Electrification and the Grid of the Future; Notice Inviting Post-Technical Conference Comments, 27843 [2021-10836]

Download as PDF Federal Register / Vol. 86, No. 98 / Monday, May 24, 2021 / Notices Accession Number: 20210514–5179. Comments Due: 5 p.m. ET 5/26/21. Docket Numbers: RP21–826–000. Applicants: Tallgrass Interstate Gas Transmission, LLC. Description: Compliance filing TIGT 2021 Annual Penalty Charge Reconciliation. Filed Date: 5/14/21. Accession Number: 20210514–5180. Comments Due: 5 p.m. ET 5/26/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 17, 2021. Debbie-Anne A. Reese, Deputy Secretary. questions. Commenters are also invited to reference material previously filed in this docket but are encouraged to avoid repetition or replication of previous material. Comments must be submitted on or before 45 days from the date of this Notice. Comments may be filed electronically via the internet.1 Instructions are available on the Commission’s website https://www.ferc.gov/docs-filing/ efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, submissions sent via the U.S. Postal Service must be addressed to: Federal Energy Regulatory Commission, Office of the Secretary, 888 First Street NE, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Federal Energy Regulatory Commission, Office of the Secretary, 12225 Wilkins Avenue, Rockville, Maryland 20852. For more information about this Notice, please contact: Michael Hill (Technical Information), Office of Energy Policy and Innovation, (202) 502–8703, Michael.Hill@ferc.gov Sarah Greenberg (Legal Information), Office of the General Counsel, (202) 502–6230, Sarah.Greenberg@ferc.gov Dated: May 17, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–10850 Filed 5–21–21; 8:45 am] BILLING CODE 6717–01–P [FR Doc. 2021–10836 Filed 5–21–21; 8:45 am] DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Docket No. AD21–12–000] khammond on DSKJM1Z7X2PROD with NOTICES Electrification and the Grid of the Future; Notice Inviting Post-Technical Conference Comments On April 29, 2021, the Federal Energy Regulatory Commission (Commission) convened a technical conference to discuss electrification and the grid of the future. All interested persons are invited to file post-technical conference comments to address issues raised during the technical conference and identified in the Supplemental Notice of Technical Conference issued April 14, 2021. For reference, the questions included in the Supplemental Notice are included below. Commenters need not answer all of the questions, but commenters are encouraged to organize responses using the numbering and order in the below VerDate Sep<11>2014 17:32 May 21, 2021 Jkt 253001 Federal Energy Regulatory Commission [Project No. 3253–015] Mad River Power Associates; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: 3253–015. c. Date Filed: November 3, 2020. d. Submitted By: Mad River Power Associates (MRPA). e. Name of Project: Campton Hydroelectric Project (project). f. Location: On the Mad River in Grafton County, New Hampshire. The 1 See PO 00000 18 CFR 385.2001(a)(1)(iii) (2020). Frm 00019 Fmt 4703 Sfmt 4703 27843 project occupies approximately 0.05 acre of federal land administered by the U.S. Forest Service. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Ian Clark, Mad River Power Associates, 1 Pepsi Way, Suite 6n75, Katonah, NY 10536; Phone at (914) 297–7645, or email at info@dichotomycapital.com. i. FERC Contact: Amanda Gill at (202) 502–6773; or email at amanda.gill@ ferc.gov. j. Deadline for filing scoping comments: June 17, 2021. The Commission strongly encourages electronic filing. Please file scoping comments using the Commission’s eFiling system at https:// ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Campton Hydroelectric Project (P–3253–015). The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. The application is not ready for environmental analysis at this time. l. The existing Campton Project is located at the Forest Service’s Campton Dam and Pond, and consists of: (1) A 22-foot-wide, 24-foot-high concrete intake structure located approximately 60 feet upstream of the Campton Dam on the east shoreline of Campton Pond, that includes a 25-foot-long,13-foot-high trashrack with 1.75-inch clear bar E:\FR\FM\24MYN1.SGM 24MYN1

Agencies

[Federal Register Volume 86, Number 98 (Monday, May 24, 2021)]
[Notices]
[Page 27843]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-10836]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. AD21-12-000]


Electrification and the Grid of the Future; Notice Inviting Post-
Technical Conference Comments

    On April 29, 2021, the Federal Energy Regulatory Commission 
(Commission) convened a technical conference to discuss electrification 
and the grid of the future.
    All interested persons are invited to file post-technical 
conference comments to address issues raised during the technical 
conference and identified in the Supplemental Notice of Technical 
Conference issued April 14, 2021. For reference, the questions included 
in the Supplemental Notice are included below. Commenters need not 
answer all of the questions, but commenters are encouraged to organize 
responses using the numbering and order in the below questions. 
Commenters are also invited to reference material previously filed in 
this docket but are encouraged to avoid repetition or replication of 
previous material. Comments must be submitted on or before 45 days from 
the date of this Notice.
    Comments may be filed electronically via the internet.\1\ 
Instructions are available on the Commission's website https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact 
FERC Online Support at [email protected] or toll free at 1-
866-208-3676, or for TTY, (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, submissions sent via the U.S. Postal Service must 
be addressed to: Federal Energy Regulatory Commission, Office of the 
Secretary, 888 First Street NE, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Federal Energy Regulatory 
Commission, Office of the Secretary, 12225 Wilkins Avenue, Rockville, 
Maryland 20852.
---------------------------------------------------------------------------

    \1\ See 18 CFR 385.2001(a)(1)(iii) (2020).
---------------------------------------------------------------------------

    For more information about this Notice, please contact:

Michael Hill (Technical Information), Office of Energy Policy and 
Innovation, (202) 502-8703, [email protected]
Sarah Greenberg (Legal Information), Office of the General Counsel, 
(202) 502-6230, [email protected]

    Dated: May 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-10836 Filed 5-21-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.