Northern States Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 26513-26514 [2021-10226]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 86, No. 92 / Friday, May 14, 2021 / Notices operator expects the year-round operation of the sand mine will extract 5,000 to 25,000 tons of sediment per year. The operation will not be conducted on U.S. Forest Service Land. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. VerDate Sep<11>2014 19:58 May 13, 2021 Jkt 253001 Dated: May 10, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–10228 Filed 5–13–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P–2444–037] Northern States Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Request for a temporary amendment of reservoir elevation requirement. b. Project No.: 2444–037. c. Date Filed: April 7, 2021. d. Applicant: Northern States Power Company. e. Name of Project: White River Hydroelectric Project. f. Location: The project is located on the White River in Ashland County, Wisconsin. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Mr. Matthew Miller, 1414 West Hamilton Avenue, P.O. Box 8, Eau Claire, WI 54702, (715) 737–1353. i. FERC Contact: Mr. Steven Sachs, (202) 502–8666, Steven.Sachs@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier PO 00000 Frm 00057 Fmt 4703 Sfmt 4703 26513 must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. The first page of any filing should include docket number P–2444–037. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The applicant requests a temporary amendment of its minimum reservoir elevation requirement to allow for bridge and gate repairs. The applicant states it would initially draw down the reservoir by approximately 5 feet below the normal pond elevation to allow for repair of the bridge that crosses the spillway. The applicant expects this work to be completed approximately 10 weeks after commencement of the drawdown. Following completion of the bridge work, the applicant intends to lower the reservoir another 3 feet, or 8 feet below the normal elevation, to allow for work on its spillway gates which would require an additional 2 weeks before beginning to refill the reservoir. The applicant expects to return the reservoir to its normal elevation approximately 14 weeks after the beginning of the drawdown, but requests the temporary amendment be effective from June 1 through October 31, 2021 to allow for weather and construction contingencies. l. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TTY, (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should E:\FR\FM\14MYN1.SGM 14MYN1 26514 Federal Register / Vol. 86, No. 92 / Friday, May 14, 2021 / Notices so indicate by writing to the Secretary of the Commission. n. Comments, Motions to Intervene, or Protests: Anyone may submit comments, a motion to intervene, or a protest in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, motions to intervene, or protests must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘MOTION TO INTERVENE’’, or ‘‘PROTEST’’ as applicable; (2) set forth in the heading the name of the applicant and the project number(s) of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person intervening or protesting; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: May 10, 2021. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings khammond on DSKJM1Z7X2PROD with NOTICES [FR Doc. 2021–10212 Filed 5–13–21; 8:45 am] Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP21–815–000. Applicants: Natural Gas Pipeline Company of America. Description: § 4(d) Rate Filing: Amendment to a Negotiated Rate Agreement Filing—ConnocoPhillips Company to be effective 5/6/2021. Filed Date: 5/6/21. Accession Number: 20210506–5047. Comments Due: 5 p.m. ET 5/18/21. Jkt 253001 ENVIRONMENTAL PROTECTION AGENCY Frm 00058 Fmt 4703 Amended Notice EIS No. 20210041, Draft Supplement, CHSRA, CA, California High-Speed Rail San Jose to Merced Project Section Revised Draft Environmental Impact Report/Supplemental Draft Environmental Impact Statement, Comment Period Ends: 06/09/2021, Contact: Scott Rothenberg 916–403– 6936. Revision to FR Notice Published 4/23/2021; Correction to Comment Period Due Date from June 7, 2021 to June 9, 2021. Dated: May 10, 2021. Cindy S. Barger, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2021–10225 Filed 5–13–21; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY 2021 Annual Joint Meeting of the Ozone Transport Commission and the Mid-Atlantic Northeast Visibility Union Environmental Protection Agency (EPA). ACTION: Notice; meeting. AGENCY: Responsible Agency: Office of Federal Activities, General Information 202– 564–5632 or https://www.epa.gov/nepa. Weekly receipt of Environmental Impact Statements (EIS) Filed May 3, 2021 10 a.m. EST Through May 10, 2021 10 a.m. EST Pursuant to 40 CFR 1506.9. Notice: Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// cdxnodengn.epa.gov/cdx-enepa-public/ action/eis/search. EIS No. 20210050, Draft, NOAA, FL, Draft Amendment 53 to the Fishery Management Plan for the Reef Fish Fishery in the Gulf of Mexico, Comment Period Ends: 06/28/2021, Contact: Peter Hood 727–551–5728. PO 00000 EIS No. 20210051, Draft, USN, CA, Navy Old Town Campus Revitalization, Comment Period Ends: 07/13/2021, Contact: Ron Bochenek 619–705–5560. EIS No. 20210052, Draft, NMFS, PRO, Programmatic Environmental Impact Statement for the Marine Mammal Health and Stranding Response Program, Comment Period Ends: 06/ 28/2021, Contact: Stephen Manley 301–427–8476. [FRL–10024–02–Region 1] BILLING CODE 6717–01–P Environmental Impact Statements; Notice of Availability BILLING CODE 6717–01–P 19:58 May 13, 2021 Dated: May 10, 2021. Debbie-Anne A. Reese, Deputy Secretary. [ER–FRL–9056–5] [FR Doc. 2021–10226 Filed 5–13–21; 8:45 am] VerDate Sep<11>2014 Docket Numbers: RP21–816–000. Applicants: Equitrans, L.P. Description: § 4(d) Rate Filing: Permanant Capacity Release— Negotiated Rate Agreements—5/7/2021 to be effective 5/7/2021. Filed Date: 5/6/21. Accession Number: 20210506–5070. Comments Due: 5 p.m. ET 5/18/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Sfmt 4703 The United States Environmental Protection Agency (EPA) is announcing the 2021 Annual Joint Meeting of the Ozone Transport Commission (OTC) and the MidAtlantic Northeast Visibility Union (MANE–VU). The meeting agenda will include topics regarding reducing ground-level ozone precursors and matters relative to Regional Haze and visibility improvement in Federal Class I areas in a multi-pollutant context. DATES: The meeting will be held on June 15, 2021 starting at 2:30 p.m. and ending at 4:00 p.m. ADDRESSES: Virtual meeting. Further information on the details for the virtual public meeting will be available at https://otcair.org. FOR FURTHER INFORMATION CONTACT: For documents and press inquiries contact: Ozone Transport Commission, SUMMARY: E:\FR\FM\14MYN1.SGM 14MYN1

Agencies

[Federal Register Volume 86, Number 92 (Friday, May 14, 2021)]
[Notices]
[Pages 26513-26514]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-10226]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[P-2444-037]


Northern States Power Company; Notice of Application Accepted for 
Filing and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Request for a temporary amendment of 
reservoir elevation requirement.
    b. Project No.: 2444-037.
    c. Date Filed: April 7, 2021.
    d. Applicant: Northern States Power Company.
    e. Name of Project: White River Hydroelectric Project.
    f. Location: The project is located on the White River in Ashland 
County, Wisconsin.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Mr. Matthew Miller, 1414 West Hamilton 
Avenue, P.O. Box 8, Eau Claire, WI 54702, (715) 737-1353.
    i. FERC Contact: Mr. Steven Sachs, (202) 502-8666, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance of this notice by the Commission. The 
Commission strongly encourages electronic filing. Please file comments, 
motions to intervene, and protests using the Commission's eFiling 
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/doc-sfiling/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, MD 20852. The first page of any filing should 
include docket number P-2444-037.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. Description of Request: The applicant requests a temporary 
amendment of its minimum reservoir elevation requirement to allow for 
bridge and gate repairs. The applicant states it would initially draw 
down the reservoir by approximately 5 feet below the normal pond 
elevation to allow for repair of the bridge that crosses the spillway. 
The applicant expects this work to be completed approximately 10 weeks 
after commencement of the drawdown. Following completion of the bridge 
work, the applicant intends to lower the reservoir another 3 feet, or 8 
feet below the normal elevation, to allow for work on its spillway 
gates which would require an additional 2 weeks before beginning to 
refill the reservoir. The applicant expects to return the reservoir to 
its normal elevation approximately 14 weeks after the beginning of the 
drawdown, but requests the temporary amendment be effective from June 1 
through October 31, 2021 to allow for weather and construction 
contingencies.
    l. In addition to publishing the full text of this document in the 
Federal Register, the Commission provides all interested persons an 
opportunity to view and/or print the contents of this document via the 
internet through the Commission's Home Page (https://ferc.gov) using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. At this time, 
the Commission has suspended access to the Commission's Public 
Reference Room, due to the proclamation declaring a National Emergency 
concerning the Novel Coronavirus Disease (COVID-19), issued by the 
President on March 13, 2020. For assistance, contact FERC at 
[email protected] or call toll-free, (886) 208-3676 or TTY, 
(202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should

[[Page 26514]]

so indicate by writing to the Secretary of the Commission.
    n. Comments, Motions to Intervene, or Protests: Anyone may submit 
comments, a motion to intervene, or a protest in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, motions to 
intervene, or protests must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``MOTION TO 
INTERVENE'', or ``PROTEST'' as applicable; (2) set forth in the heading 
the name of the applicant and the project number(s) of the application 
to which the filing responds; (3) furnish the name, address, and 
telephone number of the person intervening or protesting; and (4) 
otherwise comply with the requirements of 18 CFR 385.2001 through 
385.2005. All comments, motions to intervene, or protests must set 
forth their evidentiary basis. A copy of all other filings in reference 
to this application must be accompanied by proof of service on all 
persons listed in the service list prepared by the Commission in this 
proceeding, in accordance with 18 CFR 385.2010.

    Dated: May 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-10226 Filed 5-13-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.