Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants, 27119-27120 [2021-10548]
Download as PDF
Federal Register / Vol. 86, No. 95 / Wednesday, May 19, 2021 / Notices
In this notice, OSHA also announces
the final decision to add four new test
standards to the NRTL Program’s List of
Appropriate Test Standards. Table 2,
below, lists the test standards that are
new to the NRTL Program. OSHA
determined that these test standards are
appropriate test standards and will add
27119
them to the NRTL Program’s List of
Appropriate Test Standards.
TABLE 2—TEST STANDARDS OSHA IS ADDING TO THE NRTL PROGRAM’S LIST OF APPROPRIATE TEST STANDARDS
Test standard
Test standard title
UL 61010–2–032 .....
Standard for Safety Requirements for Electrical Equipment for Measurement, Control and Laboratory Use—Part 2–032:
Particular Requirements for Hand-Held and Hand-Manipulated Current Sensors for Electrical Test and Measurement.
Standard for Safety Requirements for Electrical Equipment for Measurement, Control and Laboratory Use—Part 2–033:
Particular Requirements for Hand-Held Multimeters for Domestic and Professional Use, Capable of Measuring Mains
Voltage.
Safety Requirements for Electrical Equipment for Measurement, Control and Laboratory Use—Part 2–040: Particular Requirements for Sterilizers and Washer-Disinfectors Used to Treat Medical Materials.
Safety Requirements for Electrical Equipment for Measurement, Control and Laboratory Use—Part 2–201: Particular Requirements for Control Equipment.
UL 61010–2–033 .....
UL 61010–2–040 .....
UL 61010–2–201 .....
OSHA’s recognition of any NRTL for
a particular test standard is limited to
equipment or materials for which OSHA
standards require third-party testing and
certification before using them in the
workplace. Consequently, if a test
standard also covers any products for
which OSHA does not require such
testing and certification, a NRTL’s scope
of recognition does not include these
products.
The American National Standards
Institute (ANSI) may approve the test
standards listed above as American
National Standards. However, for
convenience, we may use the
designation of the standards-developing
organization for the standard as opposed
to the ANSI designation. Under the
NRTL Program’s policy (see OSHA
Instruction CPL 1–0.3, Appendix C,
paragraph XIV), any NRTL recognized
for a particular test standard may use
either the proprietary version of the test
standard or the ANSI version of that
standard. Contact ANSI to determine
whether a test standard is currently
ANSI-approved.
khammond on DSKJM1Z7X2PROD with NOTICES
A. Conditions
In addition to those conditions
already required by 29 CFR 1910.7, CSA
must abide by the following conditions
of the recognition:
1. CSA must inform OSHA as soon as
possible, in writing, of any change of
ownership, facilities, or key personnel,
and of any major change in its
operations as a NRTL, and provide
details of the change(s);
2. CSA must meet all the terms of its
recognition and comply with all OSHA
policies pertaining to this recognition;
and
3. CSA must continue to meet the
requirements for recognition, including
all previously published conditions on
CSA’s scope of recognition, in all areas
for which it has recognition.
VerDate Sep<11>2014
16:43 May 18, 2021
Jkt 253001
Pursuant to the authority in 29 CFR
1910.7, OSHA hereby expands the scope
of recognition of CSA as a NRTL, subject
to the limitations and conditions
specified above.
III. Authority and Signature
James S. Frederick, Acting Assistant
Secretary of Labor for Occupational
Safety and Health, 200 Constitution
Avenue NW, Washington, DC 20210,
authorized the preparation of this
notice. Accordingly, the agency is
issuing this notice pursuant to Section
29 U.S.C. 655(6)(d), Secretary of Labor’s
Order No. 8–2020 (85 FR 58393; Sept.
18, 2020), and 29 CFR 1910.7.
Signed at Washington, DC, on May 13,
2021.
James S. Frederick,
Acting Assistant Secretary of Labor for
Occupational Safety and Health.
[FR Doc. 2021–10522 Filed 5–18–21; 8:45 am]
BILLING CODE 4510–26–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2021–0035]
Information Collection: Requirements
for Renewal of Operating Licenses for
Nuclear Power Plants
Submit comments by July 19,
2021. Comments received after this date
will be considered if it is practical to do
so, but the Commission is able to ensure
consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any of the following methods;
however, the NRC encourages electronic
comment submission through the
Federal Rulemaking website:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
for Docket ID NRC–2021–0035. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: David Cullison,
Office of the Chief Information Officer,
Mail Stop: T–6 A10M, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
David Cullison, Office of the Chief
Information Officer, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
2084; email: Infocollects.Resource@
nrc.gov.
SUPPLEMENTARY INFORMATION:
DATES:
Nuclear Regulatory
Commission.
ACTION: Renewal of existing information
collection; request for comment.
I. Obtaining Information and
Submitting Comments
The U.S. Nuclear Regulatory
Commission (NRC) invites public
comment on the renewal of Office of
Management and Budget (OMB)
approval for an existing collection of
information. The information collection
is entitled, ‘‘Requirements for Renewal
of Operating Licenses for Nuclear Power
Plants.’’
A. Obtaining Information
Please refer to Docket ID NRC–2021–
0035 when contacting the NRC about
the availability of information for this
action. You may obtain publicly
available information related to this
action by any of the following methods:
• Federal Rulemaking Website: Go to
https://www.regulations.gov and search
AGENCY:
SUMMARY:
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
E:\FR\FM\19MYN1.SGM
19MYN1
27120
Federal Register / Vol. 86, No. 95 / Wednesday, May 19, 2021 / Notices
for Docket ID NRC–2021–0035. A copy
of the collection of information and
related instructions may be obtained
without charge by accessing Docket ID
NRC–2021–0035 on this website.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publicly
available documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘Begin Web-based ADAMS Search.’’ For
problems with ADAMS, please contact
the NRC’s Public Document Room (PDR)
reference staff at 1–800–397–4209, 301–
415–4737, or by email to pdr.resource@
nrc.gov. The supporting statement is
available in ADAMS under Accession
No. ML21004A095.
• Attention: The PDR, where you may
examine and order copies of public
documents, is currently closed. You
may submit your request to the PDR via
email at pdr.resource@nrc.gov or call 1–
800–397–4209 or 301–415–4737,
between 8:00 a.m. and 4:00 p.m. (EST),
Monday through Friday, except Federal
holidays.
• NRC’s Clearance Officer: A copy of
the collection of information and related
instructions may be obtained without
charge by contacting NRC’s Clearance
Officer, David Cullison, Office of the
Chief Information Officer, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001; telephone: 301–415–
2084; email: Infocollects.Resource@
nrc.gov.
khammond on DSKJM1Z7X2PROD with NOTICES
B. Submitting Comments
The NRC encourages electronic
comment submission through the
Federal rulemaking website (https://
www.regulations.gov). Please include
Docket ID NRC–2021–0035 in your
comment submission.
The NRC cautions you not to include
identifying or contact information in
comment submissions that you do not
want to be publicly disclosed in your
comment submission. All comment
submissions are posted at https://
www.regulations.gov/ and entered into
ADAMS. Comment submissions are not
routinely edited to remove identifying
or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
VerDate Sep<11>2014
16:43 May 18, 2021
Jkt 253001
submissions available to the public or
entering the comment into ADAMS.
II. Background
In accordance with the Paperwork
Reduction Act of 1995 (44 U.S.C.
chapter 35), the NRC is requesting
public comment on its intention to
request the OMB’s approval for the
information collection summarized
below.
1. The title of the information
collection: Part 54 of title 10 of the Code
of Federal Regulations (10 CFR),
‘‘Requirements for Renewal of Operating
Licenses for Nuclear Power Plants.’’
2. OMB approval number: 3150–0155.
3. Type of submission: Extension.
4. The form number, if applicable:
Not applicable.
5. How often the collection is required
or requested: There is a one-time
application for any licensee wishing to
renew the operating license for its
nuclear power plant. There is a one-time
requirement for each licensee with a
renewed operating license to submit a
letter documenting the completion of
inspection and testing activities. All
holders of renewed licenses must
perform yearly record keeping.
6. Who will be required or asked to
respond: Commercial nuclear power
plant licensees who wish to renew their
operating licenses and holders of
renewed licenses.
7. The estimated number of annual
responses: 66 (11 reporting responses +
55 recordkeepers).
8. The estimated number of annual
respondents: 62 (1 initial license
renewal application + 1 subsequent
license renewal application + 5
completion letters + 55 recordkeepers).
9. The estimated number of hours
needed annually to comply with the
information collection requirement or
request: 216,700 (160,200 hours
reporting + 56,500 hours
recordkeeping).
10. Abstract: 10 CFR part 54
establishes license renewal
requirements for commercial nuclear
power plants and describes the
information that licensees must submit
to the NRC when applying for a license
renewal. The application must contain
information on how the licensee will
manage the detrimental effects of agerelated degradation on certain plant
systems, structures, and components to
continue the plant’s safe operation
during the renewal term. The NRC
needs this information to determine
whether the licensee’s actions will be
effective in assuring the plants’
continued safe operation during the
period of extended operation. Holders of
renewed licenses must retain in an
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
auditable and retrievable form, for the
term of the renewed operating license,
all information and documentation
required to document compliance with
10 CFR part 54. The NRC needs access
to this information for continuing
effective regulatory oversight.
III. Specific Requests for Comments
The NRC is seeking comments that
address the following questions:
1. Is the proposed collection of
information necessary for the NRC to
properly perform its functions? Does the
information have practical utility?
2. Is the estimate of the burden of the
information collection accurate?
3. Is there a way to enhance the
quality, utility, and clarity of the
information to be collected?
4. How can the burden of the
information collection on respondents
be minimized, including the use of
automated collection techniques or
other forms of information technology?
Dated: May 14, 2021.
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief
Information Officer.
[FR Doc. 2021–10548 Filed 5–18–21; 8:45 am]
BILLING CODE 7590–01–P
POSTAL REGULATORY COMMISSION
[Docket No. CP2021–54]
New Postal Products
Postal Regulatory Commission.
Notice.
AGENCY:
ACTION:
The Commission is noticing a
recent Postal Service filing for the
Commission’s consideration concerning
a negotiated service agreement. This
notice informs the public of the filing,
invites public comment, and takes other
administrative steps.
DATES: Comments are due: May 21,
2021.
SUMMARY:
Submit comments
electronically via the Commission’s
Filing Online system at https://
www.prc.gov. Those who cannot submit
comments electronically should contact
the person identified in the FOR FURTHER
INFORMATION CONTACT section by
telephone for advice on filing
alternatives.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
David A. Trissell, General Counsel, at
202–789–6820.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Introduction
E:\FR\FM\19MYN1.SGM
19MYN1
Agencies
[Federal Register Volume 86, Number 95 (Wednesday, May 19, 2021)]
[Notices]
[Pages 27119-27120]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-10548]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2021-0035]
Information Collection: Requirements for Renewal of Operating
Licenses for Nuclear Power Plants
AGENCY: Nuclear Regulatory Commission.
ACTION: Renewal of existing information collection; request for
comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) invites public
comment on the renewal of Office of Management and Budget (OMB)
approval for an existing collection of information. The information
collection is entitled, ``Requirements for Renewal of Operating
Licenses for Nuclear Power Plants.''
DATES: Submit comments by July 19, 2021. Comments received after this
date will be considered if it is practical to do so, but the Commission
is able to ensure consideration only for comments received on or before
this date.
ADDRESSES: You may submit comments by any of the following methods;
however, the NRC encourages electronic comment submission through the
Federal Rulemaking website:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0035. For
technical questions, contact the individual listed in the FOR FURTHER
INFORMATION CONTACT section of this document.
Mail comments to: David Cullison, Office of the Chief
Information Officer, Mail Stop: T-6 A10M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: David Cullison, Office of the Chief
Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-2084; email:
[email protected].
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2021-0035 when contacting the NRC
about the availability of information for this action. You may obtain
publicly available information related to this action by any of the
following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search
[[Page 27120]]
for Docket ID NRC-2021-0035. A copy of the collection of information
and related instructions may be obtained without charge by accessing
Docket ID NRC-2021-0035 on this website.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``Begin Web-based ADAMS
Search.'' For problems with ADAMS, please contact the NRC's Public
Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or
by email to [email protected]. The supporting statement is available
in ADAMS under Accession No. ML21004A095.
Attention: The PDR, where you may examine and order copies
of public documents, is currently closed. You may submit your request
to the PDR via email at [email protected] or call 1-800-397-4209 or
301-415-4737, between 8:00 a.m. and 4:00 p.m. (EST), Monday through
Friday, except Federal holidays.
NRC's Clearance Officer: A copy of the collection of
information and related instructions may be obtained without charge by
contacting NRC's Clearance Officer, David Cullison, Office of the Chief
Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-2084; email:
[email protected].
B. Submitting Comments
The NRC encourages electronic comment submission through the
Federal rulemaking website (https://www.regulations.gov). Please
include Docket ID NRC-2021-0035 in your comment submission.
The NRC cautions you not to include identifying or contact
information in comment submissions that you do not want to be publicly
disclosed in your comment submission. All comment submissions are
posted at https://www.regulations.gov/ and entered into ADAMS. Comment
submissions are not routinely edited to remove identifying or contact
information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Background
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C.
chapter 35), the NRC is requesting public comment on its intention to
request the OMB's approval for the information collection summarized
below.
1. The title of the information collection: Part 54 of title 10 of
the Code of Federal Regulations (10 CFR), ``Requirements for Renewal of
Operating Licenses for Nuclear Power Plants.''
2. OMB approval number: 3150-0155.
3. Type of submission: Extension.
4. The form number, if applicable: Not applicable.
5. How often the collection is required or requested: There is a
one-time application for any licensee wishing to renew the operating
license for its nuclear power plant. There is a one-time requirement
for each licensee with a renewed operating license to submit a letter
documenting the completion of inspection and testing activities. All
holders of renewed licenses must perform yearly record keeping.
6. Who will be required or asked to respond: Commercial nuclear
power plant licensees who wish to renew their operating licenses and
holders of renewed licenses.
7. The estimated number of annual responses: 66 (11 reporting
responses + 55 recordkeepers).
8. The estimated number of annual respondents: 62 (1 initial
license renewal application + 1 subsequent license renewal application
+ 5 completion letters + 55 recordkeepers).
9. The estimated number of hours needed annually to comply with the
information collection requirement or request: 216,700 (160,200 hours
reporting + 56,500 hours recordkeeping).
10. Abstract: 10 CFR part 54 establishes license renewal
requirements for commercial nuclear power plants and describes the
information that licensees must submit to the NRC when applying for a
license renewal. The application must contain information on how the
licensee will manage the detrimental effects of age-related degradation
on certain plant systems, structures, and components to continue the
plant's safe operation during the renewal term. The NRC needs this
information to determine whether the licensee's actions will be
effective in assuring the plants' continued safe operation during the
period of extended operation. Holders of renewed licenses must retain
in an auditable and retrievable form, for the term of the renewed
operating license, all information and documentation required to
document compliance with 10 CFR part 54. The NRC needs access to this
information for continuing effective regulatory oversight.
III. Specific Requests for Comments
The NRC is seeking comments that address the following questions:
1. Is the proposed collection of information necessary for the NRC
to properly perform its functions? Does the information have practical
utility?
2. Is the estimate of the burden of the information collection
accurate?
3. Is there a way to enhance the quality, utility, and clarity of
the information to be collected?
4. How can the burden of the information collection on respondents
be minimized, including the use of automated collection techniques or
other forms of information technology?
Dated: May 14, 2021.
For the Nuclear Regulatory Commission.
David C. Cullison,
NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 2021-10548 Filed 5-18-21; 8:45 am]
BILLING CODE 7590-01-P