Combined Notice of Filings #1, 27844-27846 [2021-10849]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
27844
Federal Register / Vol. 86, No. 98 / Monday, May 24, 2021 / Notices
spacing; (2) a 600-foot-long, 78-inchdiameter underground steel penstock
that trifurcates into three 48-inchdiameter sections measuring 20 feet, 30
feet, and 43 feet in length, respectively;
(3) a 43-foot-long, 30-foot-wide
powerhouse located on the east side of
the Mad River that contains a 167-kW
Francis turbine-generator unit; (4) two
236-kW submersible Flygt turbinegenerator units located outside of the
powerhouse; (5) an approximately 55foot-long, 40-foot-wide tailrace; (6) a
200-foot-long transmission line and a
33.5-kilovolt transformer that connects
the generators to the electric grid; (7) an
Atlantic salmon smolt bypass facility
consisting of an 85-foot-long, 20-inch
diameter cast iron pipe that empties into
an 3.5-foot-deep plunge pool
approximately 15 feet downstream of
the dam; and (8) appurtenant facilities.
The project creates an approximately
600-foot-long bypassed reach of the Mad
River.
MRPA currently has a Special Use
Permit from the Forest Service for
operation and maintenance of the
Campton Project. MRPA voluntarily
operates the project as a run-of-release
facility. Each Flyght turbine unit has a
minimum and maximum hydraulic
capacity of 74 cubic feet per second (cfs)
and 89 cfs, respectively, and the Francis
turbine unit has a minimum and
maximum hydraulic capacity of 23 cfs
and 60 cfs, respectively. When
generating electricity, water released
from Campton Pond, is diverted through
the intake structure and the penstock, to
the turbines, where it is then discharged
to the project tailrace and the Mad
River.
The current license requires: (1)
Inflow to be discharged over the
spillway to the bypassed reach during
periods of non-generation or when
inflow is less than 25 cfs; (2) a
minimum flow of 4.5 cfs through the
smolt bypass facility during periods of
generation or when inflow is greater
than 25 cfs; and (3) operation of the
smolt bypass facility from mid-April to
mid-June. The average annual energy
production of the project from 2007
through 2018 was 1,170 MWh.
MRPA proposes to: (1) Continue
operating the project in a run-of-release
mode; (2) replace one of the 236-kW
Flygt turbine-generator units with a new
340-kW Flygt turbine-generator unit, for
a total installed capacity of 743 kW at
the project; (3) release a minimum flow
of 29 cfs or inflow, whichever is less,
over the dam to the bypassed reach; and
(4) close the existing smolt bypass
facility. MRPA estimates that the
average annual generation of the
VerDate Sep<11>2014
17:32 May 21, 2021
Jkt 253001
proposed project will be approximately
1,900 MWh.
m. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents via the
internet through the Commission’s
Home Page (https://www.ferc.gov) using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
n. You may also register online at
https://ferconline.ferc.gov/
FERCOnline.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process.
Commission staff will prepare either
an environmental assessment (EA) or an
Environmental Impact Statement (EIS)
that describes and evaluates the
probable effects, if any, of the licensee’s
proposed action and alternatives. The
EA or EIS will consider environmental
impacts and reasonable alternatives to
the proposed action. The Commission’s
scoping process will help determine the
required level of analysis and satisfy the
NEPA scoping requirements,
irrespective of whether the Commission
prepares an EA or an EIS. Due to
concerns with large gatherings related to
COVID–19, we do not intend to conduct
a public scoping meeting and site visit
in this case. Instead, we are soliciting
written comments and suggestions on
the preliminary list of issues and
alternatives to be addressed in the
NEPA document, as described in
scoping document 1 (SD1), issued May
18, 2021.
Copies of the SD1 outlining the
subject areas to be addressed in the
NEPA document were distributed to the
parties on the Commission’s mailing list
and the applicant’s distribution list.
Copies of SD1 may be viewed on the
web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call 1–866–
208–3676 or for TTY, (202) 502–8659.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Dated: May 18, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–10887 Filed 5–21–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–68–000.
Applicants: Oleander Power Project,
LP.
Description: Response to May 4, 2021
Deficiency Letter of Oleander Power
Project, Limited Partnership Power
Holding LLC.
Filed Date: 5/14/21.
Accession Number: 20210514–5212.
Comments Due: 5 p.m. ET 5/28/21.
Docket Numbers: EC21–94–000.
Applicants: Constellation Holdings,
LLC, Albany Green Energy, LLC.
Description: Application for
Authorization Under Section 203 of the
Federal Power Act, et al. of
Constellation Holdings, LLC, et al.
Filed Date: 5/14/21.
Accession Number: 20210514–5215.
Comments Due: 5 p.m. ET 6/4/21.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–147–000.
Applicants: Black Rock Wind Force,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status, LLC of Black Rock
Wind Force, LLC.
Filed Date: 5/17/21.
Accession Number: 20210517–5077.
Comments Due: 5 p.m. ET 6/7/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–738–008;
ER10–1186–011; ER10–1329–011;
ER11–2731–004; ER11–3097–012;
ER12–421–004.
Applicants: DTE Electric Company,
DTE Energy Trading, Inc., DTE Energy
Supply, LLC, DTE Garden Wind Farm,
LLC, DTE Stoney Corners Wind Farm,
LLC, St. Paul Cogeneration, LLC.
Description: Notice of Non-Material
Change in Status of DTE MBR Entities.
Filed Date: 5/14/21.
Accession Number: 20210514–5205.
Comments Due: 5 p.m. ET 6/4/21.
Docket Numbers: ER16–2320–007.
E:\FR\FM\24MYN1.SGM
24MYN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 86, No. 98 / Monday, May 24, 2021 / Notices
Applicants: Pacific Gas and Electric
Company.
Description: Compliance filing: TO18
Order on Rehearing Compliance Filing
to be effective N/A.
Filed Date: 5/17/21.
Accession Number: 20210517–5091.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER19–2585–003.
Applicants: Florida Power & Light
Company.
Description: Compliance filing:
Compliance Filing Revising Tariff
Records to Reflect Approved Settlement
to be effective 4/1/2020.
Filed Date: 5/17/21.
Accession Number: 20210517–5125.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER20–1831–001.
Applicants: UGI Utilities, Inc., PJM
Interconnection, L.L.C.
Description: Compliance filing: UGI
Utilities, Inc. submits Compliance Filing
in ER20–1831 re: Order 864 to be
effective 1/27/2020.
Filed Date: 5/17/21.
Accession Number: 20210517–5145.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1670–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2021–05–17_SA 3424 ATC-Wisconsin
Electric Power Substitute 1st Rev GIA
(J871) to be effective 3/30/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5135.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1905–001.
Applicants: NextEra Energy
Transmission MidAtlantic Indiana, Inc.,
PJM Interconnection, L.L.C.
Description: Tariff Amendment: NEET
MidAtlantic IN submits Errata to IA, SA
No. 5801 with NIPSCO to be effective
4/2/2021.
Filed Date: 5/14/21.
Accession Number: 20210514–5192.
Comments Due: 5 p.m. ET 6/4/21.
Docket Numbers: ER21–1918–000.
Applicants: Algonquin Energy
Services Inc.
Description: § 205(d) Rate Filing:
Revisions to AES Market-Based Rate
Tariff to be effective 6/30/2021.
Filed Date: 5/14/21.
Accession Number: 20210514–5217.
Comments Due: 5 p.m. ET 6/4/21.
Docket Numbers: ER21–1919–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Enhancements to PJM Dispatch and
Pricing ? The Long-Term Reforms to be
effective 11/1/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5042.
VerDate Sep<11>2014
17:32 May 21, 2021
Jkt 253001
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1920–000.
Applicants: ALLETE, Inc.
Description: § 205(d) Rate Filing:
Certificate of Concurrence (Original
TCRA) to be effective 9/1/2015.
Filed Date: 5/17/21.
Accession Number: 20210517–5052.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1921–000.
Applicants: Citadel Energy Marketing
LLC.
Description: Baseline eTariff Filing:
Baseline new to be effective 5/18/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5056.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1922–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
2021–05–17_SA 3028 Ameren IL-Prairie
Power Project #20 Taylorville to be
effective 7/17/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5064.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1923–000.
Applicants: Black Rock Wind Force,
LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization and Request for Waivers
to be effective 7/17/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5068.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1924–000.
Applicants: ALLETE, Inc.
Description: § 205(d) Rate Filing:
Certificate of Concurrence (Amended
TCRA) to be effective 2/16/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5070.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1925–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Amended LGIA Kramer Junction 8
Project TOT697QFC SA No. 247 to be
effective 7/17/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5087.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1926–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) Rate Filing: LGE
and KU_Rhudes Creek Provisional Large
Generator Interconnection Agreement to
be effective 5/7/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5115.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1927–000.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
27845
Applicants: American Electric Power
Service Corporation, Ohio Power
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing: AEP
submits the Buckhorn FA re: ILDSA SA
No. 1336 to be effective 7/17/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5123.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1928–000.
Applicants: Diamond Energy East,
LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Revised
Market-Based Rate Tariffs to be effective
5/18/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5126.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1929–000.
Applicants: Diamond Energy NE, LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Revised
Market-Based Rate Tariffs to be effective
5/18/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5129.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1930–000.
Applicants: Diamond Energy NY,
LLC.
Description: § 205(d) Rate Filing:
Notice of Succession and Revised
Market-Based Rate Tariffs to be effective
5/18/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5134.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1931–000.
Applicants: UGI Utilities Inc., PJM
Interconnection, L.L.C.
Description: Compliance filing: UGI
Utilities, Inc. Submits Single-Issue
Audit Compliance Filing to be effective
7/19/2021.
Filed Date: 5/17/21.
Accession Number: 20210517–5153.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21–1932–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, SA No. 5473;
Queue No. AC1–054 to be effective
8/27/2019.
Filed Date: 5/17/21.
Accession Number: 20210517–5155.
Comments Due: 5 p.m. ET 6/7/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
E:\FR\FM\24MYN1.SGM
24MYN1
27846
Federal Register / Vol. 86, No. 98 / Monday, May 24, 2021 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 17, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–10849 Filed 5–21–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2934–031]
khammond on DSKJM1Z7X2PROD with NOTICES
New York State Electric & Gas
Corporation; Notice of Application for
Amendment of License, Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Request for
temporary amendment of Article 402.
b. Project No.: 2934–031.
c. Date Filed: March 31, 2021, and
supplemented April 22, 2021.
d. Licensee: New York State Electric &
Gas Corporation.
e. Name of Project: Upper
Mechanicville Hydroelectric Project.
f. Location: The project is located on
the Hudson River in Saratoga and
Rensselaer counties, New York.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Licensee Contact: Mr. David W.
Dick, New York State Electric & Gas
Corporation, 89 East Avenue, Rochester,
NY 14649, (585) 724–8535, david_dick@
rge.com.
i. FERC Contact: Jeremy Jessup, (202)
502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is 30
days from the issuance date of this
notice by the Commission.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
VerDate Sep<11>2014
17:32 May 21, 2021
Jkt 253001
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. The first page of
any filing should include docket
number P–2934–031. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
applicant proposes to temporarily
amend Article 402 of the license until
December 2023. The licensee has
identified that the majority of the
inflatable crest gate bladders have
reached their service life and require
replacement. The licensee is proposing
to lower the impoundment elevation
requirement from 72 inches or greater
above the fixed spillway to 50 inches or
greater above the fixed spillway. The
licensee states this will limit the
continuous load on the fully inflated
bladders until the replacement and
upgrade of the remaining bladders. The
licensee will continue to operate the
project in run-of-river mode and provide
the seasonal minimum bypass flow
beginning on May 1, 2021.
l. Locations of the Application: This
filing may be viewed on the
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: May 18, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–10888 Filed 5–21–21; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\24MYN1.SGM
24MYN1
Agencies
[Federal Register Volume 86, Number 98 (Monday, May 24, 2021)]
[Notices]
[Pages 27844-27846]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-10849]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC21-68-000.
Applicants: Oleander Power Project, LP.
Description: Response to May 4, 2021 Deficiency Letter of Oleander
Power Project, Limited Partnership Power Holding LLC.
Filed Date: 5/14/21.
Accession Number: 20210514-5212.
Comments Due: 5 p.m. ET 5/28/21.
Docket Numbers: EC21-94-000.
Applicants: Constellation Holdings, LLC, Albany Green Energy, LLC.
Description: Application for Authorization Under Section 203 of the
Federal Power Act, et al. of Constellation Holdings, LLC, et al.
Filed Date: 5/14/21.
Accession Number: 20210514-5215.
Comments Due: 5 p.m. ET 6/4/21.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-147-000.
Applicants: Black Rock Wind Force, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status, LLC of Black Rock Wind Force, LLC.
Filed Date: 5/17/21.
Accession Number: 20210517-5077.
Comments Due: 5 p.m. ET 6/7/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-738-008; ER10-1186-011; ER10-1329-011; ER11-
2731-004; ER11-3097-012; ER12-421-004.
Applicants: DTE Electric Company, DTE Energy Trading, Inc., DTE
Energy Supply, LLC, DTE Garden Wind Farm, LLC, DTE Stoney Corners Wind
Farm, LLC, St. Paul Cogeneration, LLC.
Description: Notice of Non-Material Change in Status of DTE MBR
Entities.
Filed Date: 5/14/21.
Accession Number: 20210514-5205.
Comments Due: 5 p.m. ET 6/4/21.
Docket Numbers: ER16-2320-007.
[[Page 27845]]
Applicants: Pacific Gas and Electric Company.
Description: Compliance filing: TO18 Order on Rehearing Compliance
Filing to be effective N/A.
Filed Date: 5/17/21.
Accession Number: 20210517-5091.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER19-2585-003.
Applicants: Florida Power & Light Company.
Description: Compliance filing: Compliance Filing Revising Tariff
Records to Reflect Approved Settlement to be effective 4/1/2020.
Filed Date: 5/17/21.
Accession Number: 20210517-5125.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER20-1831-001.
Applicants: UGI Utilities, Inc., PJM Interconnection, L.L.C.
Description: Compliance filing: UGI Utilities, Inc. submits
Compliance Filing in ER20-1831 re: Order 864 to be effective 1/27/2020.
Filed Date: 5/17/21.
Accession Number: 20210517-5145.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1670-001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Tariff Amendment: 2021-05-17_SA 3424 ATC-Wisconsin
Electric Power Substitute 1st Rev GIA (J871) to be effective 3/30/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5135.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1905-001.
Applicants: NextEra Energy Transmission MidAtlantic Indiana, Inc.,
PJM Interconnection, L.L.C.
Description: Tariff Amendment: NEET MidAtlantic IN submits Errata
to IA, SA No. 5801 with NIPSCO to be effective 4/2/2021.
Filed Date: 5/14/21.
Accession Number: 20210514-5192.
Comments Due: 5 p.m. ET 6/4/21.
Docket Numbers: ER21-1918-000.
Applicants: Algonquin Energy Services Inc.
Description: Sec. 205(d) Rate Filing: Revisions to AES Market-
Based Rate Tariff to be effective 6/30/2021.
Filed Date: 5/14/21.
Accession Number: 20210514-5217.
Comments Due: 5 p.m. ET 6/4/21.
Docket Numbers: ER21-1919-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Enhancements to PJM Dispatch
and Pricing ? The Long-Term Reforms to be effective 11/1/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5042.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1920-000.
Applicants: ALLETE, Inc.
Description: Sec. 205(d) Rate Filing: Certificate of Concurrence
(Original TCRA) to be effective 9/1/2015.
Filed Date: 5/17/21.
Accession Number: 20210517-5052.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1921-000.
Applicants: Citadel Energy Marketing LLC.
Description: Baseline eTariff Filing: Baseline new to be effective
5/18/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5056.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1922-000.
Applicants: Midcontinent Independent System Operator, Inc., Ameren
Illinois Company.
Description: Sec. 205(d) Rate Filing: 2021-05-17_SA 3028 Ameren
IL-Prairie Power Project #20 Taylorville to be effective 7/17/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5064.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1923-000.
Applicants: Black Rock Wind Force, LLC.
Description: Baseline eTariff Filing: Application for Market-Based
Rate Authorization and Request for Waivers to be effective 7/17/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5068.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1924-000.
Applicants: ALLETE, Inc.
Description: Sec. 205(d) Rate Filing: Certificate of Concurrence
(Amended TCRA) to be effective 2/16/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5070.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1925-000.
Applicants: Southern California Edison Company.
Description: Sec. 205(d) Rate Filing: Amended LGIA Kramer Junction
8 Project TOT697QFC SA No. 247 to be effective 7/17/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5087.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1926-000.
Applicants: Louisville Gas and Electric Company.
Description: Sec. 205(d) Rate Filing: LGE and KU_Rhudes Creek
Provisional Large Generator Interconnection Agreement to be effective
5/7/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5115.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1927-000.
Applicants: American Electric Power Service Corporation, Ohio Power
Company, PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: AEP submits the Buckhorn FA
re: ILDSA SA No. 1336 to be effective 7/17/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5123.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1928-000.
Applicants: Diamond Energy East, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revised Market-Based Rate Tariffs to be effective 5/18/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5126.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1929-000.
Applicants: Diamond Energy NE, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revised Market-Based Rate Tariffs to be effective 5/18/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5129.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1930-000.
Applicants: Diamond Energy NY, LLC.
Description: Sec. 205(d) Rate Filing: Notice of Succession and
Revised Market-Based Rate Tariffs to be effective 5/18/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5134.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1931-000.
Applicants: UGI Utilities Inc., PJM Interconnection, L.L.C.
Description: Compliance filing: UGI Utilities, Inc. Submits Single-
Issue Audit Compliance Filing to be effective 7/19/2021.
Filed Date: 5/17/21.
Accession Number: 20210517-5153.
Comments Due: 5 p.m. ET 6/7/21.
Docket Numbers: ER21-1932-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Amendment to ISA, SA No.
5473; Queue No. AC1-054 to be effective 8/27/2019.
Filed Date: 5/17/21.
Accession Number: 20210517-5155.
Comments Due: 5 p.m. ET 6/7/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's
[[Page 27846]]
Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date. Protests may be considered, but
intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 17, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-10849 Filed 5-21-21; 8:45 am]