Electrification and the Grid of the Future; Notice Inviting Post-Technical Conference Comments, 27843 [2021-10836]
Download as PDF
Federal Register / Vol. 86, No. 98 / Monday, May 24, 2021 / Notices
Accession Number: 20210514–5179.
Comments Due: 5 p.m. ET 5/26/21.
Docket Numbers: RP21–826–000.
Applicants: Tallgrass Interstate Gas
Transmission, LLC.
Description: Compliance filing TIGT
2021 Annual Penalty Charge
Reconciliation.
Filed Date: 5/14/21.
Accession Number: 20210514–5180.
Comments Due: 5 p.m. ET 5/26/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 17, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
questions. Commenters are also invited
to reference material previously filed in
this docket but are encouraged to avoid
repetition or replication of previous
material. Comments must be submitted
on or before 45 days from the date of
this Notice.
Comments may be filed electronically
via the internet.1 Instructions are
available on the Commission’s website
https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, submissions
sent via the U.S. Postal Service must be
addressed to: Federal Energy Regulatory
Commission, Office of the Secretary,
888 First Street NE, Washington, DC
20426. Submissions sent via any other
carrier must be addressed to: Federal
Energy Regulatory Commission, Office
of the Secretary, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
For more information about this
Notice, please contact:
Michael Hill (Technical Information),
Office of Energy Policy and
Innovation, (202) 502–8703,
Michael.Hill@ferc.gov
Sarah Greenberg (Legal Information),
Office of the General Counsel, (202)
502–6230, Sarah.Greenberg@ferc.gov
Dated: May 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–10850 Filed 5–21–21; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2021–10836 Filed 5–21–21; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. AD21–12–000]
khammond on DSKJM1Z7X2PROD with NOTICES
Electrification and the Grid of the
Future; Notice Inviting Post-Technical
Conference Comments
On April 29, 2021, the Federal Energy
Regulatory Commission (Commission)
convened a technical conference to
discuss electrification and the grid of
the future.
All interested persons are invited to
file post-technical conference comments
to address issues raised during the
technical conference and identified in
the Supplemental Notice of Technical
Conference issued April 14, 2021. For
reference, the questions included in the
Supplemental Notice are included
below. Commenters need not answer all
of the questions, but commenters are
encouraged to organize responses using
the numbering and order in the below
VerDate Sep<11>2014
17:32 May 21, 2021
Jkt 253001
Federal Energy Regulatory
Commission
[Project No. 3253–015]
Mad River Power Associates; Notice
Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 3253–015.
c. Date Filed: November 3, 2020.
d. Submitted By: Mad River Power
Associates (MRPA).
e. Name of Project: Campton
Hydroelectric Project (project).
f. Location: On the Mad River in
Grafton County, New Hampshire. The
1 See
PO 00000
18 CFR 385.2001(a)(1)(iii) (2020).
Frm 00019
Fmt 4703
Sfmt 4703
27843
project occupies approximately 0.05
acre of federal land administered by the
U.S. Forest Service.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Ian Clark,
Mad River Power Associates, 1 Pepsi
Way, Suite 6n75, Katonah, NY 10536;
Phone at (914) 297–7645, or email at
info@dichotomycapital.com.
i. FERC Contact: Amanda Gill at (202)
502–6773; or email at amanda.gill@
ferc.gov.
j. Deadline for filing scoping
comments: June 17, 2021.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. All filings must clearly identify
the project name and docket number on
the first page: Campton Hydroelectric
Project (P–3253–015).
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. The application is not ready for
environmental analysis at this time.
l. The existing Campton Project is
located at the Forest Service’s Campton
Dam and Pond, and consists of: (1) A
22-foot-wide, 24-foot-high concrete
intake structure located approximately
60 feet upstream of the Campton Dam
on the east shoreline of Campton Pond,
that includes a 25-foot-long,13-foot-high
trashrack with 1.75-inch clear bar
E:\FR\FM\24MYN1.SGM
24MYN1
Agencies
[Federal Register Volume 86, Number 98 (Monday, May 24, 2021)]
[Notices]
[Page 27843]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-10836]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD21-12-000]
Electrification and the Grid of the Future; Notice Inviting Post-
Technical Conference Comments
On April 29, 2021, the Federal Energy Regulatory Commission
(Commission) convened a technical conference to discuss electrification
and the grid of the future.
All interested persons are invited to file post-technical
conference comments to address issues raised during the technical
conference and identified in the Supplemental Notice of Technical
Conference issued April 14, 2021. For reference, the questions included
in the Supplemental Notice are included below. Commenters need not
answer all of the questions, but commenters are encouraged to organize
responses using the numbering and order in the below questions.
Commenters are also invited to reference material previously filed in
this docket but are encouraged to avoid repetition or replication of
previous material. Comments must be submitted on or before 45 days from
the date of this Notice.
Comments may be filed electronically via the internet.\1\
Instructions are available on the Commission's website https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact
FERC Online Support at [email protected] or toll free at 1-
866-208-3676, or for TTY, (202) 502-8659. Although the Commission
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, submissions sent via the U.S. Postal Service must
be addressed to: Federal Energy Regulatory Commission, Office of the
Secretary, 888 First Street NE, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Federal Energy Regulatory
Commission, Office of the Secretary, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
---------------------------------------------------------------------------
\1\ See 18 CFR 385.2001(a)(1)(iii) (2020).
---------------------------------------------------------------------------
For more information about this Notice, please contact:
Michael Hill (Technical Information), Office of Energy Policy and
Innovation, (202) 502-8703, [email protected]
Sarah Greenberg (Legal Information), Office of the General Counsel,
(202) 502-6230, [email protected]
Dated: May 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-10836 Filed 5-21-21; 8:45 am]
BILLING CODE 6717-01-P