Combined Notice of Filings #1, 27079-27080 [2021-10547]
Download as PDF
Federal Register / Vol. 86, No. 95 / Wednesday, May 19, 2021 / Notices
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)—
July 2021
Request Additional Information—July
2021
Issue Acceptance Letter—October 2021
Issue Scoping Document 1—October
2021
Comments on Scoping Document 1
due—November 2021
Issue Scoping Document 2 (if
necessary)—January 2022
Issue Notice of Ready for Environmental
Analysis—February 2022
Commission issues EA—July 2022
Comments on EA—August 2022
q. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: May 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–10541 Filed 5–18–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL21–72–000]
khammond on DSKJM1Z7X2PROD with NOTICES
LS Power Development, LLC, Doswell
Limited Partnership v. PJM
Interconnection, L.L.C.; Notice of
Complaint
Take notice that on May 7, 2021,
pursuant to sections 206, and 306 of the
Federal Power Act, 16 U.S.C. 824e, 825e
and Rule 206 of the Federal Energy
Regulatory Commission’s (Commission)
Rules of Practice and Procedure, 18 CFR
385.206, LS Power Development, LLC
and Doswell Limited Partnership
(Complainants) filed a formal complaint
against PJM Interconnection, L.L.C.,
(Respondent or PJM) alleging that the
Respondent violated the Reliability
Assurance Agreement among Load
Serving Entities in the PJM Region by
approving FRR Alternative elections by
entities whose FRR Capacity Plans did
not demonstrate the commitment of
capacity resources to meet their capacity
obligations for the full term of the
elections, all as more fully explained in
the complaint.
The Complainant certifies that copies
of the complaint were served on the
VerDate Sep<11>2014
16:43 May 18, 2021
Jkt 253001
contacts listed for Respondent in the
Commission’s list of Corporate Officials,
and on the Independent Market Monitor
for PJM.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically may mail similar
pleadings to the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. Hand
delivered submissions in docketed
proceedings should be delivered to
Health and Human Services, 12225
Wilkins Avenue, Rockville, Maryland
20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov, or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 27, 2021.
Dated: May 13, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–10538 Filed 5–18–21; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
27079
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG21–142–000.
Applicants: Bluestone Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Bluestone Wind,
LLC.
Filed Date: 5/12/21.
Accession Number: 20210512–5222.
Comments Due: 5 p.m. ET 6/2/21.
Docket Numbers: EG21–143–000.
Applicants: Ball Hill Wind Energy,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Ball Hill Wind
Energy, LLC.
Filed Date: 5/12/21.
Accession Number: 20210512–5223.
Comments Due: 5 p.m. ET 6/2/21.
Docket Numbers: EG21–144–000.
Applicants: White Mesa Wind, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of White Mesa Wind,
LLC.
Filed Date: 5/10/21.
Accession Number: 20210510–5231.
Comments Due: 5 p.m. ET 6/1/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2641–038;
ER10–1852–051.
Applicants: Florida Power & Light
Company, Oleander Power Project,
Limited Partnership.
Description: Notice of Change in
Status of Florida Power & Light
Company, et al.
Filed Date: 5/3/21.
Accession Number: 20210503–5115.
Comments Due: 5 p.m. ET 5/24/21.
Docket Numbers: ER19–2858–005.
Applicants: East Coast Power Linden
Holding, L.L.C.
Description: Compliance filing:
Informational Filing Under PJM Tariff
Schedule 2 and Request for Partial
Waiver to be effective N/A.
Filed Date: 1/29/21.
Accession Number: 20210129–5271.
Comments Due: 5 p.m. ET 5/24/21.
Docket Numbers: ER21–894–001.
Applicants: Louisville Gas and
Electric Company.
Description: Compliance filing:
Compliance Filing Transition
Mechanism Agreement KMPA to be
effective 3/17/2021.
E:\FR\FM\19MYN1.SGM
19MYN1
khammond on DSKJM1Z7X2PROD with NOTICES
27080
Federal Register / Vol. 86, No. 95 / Wednesday, May 19, 2021 / Notices
Filed Date: 5/13/21.
Accession Number: 20210513–5021.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21–895–001.
Applicants: Louisville Gas and
Electric Company.
Description: Compliance filing:
Compliance Filing Transition
Mechanism Agreement KYMEA to be
effective 3/17/2021.
Filed Date: 5/13/21.
Accession Number: 20210513–5022.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21–896–001.
Applicants: Louisville Gas and
Electric Company.
Description: Compliance filing:
Compliance Filing Transition
Mechanism Agreement OMU to be
effective 3/17/2021.
Filed Date: 5/13/21.
Accession Number: 20210513–5023.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21–1176–000;
ER21–1177–000.
Applicants: Delta’s Edge Solar, LLC,
Crosset Solar Energy, LLC.
Description: Response to April 19,
2021 Deficiency Letter of Delta’s Edge
Solar, LLC et al.
Filed Date: 5/12/21.
Accession Number: 20210512–5210.
Comments Due: 5 p.m. ET 6/2/21.
Docket Numbers: ER21–1879–001.
Applicants: Farmington Solar, LLC.
Description: Tariff Amendment:
Farmington Solar, LLC Amendment to
the Application for MBR Authority to be
effective 7/11/2021.
Filed Date: 5/13/21.
Accession Number: 20210513–5131.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21–1881–001.
Applicants: Grand Tower Energy
Center, LLC.
Description: Tariff Amendment:
Notice of Cancellation of Reactive Tariff
and Request for Waiver to be effective
7/1/2021.
Filed Date: 5/11/21.
Accession Number: 20210511–5121.
Comments Due: 5 p.m. ET 6/1/21.
Docket Numbers: ER21–1898–000.
Applicants: Commonwealth Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ComEd submits Interconnection
Agreement, SA No. 5955 with NIPSCO
to be effective 4/2/2021.
Filed Date: 5/12/21.
Accession Number: 20210512–5206.
Comments Due: 5 p.m. ET 6/2/21.
Docket Numbers: ER21–1899–000.
Applicants: Tri-State Generation and
Transmission Association, Inc.
Description: § 205(d) Rate Filing:
Amendment to Service Agreement No.
804 to be effective 5/11/2021.
VerDate Sep<11>2014
16:43 May 18, 2021
Jkt 253001
Filed Date: 5/13/21.
Accession Number: 20210513–5071.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21–1900–000.
Applicants: New York Independent
System Operator, Inc., Niagara Mohawk
Power Corporation.
Description: § 205(d) Rate Filing: Joint
205 TIPIA: NYISO, National Grid,
NYPA for Segment A, SA 2611, CEII to
be effective 4/29/2021.
Filed Date: 5/13/21.
Accession Number: 20210513–5073.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21–1901–000.
Applicants: Southwestern Public
Service Company.
Description: Request for Limited
Waiver of Tariff Provision, et al. of
Southwestern Public Service Company.
Filed Date: 5/13/21.
Accession Number: 20210513–5081.
Comments Due: 5 p.m. ET 5/20/21.
Docket Numbers: ER21–1902–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Notice of Cancellation Letter Agreement
IP Oberon, LLC SA No. 248 to be
effective 5/14/2021.
Filed Date: 5/13/21.
Accession Number: 20210513–5082.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21–1903–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–05–13_Attachment FF removal of
RPCE language to be effective 7/13/
2021.
Filed Date: 5/13/21.
Accession Number: 20210513–5095.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21–1904–000.
Applicants: Southwestern Electric
Power Company.
Description: § 205(d) Rate Filing:
SWEPCO-Bentonville (POD#6 Sunshine
and Sub E) Delivery Point Agreements
to be effective 5/5/2021.
Filed Date: 5/13/21.
Accession Number: 20210513–5127.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21–1905–000.
Applicants: NextEra Energy
Transmission MidAtlantic Indiana, Inc.,
PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
NEET MidAtlantic IN submits
Interconnection Agreement, SA No.
5801 with NIPSCO to be effective 10/29/
2020.
Filed Date: 5/13/21.
Accession Number: 20210513–5146.
Comments Due: 5 p.m. ET 6/3/21.
The filings are accessible in the
Commission’s eLibrary system (https://
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
elibrary.ferc.gov/idmws/search/fercgen
search.asp) by querying the docket
number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 13, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–10547 Filed 5–18–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No.10934–000]
Sugar River Hydro II, LLC; Notice of
Authorization for Continued Project
Operation
The current license for the Sugar
River II Project (project) is held by Sugar
River Hydro II, LLC (Sugar River Hydro)
under Project No. 10934. The project is
located on the Sugar River, in Sullivan
County, New Hampshire. On April 30,
2019, Sugar River Hydro filed a letter
stating that it is not filing an application
to relicense the project. On May 8, 2019,
the Commission, pursuant to 18 CFR
16.25(a), issued a notice soliciting
potential new applicants for the project,
which provided until August 6, 2019 for
potential applicants to submit a preapplication document (PAD) and notice
of intent (NOI). In response to the
solicitation notice, New Hampshire
Renewable Resources, LLC (New
Hampshire Renewable) filed a PAD and
NOI to relicense the Sugar River II
Project, pursuant to 18 CFR 5.5 and 5.6
of the Commission’s regulations.
Commission staff assigned Project No.
15003 for the licensing proceeding
initiated by New Hampshire
Renewable’s filing. On February 8, 2021,
New Hampshire Renewable filed an
application for a subsequent license for
the Sugar River II Project pursuant to
E:\FR\FM\19MYN1.SGM
19MYN1
Agencies
[Federal Register Volume 86, Number 95 (Wednesday, May 19, 2021)]
[Notices]
[Pages 27079-27080]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-10547]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG21-142-000.
Applicants: Bluestone Wind, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Bluestone Wind, LLC.
Filed Date: 5/12/21.
Accession Number: 20210512-5222.
Comments Due: 5 p.m. ET 6/2/21.
Docket Numbers: EG21-143-000.
Applicants: Ball Hill Wind Energy, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Ball Hill Wind Energy, LLC.
Filed Date: 5/12/21.
Accession Number: 20210512-5223.
Comments Due: 5 p.m. ET 6/2/21.
Docket Numbers: EG21-144-000.
Applicants: White Mesa Wind, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of White Mesa Wind, LLC.
Filed Date: 5/10/21.
Accession Number: 20210510-5231.
Comments Due: 5 p.m. ET 6/1/21.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2641-038; ER10-1852-051.
Applicants: Florida Power & Light Company, Oleander Power Project,
Limited Partnership.
Description: Notice of Change in Status of Florida Power & Light
Company, et al.
Filed Date: 5/3/21.
Accession Number: 20210503-5115.
Comments Due: 5 p.m. ET 5/24/21.
Docket Numbers: ER19-2858-005.
Applicants: East Coast Power Linden Holding, L.L.C.
Description: Compliance filing: Informational Filing Under PJM
Tariff Schedule 2 and Request for Partial Waiver to be effective N/A.
Filed Date: 1/29/21.
Accession Number: 20210129-5271.
Comments Due: 5 p.m. ET 5/24/21.
Docket Numbers: ER21-894-001.
Applicants: Louisville Gas and Electric Company.
Description: Compliance filing: Compliance Filing Transition
Mechanism Agreement KMPA to be effective 3/17/2021.
[[Page 27080]]
Filed Date: 5/13/21.
Accession Number: 20210513-5021.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21-895-001.
Applicants: Louisville Gas and Electric Company.
Description: Compliance filing: Compliance Filing Transition
Mechanism Agreement KYMEA to be effective 3/17/2021.
Filed Date: 5/13/21.
Accession Number: 20210513-5022.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21-896-001.
Applicants: Louisville Gas and Electric Company.
Description: Compliance filing: Compliance Filing Transition
Mechanism Agreement OMU to be effective 3/17/2021.
Filed Date: 5/13/21.
Accession Number: 20210513-5023.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21-1176-000; ER21-1177-000.
Applicants: Delta's Edge Solar, LLC, Crosset Solar Energy, LLC.
Description: Response to April 19, 2021 Deficiency Letter of
Delta's Edge Solar, LLC et al.
Filed Date: 5/12/21.
Accession Number: 20210512-5210.
Comments Due: 5 p.m. ET 6/2/21.
Docket Numbers: ER21-1879-001.
Applicants: Farmington Solar, LLC.
Description: Tariff Amendment: Farmington Solar, LLC Amendment to
the Application for MBR Authority to be effective 7/11/2021.
Filed Date: 5/13/21.
Accession Number: 20210513-5131.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21-1881-001.
Applicants: Grand Tower Energy Center, LLC.
Description: Tariff Amendment: Notice of Cancellation of Reactive
Tariff and Request for Waiver to be effective 7/1/2021.
Filed Date: 5/11/21.
Accession Number: 20210511-5121.
Comments Due: 5 p.m. ET 6/1/21.
Docket Numbers: ER21-1898-000.
Applicants: Commonwealth Edison Company, PJM Interconnection,
L.L.C.
Description: Sec. 205(d) Rate Filing: ComEd submits
Interconnection Agreement, SA No. 5955 with NIPSCO to be effective 4/2/
2021.
Filed Date: 5/12/21.
Accession Number: 20210512-5206.
Comments Due: 5 p.m. ET 6/2/21.
Docket Numbers: ER21-1899-000.
Applicants: Tri-State Generation and Transmission Association, Inc.
Description: Sec. 205(d) Rate Filing: Amendment to Service
Agreement No. 804 to be effective 5/11/2021.
Filed Date: 5/13/21.
Accession Number: 20210513-5071.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21-1900-000.
Applicants: New York Independent System Operator, Inc., Niagara
Mohawk Power Corporation.
Description: Sec. 205(d) Rate Filing: Joint 205 TIPIA: NYISO,
National Grid, NYPA for Segment A, SA 2611, CEII to be effective 4/29/
2021.
Filed Date: 5/13/21.
Accession Number: 20210513-5073.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21-1901-000.
Applicants: Southwestern Public Service Company.
Description: Request for Limited Waiver of Tariff Provision, et al.
of Southwestern Public Service Company.
Filed Date: 5/13/21.
Accession Number: 20210513-5081.
Comments Due: 5 p.m. ET 5/20/21.
Docket Numbers: ER21-1902-000.
Applicants: Southern California Edison Company.
Description: Tariff Cancellation: Notice of Cancellation Letter
Agreement IP Oberon, LLC SA No. 248 to be effective 5/14/2021.
Filed Date: 5/13/21.
Accession Number: 20210513-5082.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21-1903-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2021-05-13_Attachment FF
removal of RPCE language to be effective 7/13/2021.
Filed Date: 5/13/21.
Accession Number: 20210513-5095.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21-1904-000.
Applicants: Southwestern Electric Power Company.
Description: Sec. 205(d) Rate Filing: SWEPCO-Bentonville (POD#6
Sunshine and Sub E) Delivery Point Agreements to be effective 5/5/2021.
Filed Date: 5/13/21.
Accession Number: 20210513-5127.
Comments Due: 5 p.m. ET 6/3/21.
Docket Numbers: ER21-1905-000.
Applicants: NextEra Energy Transmission MidAtlantic Indiana, Inc.,
PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: NEET MidAtlantic IN submits
Interconnection Agreement, SA No. 5801 with NIPSCO to be effective 10/
29/2020.
Filed Date: 5/13/21.
Accession Number: 20210513-5146.
Comments Due: 5 p.m. ET 6/3/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 13, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021-10547 Filed 5-18-21; 8:45 am]
BILLING CODE 6717-01-P