City of Rock Island, Illinois; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests, 28823 [2021-11336]

Download as PDF Federal Register / Vol. 86, No. 102 / Friday, May 28, 2021 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2936–008] City of Rock Island, Illinois; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for surrender of exemption. b. Project No: P–2936–008. c. Date Filed: April 21, 2021. d. Applicant: City of Rock Island, Illinois. e. Name of Project: Sears Hydroelectric Project. f. Location: The project is located on the Rock River in the City of Rock Island, Rock Island County, Illinois. The project does not occupy any federal lands. g. Filed Pursuant to: Public Utility Regulatory Policies Act of 1978, 16 U.S.C. 2705, 2708. h. Applicant Contact: Michael Bartels, City of Rock Island, IL, 1309 Mill Street, Rock Island, IL 61201, (309) 732–2200, bartels.michael@rigov.org. i. FERC Contact: Diana Shannon, (202) 502–6136, diana.shannon@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: June 21, 2021. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first VerDate Sep<11>2014 17:28 May 27, 2021 Jkt 253001 page of any filing should include the docket number P–2936–008. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The applicant proposes to surrender its exemption. The applicant states the project has been off-line since December 2018 and has become uneconomical to operate. The applicant proposes to decommission the project by removing the power generating equipment, except for the turbines, from the powerhouse. The dams and powerhouse, owned by the state, would remain in place and no ground disturbing activities would occur. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. PO 00000 Frm 00077 Fmt 4703 Sfmt 4703 28823 o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: May 21, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–11336 Filed 5–27–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP21–446–000] ANR Pipeline Company; Notice of Application and Establishing Intervention Deadline Take notice that on May 11, 2021, ANR Pipeline Company (ANR), 700 Louisiana Street, Suite 1300, Houston, TX 77002, filed in the above referenced docket an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act and Part 157 of the Commission’s regulations for its proposed Skunk River Replacement Project. Specifically, ANR requests authorization to abandon and replace approximately 1,880 feet of its 24-inch mainline, designated as Line 0– 100, in Henry County, Iowa. The project will involve the replacement of approximately 1,880 feet of its existing Line 0–100 with the replacement of approximately 1,880 feet of new Line 0– 100, from milepost (MP) 626.65 to MP 627.00. ANR states that the replacement will be done via a horizontal directional drill bore. In addition, ANR estimates the project will cost approximately $4,329,321, all as more fully set forth in the request which is on file with the Commission and open to public inspection. In addition to publishing the full text of this document in the Federal Register, the Commission provides all E:\FR\FM\28MYN1.SGM 28MYN1

Agencies

[Federal Register Volume 86, Number 102 (Friday, May 28, 2021)]
[Notices]
[Page 28823]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-11336]



[[Page 28823]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2936-008]


City of Rock Island, Illinois; Notice of Application for 
Surrender of Exemption, Soliciting Comments, Motions To Intervene, and 
Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Application for surrender of exemption.
    b. Project No: P-2936-008.
    c. Date Filed: April 21, 2021.
    d. Applicant: City of Rock Island, Illinois.
    e. Name of Project: Sears Hydroelectric Project.
    f. Location: The project is located on the Rock River in the City 
of Rock Island, Rock Island County, Illinois. The project does not 
occupy any federal lands.
    g. Filed Pursuant to: Public Utility Regulatory Policies Act of 
1978, 16 U.S.C. 2705, 2708.
    h. Applicant Contact: Michael Bartels, City of Rock Island, IL, 
1309 Mill Street, Rock Island, IL 61201, (309) 732-2200, 
[email protected].
    i. FERC Contact: Diana Shannon, (202) 502-6136, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: June 21, 2021.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include the docket number P-2936-008. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The applicant proposes to surrender its 
exemption. The applicant states the project has been off-line since 
December 2018 and has become uneconomical to operate. The applicant 
proposes to decommission the project by removing the power generating 
equipment, except for the turbines, from the powerhouse. The dams and 
powerhouse, owned by the state, would remain in place and no ground 
disturbing activities would occur.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: May 21, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-11336 Filed 5-27-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.