Petition for Limited Waiver of Capacity Release Regulations, et al. of Tapstone Energy, LLC, et al. Filed Date: 5/19/21. Accession Number: 20210519–5150. Comments Due: 5 p.m. ET 6/1/21. Docket Numbers: RP21–833–000. Applicants: ETC Tiger Pipeline, LLC. Description: § 4(d) Rate Filing: Filed Agreements Housekeeping to be effective 6/21/2021. Filed Date: 5/21/21. Accession Number: 20210521–5054. Comments Due: 5 p.m. ET 6/2/21. Docket Numbers: RP21–834–000. Applicants: Natural Gas Pipeline Company of America. Description: § 4(d) Rate Filing: Amendment to a Negotiated Rate Agreement Filing—La Frontera Holdings, LLC to be effective 6/1/2021. Filed Date: 5/21/21. Accession Number: 20210521–5218. Comments Due: 5 p.m. ET 6/2/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 24, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–11363 Filed 5–27–21; 8:45 am] 1 18 PO 00000 CFR 385.216(b) (2020). Frm 00079 Fmt 4703 Sfmt 9990 BILLING CODE 6717–01–P E:\FR\FM\28MYN1.SGM 28MYN1

Agencies

[Federal Register Volume 86, Number 102 (Friday, May 28, 2021)]
[Notices]
[Page 28825]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-11337]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3309-021]


Marlow Hydro, LLC; Notice of Effectiveness of Withdrawal of 
License Application

    On December 1, 2020, Marlow Hydro, LLC (Marlow Hydro) filed an 
application for a subsequent license for the 225-kilowatt Nash Mill Dam 
Hydroelectric Project No. 3309. On May 5, 2020, Marlow Hydro filed a 
notice of withdrawal of its application.
    No motion in opposition to the notice of withdrawal has been filed, 
and the Commission has taken no action to disallow the withdrawal. 
Pursuant to Rule 216(b) of the Commission's Rules of Practice and 
Procedure,\1\ the withdrawal of the application became effective on May 
21, 2021, and this proceeding is hereby terminated.
---------------------------------------------------------------------------

    \1\ 18 CFR 385.216(b) (2020).

    Dated: May 21, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-11337 Filed 5-27-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.