City of Watervliet, New York; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions, 26716-26718 [2021-10329]
Download as PDF
26716
Federal Register / Vol. 86, No. 93 / Monday, May 17, 2021 / Notices
Applicants: Sundance Wind Project
Holdings LLC.
Description: Tariff Cancellation:
Notice of Cancellation of Market-Based
Rate Tariff to be effective 7/11/2021.
Filed Date: 5/11/21.
Accession Number: 20210511–5051.
Comments Due: 5 p.m. ET 6/1/21.
Docket Numbers: ER21–1879–000.
Applicants: Farmington Solar, LLC.
Description: Baseline eTariff Filing:
Farmington Solar, LLC Application for
MBR Authority to be effective 5/12/
2021.
Filed Date: 5/11/21.
Accession Number: 20210511–5054.
Comments Due: 5 p.m. ET 6/1/21.
Docket Numbers: ER21–1880–000.
Applicants: Niyol Wind, LLC.
Description: Baseline eTariff Filing:
Niyol Wind, LLC Application for MBR
Authority to be effective 7/11/2021.
Filed Date: 5/11/21.
Accession Number: 20210511–5059.
Comments Due: 5 p.m. ET 6/1/21.
Docket Numbers: ER21–1881–000.
Applicants: Grand Tower Energy
Center, LLC.
Description: Tariff Cancellation:
Notice of Cancellation of Reactive Tariff
to be effective 5/12/2021.
Filed Date: 5/11/21.
Accession Number: 20210511–5072.
Comments Due: 5 p.m. ET 6/1/21.
Docket Numbers: ER21–1882–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing:
DEC—Southern Power—NCEMC
Dynamic Power Agreement RS–570 to
be effective 7/11/2021.
Filed Date: 5/11/21.
Accession Number: 20210511–5078.
Comments Due: 5 p.m. ET 6/1/21.
Docket Numbers: ER21–1883–000.
Applicants: ISO New England Inc.
Description: § 205(d) Rate Filing:
True-Up of Section III.13.7 to Reflect
Only Commission-Accepted Language
to be effective 4/1/2021.
Filed Date: 5/11/21.
Accession Number: 20210511–5102.
Comments Due: 5 p.m. ET 6/1/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
VerDate Sep<11>2014
18:56 May 14, 2021
Jkt 253001
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 11, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–10321 Filed 5–14–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP12–609–000.
Applicants: Texas Gas Transmission,
LLC.
Description: Report Filing: 2020
Operational Purchases and Sales
Reports.
Filed Date: 4/30/21.
Accession Number: 20210430–5066.
Comments Due: 5 p.m. ET 5/12/21.
Docket Numbers: RP13–212–000.
Applicants: Boardwalk Storage
Company, LLC.
Description: Report Filing: 2020
Operational Purchases and Sales
Reports.
Filed Date: 4/30/21.
Accession Number: 20210430–5067.
Comments Due: 5 p.m. ET 5/12/21.
Docket Numbers: RP21–806–000.
Applicants: Cameron Interstate
Pipeline, LLC.
Description: Annual Operational
Transactions Report of Cameron
Interstate Pipeline, LLC under RP21–
806.
Filed Date: 4/30/21.
Accession Number: 20210430–5608.
Comments Due: 5 p.m. ET 5/12/21.
Docket Numbers: RP21–817–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Amendment to a Negotiated Rate
Agreement—Macquarie Energy LLC to
be effective 5/8/2021.
Filed Date: 5/7/21.
Accession Number: 20210507–5002.
Comments Due: 5 p.m. ET 5/19/21.
Docket Numbers: RP21–817–001.
Applicants: Natural Gas Pipeline
Company of America.
Description: Tariff Amendment:
Amendment to a Negotiated Rate
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
Filing—Macquarie Energy LLC to be
effective 5/8/2021.
Filed Date: 5/7/21.
Accession Number: 20210507–5190.
Comments Due: 5 p.m. ET 5/19/21.
Docket Numbers: RP21–818–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing: Update
to Remove Neg Rate PAL Agreement—
Exelon Generation Co to be effective 6/
10/2021.
Filed Date: 5/7/21.
Accession Number: 20210507–5032.
Comments Due: 5 p.m. ET 5/19/21.
Docket Numbers: RP21–819–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: Update
to Remove Negotiated Rate PAL
Agreements—February 2021 to be
effective 6/10/2021.
Filed Date: 5/7/21.
Accession Number: 20210507–5040.
Comments Due: 5 p.m. ET 5/19/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 11, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–10320 Filed 5–14–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2955–011]
City of Watervliet, New York; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
E:\FR\FM\17MYN1.SGM
17MYN1
Federal Register / Vol. 86, No. 93 / Monday, May 17, 2021 / Notices
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: P–2955–011.
c. Date Filed: February 28, 2020.
d. Applicant: City of Watervliet, New
York.
e. Name of Project: Normanskill
Hydroelectric Project.
f. Location: The project is located on
the Normans Kill in Guilderland,
Albany County, New York. The project
does not occupy any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Michele E.
Stottler, Gomez and Sullivan Engineers,
DPC, 399 Albany Shaker Road, Suite
203, Loudonville, NY 12211; (518) 407–
0050; email—mstottler@
gomezandsullivan.com or Joseph
LaCivita, General Manager, The City of
Watervliet, 2 Fifteenth Street,
Watervliet, NY 12189; (518) 270–3800;
email—jlacivita@watervliet.com.
i. FERC Contact: Woohee Choi at
(202) 502–6336; or woohee.choi@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–2955–011.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
The Council on Environmental
Quality (CEQ) issued a final rule on July
15, 2020, revising the regulations under
40 CFR parts 1500–1518 that federal
agencies use to implement NEPA (see
Update to the Regulations Implementing
the Procedural Provisions of the
National Environmental Policy Act, 85
FR 43,304). The Final Rule became
effective on and applies to any NEPA
process begun after September 14, 2020.
An agency may also apply the
regulations to ongoing activities and
environmental documents begun before
September 14, 2020, which includes the
proposed Normanskill Hydroelectric
Project. Commission staff intends to
conduct its NEPA review in accordance
with CEQ’s new regulations.
l. The Normanskill Project consists of:
(1) A 380-foot-long reinforced concrete
Ambursen-type dam with a 306-footlong overflow section having a crest
elevation of 259 feet National Geodetic
Vertical Datum of 1929 (NGVD29)
surmounted by 3-foot-high flashboards;
(2) a 380-acre reservoir with a gross
volume of 3,600 acre-feet at the normal
maximum pool elevation of 262 feet
NGVD29; (3) an intake structure and
sluiceway; (4) a 700-foot-long, 6-footdiameter, concrete-encased steel, buried
penstock; (5) a reinforced concrete
underground powerhouse containing a
single 1,250-kilowatt tube-type
generating unit; (6) a 600-foot-long, 2.4kilovolt (kV) transmission line; (7) a 2.4/
13.2-kV transformer bank; and (8)
appurtenant facilities.
The Normanskill Project is operated
in a run-of-river mode with an average
annual generation of 2,863 megawatthours between 2010 and 2019.
m. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification. Please note that the
certification request must comply with
40 CFR 121.5(b), including
documentation that a pre-filing meeting
request was submitted to the certifying
authority at least 30 days prior to
submitting the certification request.
Please also note that the certification
request must be sent to the certifying
authority and to the Commission
concurrently.
o. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Deadline for Filing Comments, Recommendations, and Agency Terms and Conditions/Prescriptions ....................................
Deadline for Filing Reply Comments ..........................................................................................................................................
VerDate Sep<11>2014
18:56 May 14, 2021
Jkt 253001
PO 00000
Frm 00029
Fmt 4703
26717
Sfmt 4703
E:\FR\FM\17MYN1.SGM
17MYN1
July 2021.
August 2021.
26718
Federal Register / Vol. 86, No. 93 / Monday, May 17, 2021 / Notices
Dated: May 11, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–10329 Filed 5–14–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3511–024]
Lower Saranac Hydro, LLC; Notice of
Application Ready for Environmental
Analysis and Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: P–3511–024.
c. Date filed: May 29, 2020.
d. Applicant: Lower Saranac Hydro,
LLC.
e. Name of Project: Groveville
Hydroelectric Project.
f. Location: On Fishkill Creek, in the
City of Beacon, Dutchess County, New
York. The project does not occupy any
federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Tim Carlsen,
CEO, Hydroland, Inc.,1 403 Madison
Ave. #240, Bainbridge Island, WA
98110; Phone at (844) 493–7612 or
email at tim@hydrolandcorp.com.
i. FERC Contact: Jeremy Feinberg at
(202) 502–6893 or jeremy.feinberg@
ferc.gov.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file comments,
recommendations, terms and
conditions, and prescriptions using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
1 In a February 9, 2021 filing, the Commission
was notified that Enel Green Power North America,
Inc. transferred all its ownership interests for Lower
Saranac Hydro, LLC to Hydroland, Inc.
VerDate Sep<11>2014
18:56 May 14, 2021
Jkt 253001
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–3511–024.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
and is now ready for environmental
analysis.
The Council on Environmental
Quality (CEQ) issued a final rule on July
15, 2020, revising the regulations under
40 CFR parts 1500–1518 that federal
agencies use to implement NEPA (see
Update to the Regulations Implementing
the Procedural Provisions of the
National Environmental Policy Act, 85
FR 43304). The Final Rule became
effective on and applies to any NEPA
process begun after September 14, 2020.
An agency may also apply the
regulations to ongoing activities and
environmental documents begun before
September 14, 2020, which includes the
proposed Groveville Project.
Commission staff intends to conduct its
NEPA review in accordance with CEQ’s
new regulations.
l. The Groveville Hydroelectric
Project consists of: (1) A 167-foot-long,
37-foot-high concrete gravity dam, with
a 140-foot-long spillway having a crest
elevation of 172.4 feet National Geodetic
Vertical Datum of 1929 (NGVD29) and
topped with 3-foot-high wooden
flashboards; (2) an impoundment with a
gross storage capacity of approximately
43 acre-feet and a surface area of 5 acres
at a normal pool elevation of 175.4 feet
NGVD29; (3) an intake structure with
two gates and a 27-foot-high, 34-footwide trash rack; (4) a 9-foot-diameter,
approximately 140-foot-long riveted
steel underground penstock; (5) a
powerhouse containing three fixedoutput turbine-generator units with a
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
total rated capacity of 927 kilowatts; (6)
a 4-foot-high submerged stilling basin
weir approximately 60 feet downstream
of the dam spillway; (7) a 20-foot-wide,
90-foot-long tailrace; (8) a 20-foot-long
underground generator lead connecting
to a step-up transformer that connects to
a 13.2-kilovolt, 40-foot-long
underground transmission line that then
connects to a 15-foot-long aerial
transmission line before connecting to
the regional grid; and (9) appurtenant
facilities.
Lower Saranac Hydro proposes to
continue operating the project in a runof-river mode, with no changes to the
existing operation or facilities.
m. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS,’’ ‘‘REPLY
COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. A license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification. Please note that the
certification request must comply with
40 CFR 121.5(b), including
E:\FR\FM\17MYN1.SGM
17MYN1
Agencies
[Federal Register Volume 86, Number 93 (Monday, May 17, 2021)]
[Notices]
[Pages 26716-26718]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-10329]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2955-011]
City of Watervliet, New York; Notice of Application Ready for
Environmental Analysis and Soliciting Comments, Recommendations, Terms
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed
[[Page 26717]]
with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: P-2955-011.
c. Date Filed: February 28, 2020.
d. Applicant: City of Watervliet, New York.
e. Name of Project: Normanskill Hydroelectric Project.
f. Location: The project is located on the Normans Kill in
Guilderland, Albany County, New York. The project does not occupy any
federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Michele E. Stottler, Gomez and Sullivan
Engineers, DPC, 399 Albany Shaker Road, Suite 203, Loudonville, NY
12211; (518) 407-0050; [email protected] or Joseph
LaCivita, General Manager, The City of Watervliet, 2 Fifteenth Street,
Watervliet, NY 12189; (518) 270-3800; [email protected]
i. FERC Contact: Woohee Choi at (202) 502-6336; or
[email protected].
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments, recommendations, terms and conditions, and prescriptions
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://ferconline.ferc.gov/QuickComment.aspx. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426. Submissions sent via any other
carrier must be addressed to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing should include docket number P-
2955-011.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted and is now ready for
environmental analysis.
The Council on Environmental Quality (CEQ) issued a final rule on
July 15, 2020, revising the regulations under 40 CFR parts 1500-1518
that federal agencies use to implement NEPA (see Update to the
Regulations Implementing the Procedural Provisions of the National
Environmental Policy Act, 85 FR 43,304). The Final Rule became
effective on and applies to any NEPA process begun after September 14,
2020. An agency may also apply the regulations to ongoing activities
and environmental documents begun before September 14, 2020, which
includes the proposed Normanskill Hydroelectric Project. Commission
staff intends to conduct its NEPA review in accordance with CEQ's new
regulations.
l. The Normanskill Project consists of: (1) A 380-foot-long
reinforced concrete Ambursen-type dam with a 306-foot-long overflow
section having a crest elevation of 259 feet National Geodetic Vertical
Datum of 1929 (NGVD29) surmounted by 3-foot-high flashboards; (2) a
380-acre reservoir with a gross volume of 3,600 acre-feet at the normal
maximum pool elevation of 262 feet NGVD29; (3) an intake structure and
sluiceway; (4) a 700-foot-long, 6-foot-diameter, concrete-encased
steel, buried penstock; (5) a reinforced concrete underground
powerhouse containing a single 1,250-kilowatt tube-type generating
unit; (6) a 600-foot-long, 2.4-kilovolt (kV) transmission line; (7) a
2.4/13.2-kV transformer bank; and (8) appurtenant facilities.
The Normanskill Project is operated in a run-of-river mode with an
average annual generation of 2,863 megawatt-hours between 2010 and
2019.
m. A copy of the application can be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support.
All filings must (1) bear in all capital letters the title
``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND
CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person submitting the filing; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. Each filing must be
accompanied by proof of service on all persons listed on the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. A license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification. Please note
that the certification request must comply with 40 CFR 121.5(b),
including documentation that a pre-filing meeting request was submitted
to the certifying authority at least 30 days prior to submitting the
certification request. Please also note that the certification request
must be sent to the certifying authority and to the Commission
concurrently.
o. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Deadline for Filing Comments, July 2021.
Recommendations, and Agency Terms and
Conditions/Prescriptions.
Deadline for Filing Reply Comments.... August 2021.
------------------------------------------------------------------------
[[Page 26718]]
Dated: May 11, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-10329 Filed 5-14-21; 8:45 am]
BILLING CODE 6717-01-P