Northern States Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 26513-26514 [2021-10226]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 86, No. 92 / Friday, May 14, 2021 / Notices
operator expects the year-round
operation of the sand mine will extract
5,000 to 25,000 tons of sediment per
year. The operation will not be
conducted on U.S. Forest Service Land.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
VerDate Sep<11>2014
19:58 May 13, 2021
Jkt 253001
Dated: May 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–10228 Filed 5–13–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[P–2444–037]
Northern States Power Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Request for a
temporary amendment of reservoir
elevation requirement.
b. Project No.: 2444–037.
c. Date Filed: April 7, 2021.
d. Applicant: Northern States Power
Company.
e. Name of Project: White River
Hydroelectric Project.
f. Location: The project is located on
the White River in Ashland County,
Wisconsin.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Mr. Matthew
Miller, 1414 West Hamilton Avenue,
P.O. Box 8, Eau Claire, WI 54702, (715)
737–1353.
i. FERC Contact: Mr. Steven Sachs,
(202) 502–8666, Steven.Sachs@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 30
days from the issuance of this notice by
the Commission. The Commission
strongly encourages electronic filing.
Please file comments, motions to
intervene, and protests using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/doc-sfiling/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
26513
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. The first page of
any filing should include docket
number P–2444–037.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Request: The
applicant requests a temporary
amendment of its minimum reservoir
elevation requirement to allow for
bridge and gate repairs. The applicant
states it would initially draw down the
reservoir by approximately 5 feet below
the normal pond elevation to allow for
repair of the bridge that crosses the
spillway. The applicant expects this
work to be completed approximately 10
weeks after commencement of the
drawdown. Following completion of the
bridge work, the applicant intends to
lower the reservoir another 3 feet, or 8
feet below the normal elevation, to
allow for work on its spillway gates
which would require an additional 2
weeks before beginning to refill the
reservoir. The applicant expects to
return the reservoir to its normal
elevation approximately 14 weeks after
the beginning of the drawdown, but
requests the temporary amendment be
effective from June 1 through October
31, 2021 to allow for weather and
construction contingencies.
l. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
E:\FR\FM\14MYN1.SGM
14MYN1
26514
Federal Register / Vol. 86, No. 92 / Friday, May 14, 2021 / Notices
so indicate by writing to the Secretary
of the Commission.
n. Comments, Motions to Intervene, or
Protests: Anyone may submit
comments, a motion to intervene, or a
protest in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
motions to intervene, or protests must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘MOTION TO
INTERVENE’’, or ‘‘PROTEST’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number(s) of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person intervening or
protesting; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis. A copy of all other filings in
reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: May 10, 2021.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
khammond on DSKJM1Z7X2PROD with NOTICES
[FR Doc. 2021–10212 Filed 5–13–21; 8:45 am]
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP21–815–000.
Applicants: Natural Gas Pipeline
Company of America.
Description: § 4(d) Rate Filing:
Amendment to a Negotiated Rate
Agreement Filing—ConnocoPhillips
Company to be effective 5/6/2021.
Filed Date: 5/6/21.
Accession Number: 20210506–5047.
Comments Due: 5 p.m. ET 5/18/21.
Jkt 253001
ENVIRONMENTAL PROTECTION
AGENCY
Frm 00058
Fmt 4703
Amended Notice
EIS No. 20210041, Draft Supplement,
CHSRA, CA, California High-Speed
Rail San Jose to Merced Project
Section Revised Draft Environmental
Impact Report/Supplemental Draft
Environmental Impact Statement,
Comment Period Ends: 06/09/2021,
Contact: Scott Rothenberg 916–403–
6936. Revision to FR Notice Published
4/23/2021; Correction to Comment
Period Due Date from June 7, 2021 to
June 9, 2021.
Dated: May 10, 2021.
Cindy S. Barger,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2021–10225 Filed 5–13–21; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
2021 Annual Joint Meeting of the
Ozone Transport Commission and the
Mid-Atlantic Northeast Visibility Union
Environmental Protection
Agency (EPA).
ACTION: Notice; meeting.
AGENCY:
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa.
Weekly receipt of Environmental Impact
Statements (EIS)
Filed May 3, 2021 10 a.m. EST Through
May 10, 2021 10 a.m. EST
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air
Act requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20210050, Draft, NOAA, FL,
Draft Amendment 53 to the Fishery
Management Plan for the Reef Fish
Fishery in the Gulf of Mexico,
Comment Period Ends: 06/28/2021,
Contact: Peter Hood 727–551–5728.
PO 00000
EIS No. 20210051, Draft, USN, CA,
Navy Old Town Campus
Revitalization, Comment Period Ends:
07/13/2021, Contact: Ron Bochenek
619–705–5560.
EIS No. 20210052, Draft, NMFS, PRO,
Programmatic Environmental Impact
Statement for the Marine Mammal
Health and Stranding Response
Program, Comment Period Ends: 06/
28/2021, Contact: Stephen Manley
301–427–8476.
[FRL–10024–02–Region 1]
BILLING CODE 6717–01–P
Environmental Impact Statements;
Notice of Availability
BILLING CODE 6717–01–P
19:58 May 13, 2021
Dated: May 10, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[ER–FRL–9056–5]
[FR Doc. 2021–10226 Filed 5–13–21; 8:45 am]
VerDate Sep<11>2014
Docket Numbers: RP21–816–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing:
Permanant Capacity Release—
Negotiated Rate Agreements—5/7/2021
to be effective 5/7/2021.
Filed Date: 5/6/21.
Accession Number: 20210506–5070.
Comments Due: 5 p.m. ET 5/18/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Sfmt 4703
The United States
Environmental Protection Agency (EPA)
is announcing the 2021 Annual Joint
Meeting of the Ozone Transport
Commission (OTC) and the MidAtlantic Northeast Visibility Union
(MANE–VU). The meeting agenda will
include topics regarding reducing
ground-level ozone precursors and
matters relative to Regional Haze and
visibility improvement in Federal Class
I areas in a multi-pollutant context.
DATES: The meeting will be held on June
15, 2021 starting at 2:30 p.m. and
ending at 4:00 p.m.
ADDRESSES: Virtual meeting. Further
information on the details for the virtual
public meeting will be available at
https://otcair.org.
FOR FURTHER INFORMATION CONTACT:
For documents and press inquiries
contact: Ozone Transport Commission,
SUMMARY:
E:\FR\FM\14MYN1.SGM
14MYN1
Agencies
[Federal Register Volume 86, Number 92 (Friday, May 14, 2021)]
[Notices]
[Pages 26513-26514]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-10226]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[P-2444-037]
Northern States Power Company; Notice of Application Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Request for a temporary amendment of
reservoir elevation requirement.
b. Project No.: 2444-037.
c. Date Filed: April 7, 2021.
d. Applicant: Northern States Power Company.
e. Name of Project: White River Hydroelectric Project.
f. Location: The project is located on the White River in Ashland
County, Wisconsin.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Mr. Matthew Miller, 1414 West Hamilton
Avenue, P.O. Box 8, Eau Claire, WI 54702, (715) 737-1353.
i. FERC Contact: Mr. Steven Sachs, (202) 502-8666,
[email protected].
j. Deadline for filing comments, motions to intervene, and protests
is 30 days from the issuance of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file comments,
motions to intervene, and protests using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. The first page of any filing should
include docket number P-2444-037.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Request: The applicant requests a temporary
amendment of its minimum reservoir elevation requirement to allow for
bridge and gate repairs. The applicant states it would initially draw
down the reservoir by approximately 5 feet below the normal pond
elevation to allow for repair of the bridge that crosses the spillway.
The applicant expects this work to be completed approximately 10 weeks
after commencement of the drawdown. Following completion of the bridge
work, the applicant intends to lower the reservoir another 3 feet, or 8
feet below the normal elevation, to allow for work on its spillway
gates which would require an additional 2 weeks before beginning to
refill the reservoir. The applicant expects to return the reservoir to
its normal elevation approximately 14 weeks after the beginning of the
drawdown, but requests the temporary amendment be effective from June 1
through October 31, 2021 to allow for weather and construction
contingencies.
l. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
internet through the Commission's Home Page (https://ferc.gov) using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. At this time,
the Commission has suspended access to the Commission's Public
Reference Room, due to the proclamation declaring a National Emergency
concerning the Novel Coronavirus Disease (COVID-19), issued by the
President on March 13, 2020. For assistance, contact FERC at
[email protected] or call toll-free, (886) 208-3676 or TTY,
(202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should
[[Page 26514]]
so indicate by writing to the Secretary of the Commission.
n. Comments, Motions to Intervene, or Protests: Anyone may submit
comments, a motion to intervene, or a protest in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, motions to
intervene, or protests must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``MOTION TO
INTERVENE'', or ``PROTEST'' as applicable; (2) set forth in the heading
the name of the applicant and the project number(s) of the application
to which the filing responds; (3) furnish the name, address, and
telephone number of the person intervening or protesting; and (4)
otherwise comply with the requirements of 18 CFR 385.2001 through
385.2005. All comments, motions to intervene, or protests must set
forth their evidentiary basis. A copy of all other filings in reference
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 385.2010.
Dated: May 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-10226 Filed 5-13-21; 8:45 am]
BILLING CODE 6717-01-P