Combined Notice of Filings, 27842-27843 [2021-10850]

Download as PDF 27842 Federal Register / Vol. 86, No. 98 / Monday, May 24, 2021 / Notices In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: May 17, 2021. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2021–10851 Filed 5–21–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD21–10–000] Modernizing Electricity Market Design; Supplemental Notice of Technical Conference on Resource Adequacy in the Evolving Electricity Sector: ISO New England Inc (Commission) will convene a Commissioner-led technical conference in the above-referenced proceeding on May 25, 2021, from approximately 9:00 a.m. to 4:15 p.m. Eastern time. The conference will be held remotely. Attached to this Supplemental Notice is an agenda for the technical conference. Commissioners may attend and participate in the technical conference. Discussions at the conference may involve issues raised in proceedings that are currently pending before the Commission. These proceedings include, but are not limited to: As first announced in the Notice of Technical Conference issued in this proceeding on April 22, 2021, the Federal Energy Regulatory Commission Docket Nos. khammond on DSKJM1Z7X2PROD with NOTICES ISO New England Inc ............................................................................................ ISO New England Inc ............................................................................................ New England Power Generators Ass’n, Inc. v. ISO New England Inc ................. ISO New England Inc ............................................................................................ ISO New England Inc., New England Power Pool Participants Committee ......... Independent Market Monitor for PJM v. PJM Interconnection, L.L.C ................... Office of the People’s Counsel for D.C. et al. v. PJM Interconnection ................. PJM Interconnection, L.L.C .................................................................................... PJM Interconnection, L.L.C .................................................................................... New York Independent System Operator, Inc ....................................................... New York State Public Service Commission, et al. v. New York Independent System Operator, Inc. New York Independent System Operator, Inc ....................................................... New York Independent System Operator, Inc ....................................................... New York Independent System Operator, Inc ....................................................... Cricket Valley Energy Center LLC and Empire Generating Company, LLC v. New York Independent System Operator, Inc. The conference will be open for the public to attend remotely. There is no fee for attendance. Information on this technical conference, including a link to the webcast, will be posted on the conference’s event page on the Commission’s website (https:// www.ferc.gov/news-events/events/ technical-conference-regardingwholesale-markets-administered-isonew-england) prior to the event. The conference will be transcribed. Transcripts will be available for a fee from Ace Reporting at (202) 347–3700. Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov or call toll free (866) 208–3372 (voice) or (202) 208–8659 (TTY), or send a fax to (202) 208–2106 with the required accommodations. For more information about this technical conference, please contact VerDate Sep<11>2014 17:32 May 21, 2021 Jkt 253001 ER21–787–000. ER21–943–000. EL21–26–000. ER21–1226–000. ER21–1637–000. EL19–47–000. EL19–63–000. EL19–100–000. ER21–278–000 and ER21–278–001. ER20–1718–002. EL16–92–004 and ER17–996–004. ER16–1404–005, ER16–1404–006, and ER16–1404–007. ER21–502–000 and ER21–502–001. ER21–1018–000. EL21–7–000. David Rosner at david.rosner@ferc.gov or (202) 502–8479 or Emma Nicholson at emma.nicholson@ferc.gov or (202) 502–8741. For legal information, please contact Meghan O’Brien at meghan.o’brien@ferc.gov or (202) 502– 6137. For information related to logistics, please contact Sarah McKinley at sarah.mckinley@ferc.gov or (202) 502–8368. Dated: May 17, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–10826 Filed 5–21–21; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP21–824–000. Applicants: Northern Border Pipeline Company. Description: § 4(d) Rate Filing: Seasonal Rates Invoicing Update to be effective 6/15/2021. Filed Date: 5/14/21. Accession Number: 20210514–5090. Comments Due: 5 p.m. ET 5/26/21. Docket Numbers: RP21–825–000. Applicants: Rockies Express Pipeline LLC. Description: Compliance filing REX 2021 Annual Penalty Charge Reconciliation. Filed Date: 5/14/21. E:\FR\FM\24MYN1.SGM 24MYN1 Federal Register / Vol. 86, No. 98 / Monday, May 24, 2021 / Notices Accession Number: 20210514–5179. Comments Due: 5 p.m. ET 5/26/21. Docket Numbers: RP21–826–000. Applicants: Tallgrass Interstate Gas Transmission, LLC. Description: Compliance filing TIGT 2021 Annual Penalty Charge Reconciliation. Filed Date: 5/14/21. Accession Number: 20210514–5180. Comments Due: 5 p.m. ET 5/26/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 17, 2021. Debbie-Anne A. Reese, Deputy Secretary. questions. Commenters are also invited to reference material previously filed in this docket but are encouraged to avoid repetition or replication of previous material. Comments must be submitted on or before 45 days from the date of this Notice. Comments may be filed electronically via the internet.1 Instructions are available on the Commission’s website https://www.ferc.gov/docs-filing/ efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, submissions sent via the U.S. Postal Service must be addressed to: Federal Energy Regulatory Commission, Office of the Secretary, 888 First Street NE, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Federal Energy Regulatory Commission, Office of the Secretary, 12225 Wilkins Avenue, Rockville, Maryland 20852. For more information about this Notice, please contact: Michael Hill (Technical Information), Office of Energy Policy and Innovation, (202) 502–8703, Michael.Hill@ferc.gov Sarah Greenberg (Legal Information), Office of the General Counsel, (202) 502–6230, Sarah.Greenberg@ferc.gov Dated: May 17, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–10850 Filed 5–21–21; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2021–10836 Filed 5–21–21; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Docket No. AD21–12–000] khammond on DSKJM1Z7X2PROD with NOTICES Electrification and the Grid of the Future; Notice Inviting Post-Technical Conference Comments On April 29, 2021, the Federal Energy Regulatory Commission (Commission) convened a technical conference to discuss electrification and the grid of the future. All interested persons are invited to file post-technical conference comments to address issues raised during the technical conference and identified in the Supplemental Notice of Technical Conference issued April 14, 2021. For reference, the questions included in the Supplemental Notice are included below. Commenters need not answer all of the questions, but commenters are encouraged to organize responses using the numbering and order in the below VerDate Sep<11>2014 17:32 May 21, 2021 Jkt 253001 Federal Energy Regulatory Commission [Project No. 3253–015] Mad River Power Associates; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 3253–015. c. Date Filed: November 3, 2020. d. Submitted By: Mad River Power Associates (MRPA). e. Name of Project: Campton Hydroelectric Project (project). f. Location: On the Mad River in Grafton County, New Hampshire. The 1 See PO 00000 18 CFR 385.2001(a)(1)(iii) (2020). Frm 00019 Fmt 4703 Sfmt 4703 27843 project occupies approximately 0.05 acre of federal land administered by the U.S. Forest Service. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Ian Clark, Mad River Power Associates, 1 Pepsi Way, Suite 6n75, Katonah, NY 10536; Phone at (914) 297–7645, or email at info@dichotomycapital.com. i. FERC Contact: Amanda Gill at (202) 502–6773; or email at amanda.gill@ ferc.gov. j. Deadline for filing scoping comments: June 17, 2021. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Campton Hydroelectric Project (P–3253–015). The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. The application is not ready for environmental analysis at this time. l. The existing Campton Project is located at the Forest Service’s Campton Dam and Pond, and consists of: (1) A 22-foot-wide, 24-foot-high concrete intake structure located approximately 60 feet upstream of the Campton Dam on the east shoreline of Campton Pond, that includes a 25-foot-long,13-foot-high trashrack with 1.75-inch clear bar E:\FR\FM\24MYN1.SGM 24MYN1

Agencies

[Federal Register Volume 86, Number 98 (Monday, May 24, 2021)]
[Notices]
[Pages 27842-27843]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-10850]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

    Docket Numbers: RP21-824-000.
    Applicants: Northern Border Pipeline Company.
    Description: Sec.  4(d) Rate Filing: Seasonal Rates Invoicing 
Update to be effective 6/15/2021.
    Filed Date: 5/14/21.
    Accession Number: 20210514-5090.
    Comments Due: 5 p.m. ET 5/26/21.

    Docket Numbers: RP21-825-000.
    Applicants: Rockies Express Pipeline LLC.
    Description: Compliance filing REX 2021 Annual Penalty Charge 
Reconciliation.
    Filed Date: 5/14/21.

[[Page 27843]]

    Accession Number: 20210514-5179.
    Comments Due: 5 p.m. ET 5/26/21.

    Docket Numbers: RP21-826-000.
    Applicants: Tallgrass Interstate Gas Transmission, LLC.
    Description: Compliance filing TIGT 2021 Annual Penalty Charge 
Reconciliation.
    Filed Date: 5/14/21.
    Accession Number: 20210514-5180.
    Comments Due: 5 p.m. ET 5/26/21.

    The filings are accessible in the Commission's eLibrary system 
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying 
the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: May 17, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-10850 Filed 5-21-21; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.