Combined Notice of Filings #2, 25854-25855 [2021-09934]
Download as PDF
25854
Federal Register / Vol. 86, No. 89 / Tuesday, May 11, 2021 / Notices
FERC–576—REPORT OF SERVICE INTERRUPTIONS OR DAMAGE TO FACILITIES
Number of
respondents 6
Annual
number of
responses per
respondent
Total number
of responses
Average burden
hours and cost ($)
per response
Total annual burden
hours and total
annual cost
Cost per
respondent 7
($)
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
(5) ÷ (1)
Notification of Incident—Service Interruption.
Notification of Incident—Damage ..........
Submittal of DOT Incident Report ..........
50
1
50
1 hr.; $133.38 ............
50 hrs.; $6,669 ...............
$133.38
22
10
1
1
22
10
0.25 hrs.; $33.45 .......
0.25 hrs.; $33.45 .......
5.5 hrs.; $735.90 ............
2.5 hrs.; $333.45 ............
33.45
33.45
Total ................................................
82
........................
..............................
....................................
84 hrs.; $11,212.74 ........
........................
Dated: May 5, 2021.
Kimberly D. Bose,
Secretary.
Description: Notice of Change in
Status of GridLiance Transcos (Part 4).
Filed Date: 4/30/21.
Accession Number: 20210430–5751.
[FR Doc. 2021–09935 Filed 5–10–21; 8:45 am]
Comments Due: 5 p.m. ET 5/21/21.
BILLING CODE 6717–01–P
Docket Numbers: ER18–1535–007;
ER10–1951–033; ER10–1970–021;
DEPARTMENT OF ENERGY
ER10–1972–021; ER10–1973–015;
ER10–1974–026; ER10–2641–039;
Federal Energy Regulatory
ER11–2192–017; ER11–4462–054;
Commission
ER11–4677–018; ER12–2444–017;
ER12–676–014; ER13–2461–016; ER14–
Combined Notice of Filings #2
21–009; ER14–2708–021; ER14–2709–
020; ER14–2710–020; ER15–2243–009;
Take notice that the Commission
ER15–30–018; ER15–58–018; ER16–
received the following electric rate
1440–014; ER16–1913–008; ER16–2240–
filings:
014; ER16–2241–013; ER16–2297–013;
Docket Numbers: ER10–1989–018;
ER16–2443–008; ER16–2506–013;
ER10–2078–022; ER11–4678–018;
ER12–1660–021; ER12–631–019; ER13– ER17–1774–006; ER17–196–006; ER17–
2458–016; ER13–2474–019; ER15–1016– 838–029; ER18–1981–009; ER18–2224–
012; ER18–2314–005; ER18–772–006;
011; ER16–1277–011; ER16–1293–011;
ER17–2270–013; ER17–582–009; ER17– ER18–807–007; ER19–11–006; ER19–
1128–003; ER19–2266–004; ER20–1219–
583–009; ER18–2032–009; ER18–2091–
003; ER20–1220–003; ER20–1879–004;
008; ER19–2382–005; ER19–2495–005;
ER19–2513–005; ER19–774–007; ER20– ER20–1985–003; ER20–1988–004;
2069–002; ER20–2070–003; ER20–2237– ER20–1991–003; ER20–2012–003;
ER20–2153–004; ER20–2380–003;
003; ER20–2597–003; ER20–2603–003;
ER20–2648–003; ER20–792–003; ER21–
ER20–637–003; ER20–780–003; ER21–
183–001.
255–004; ER21–744–001.
Applicants: Montauk Energy Storage
Applicants: Sky River LLC, White Oak
Center, LLC, Mountain View Solar, LLC,
Energy LLC, Vasco Winds, LLC,
NEPM II, LLC, New Mexico Wind, LLC,
Windpower Partners 1993, Tuscola Bay
NextEra Blythe Solar Energy Center,
Wind, LLC, Tuscola Wind II, LLC,
LLC, NextEra Energy Bluff Point, LLC,
Steele Flats Wind Project, LLC, Shafter
NextEra Energy Duane Arnold, LLC,
Solar, LLC, White Pine Solar, LLC,
NextEra Energy Montezuma II Wind,
White Oak Solar, LLC, Westside Solar,
LLC, NextEra Energy Point Beach, LLC,
LLC, Whitney Point Solar, LLC,
NextEra Energy Marketing, LLC,
Stuttgart Solar, LLC, Wildcat Ranch
NextEra Energy Seabrook, LLC, NextEra
Wind Project, LLC, Titan Solar, LLC,
Energy Services Massachusetts, LLC,
Stanton Clean Energy, LLC, Story
Northeast Energy Associates, A Limited
County Wind, LLC, Wessington Springs
Partnership, Ninnescah Wind Energy,
Wind, LLC, Wilton Wind Energy II, LLC,
LLC, North Sky River Energy, LLC,
Wilton Wind Energy I, LLC, Sooner
Northern Colorado Wind Energy Center
Wind, LLC, Wheatridge Wind Energy,
II, LLC, Northern Colorado Wind Energy
LLC, Wheatridge Wind II, LLC,
Center, LLC, Northern Divide Wind,
Weatherford Wind, LLC, Soldier Creek
LLC, Nutmeg Solar, LLC, Oklahoma
Wind, LLC, Skeleton Creek Wind, LLC,
Wind, LLC, Oleander Power Project,
Taylor Creek Solar, LLC, Wallingford
Limited Partnership, Oliver Wind
Renewable Energy LLC.
Energy Center II, LLC, Oliver Wind I,
LLC, Oliver Wind III, LLC, Orbit Bloom
6 The total number of respondents in the
Energy, LLC, Osborn Wind Energy, LLC,
currently approved OMB inventory for FERC–576 is
Palo Duro Wind Energy, LLC, Palo Duro
147. Changes to the estimate were based on average
number of respondents over the past three years.
Wind Interconnection Services, LLC,
VerDate Sep<11>2014
17:13 May 10, 2021
Jkt 253001
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Peetz Logan Interconnect, LLC, Peetz
Table Wind, LLC, Pegasus Wind, LLC,
Perrin Ranch Wind, LLC, Pheasant Run
Wind, LLC, Pima Energy Storage
System, LLC, Pinal Central Energy
Center, LLC, Ponderosa Wind, LLC,
Pratt Wind, LLC, Quitman Solar, LLC,
Red Mesa Wind, LLC, River Bend Solar,
LLC, Roswell Solar, LLC, Rush Springs
Energy Storage, LLC, Rush Springs
Wind Energy, LLC, Saint Solar, LLC,
Sanford Airport Solar, LLC, Seiling
Wind, LLC, Seiling Wind II, LLC,
Seiling Wind Interconnection Services,
LLC, Sholes Wind, LLC, Silver State
Solar Power South, LLC.
Description: Notice of Change in
Status of GridLiance Transcos (Part 3).
Filed Date: 4/30/21.
Accession Number: 20210430–5754.
Comments Due: 5 p.m. ET 5/21/21.
Docket Numbers: ER19–2462–002;
ER18–2264–007; ER19–289–005; ER11–
4111–002.
Applicants: Macquarie Energy LLC,
Macquarie Energy Trading LLC, Cleco
Cajun LLC, Hudson Ranch Power I LLC.
Description: Supplement to November
30, 2020, February 2, 2021, and March
1, 2021 Notice of Non-Material Change
in Status of Macquarie Energy LLC, et
al.
Filed Date: 5/4/21.
Accession Number: 20210504–5184.
Comments Due: 5 p.m. ET 5/25/21.
Docket Numbers: ER20–1150–002.
Applicants: The Dayton Power and
Light Company, PJM Interconnection,
L.L.C.
Description: Compliance filing:
Dayton submits Compliance Filing re:
Refund Report in ER20–1150–001 to be
effective 5/3/2020.
Filed Date: 5/5/21.
Accession Number: 20210505–5129.
Comments Due: 5 p.m. ET 5/26/21.
Docket Numbers: ER21–1225–001.
Applicants: Long Ridge Energy
Generation LLC.
Description: Tariff Amendment:
Deficiency Response to MBR
Application-Docket ER21–1225 to be
effective 4/29/2021.
Filed Date: 5/5/21.
E:\FR\FM\11MYN1.SGM
11MYN1
Federal Register / Vol. 86, No. 89 / Tuesday, May 11, 2021 / Notices
Accession Number: 20210505–5108.
Comments Due: 5 p.m. ET 5/26/21.
Docket Numbers: ER21–1832–000.
Applicants: SunEnergy1, LLC.
Description: Petition for Limited
Waiver and Request for Shortened
Comment Period and Expedited
Commission Approval of SunEnergy1,
LLC.
Filed Date: 5/3/21.
Accession Number: 20210503–5144.
Comments Due: 5 p.m. ET 5/24/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–09934 Filed 5–10–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15116–000]
Ocean Renewable Power Company,
Inc.; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On April 29, 2021, Ocean Renewable
Power Company, Inc. filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the proposed East Foreland
Tidal Energy Project No. 15116–000, to
be located on Cook Inlet near Nikiski
and adjacent lands of the Kenai
Peninsula Borough, Alaska. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
VerDate Sep<11>2014
17:13 May 10, 2021
Jkt 253001
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A series of proprietary
turbine-generator units with a combined
capacity of no more than 5 megawatts;
(2) a 1- to 5-mile-long, 12.5- to 25-kV
submarine transmission cable from the
module site to an onshore location on
the west coast of the Kenai Peninsula;
(3) an approximately 0.75-mile-long,
12.5- to 25-kV above-ground
transmission line leading to a substation
owned by Homer Electric Association;
and (4) appurtenant facilities. The
estimated annual generation of the East
Foreland project would be up to 13.5
gigawatt-hours.
Applicant Contact: Nathan Johnson,
254 Commercial Street, Suite 119B,
Portland, Maine 04101; phone: (207)
772–7707; email: njohnson@orpc.co.
FERC Contact: Kristen Sinclair;
phone: (202) 502–6587; email:
kristen.sinclair@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15116–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
25855
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15116) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: May 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–09927 Filed 5–10–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP21–720–002.
Applicants: WBI Energy
Transmission, Inc.
Description: Tariff Amendment: 2021
Second Amendment Filing to New
GMS—Uncommitted Capacity to be
effective 5/7/2021.
Filed Date: 5/4/21.
Accession Number: 20210504–5053.
Comments Due: 5 p.m. ET 5/17/21.
Docket Numbers: RP21–814–000.
Applicants: Stingray Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing:
Housekeeping Tariff Filing to be
effective 6/4/2021.
Filed Date: 5/4/21.
Accession Number: 20210504–5072.
Comments Due: 5 p.m. ET 5/17/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
E:\FR\FM\11MYN1.SGM
11MYN1
Agencies
[Federal Register Volume 86, Number 89 (Tuesday, May 11, 2021)]
[Notices]
[Pages 25854-25855]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-09934]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1989-018; ER10-2078-022; ER11-4678-018; ER12-
1660-021; ER12-631-019; ER13-2458-016; ER13-2474-019; ER15-1016-011;
ER16-1277-011; ER16-1293-011; ER17-2270-013; ER17-582-009; ER17-583-
009; ER18-2032-009; ER18-2091-008; ER19-2382-005; ER19-2495-005; ER19-
2513-005; ER19-774-007; ER20-2069-002; ER20-2070-003; ER20-2237-003;
ER20-2597-003; ER20-2603-003; ER20-637-003; ER20-780-003; ER21-255-004;
ER21-744-001.
Applicants: Sky River LLC, White Oak Energy LLC, Vasco Winds, LLC,
Windpower Partners 1993, Tuscola Bay Wind, LLC, Tuscola Wind II, LLC,
Steele Flats Wind Project, LLC, Shafter Solar, LLC, White Pine Solar,
LLC, White Oak Solar, LLC, Westside Solar, LLC, Whitney Point Solar,
LLC, Stuttgart Solar, LLC, Wildcat Ranch Wind Project, LLC, Titan
Solar, LLC, Stanton Clean Energy, LLC, Story County Wind, LLC,
Wessington Springs Wind, LLC, Wilton Wind Energy II, LLC, Wilton Wind
Energy I, LLC, Sooner Wind, LLC, Wheatridge Wind Energy, LLC,
Wheatridge Wind II, LLC, Weatherford Wind, LLC, Soldier Creek Wind,
LLC, Skeleton Creek Wind, LLC, Taylor Creek Solar, LLC, Wallingford
Renewable Energy LLC.
Description: Notice of Change in Status of GridLiance Transcos
(Part 4).
Filed Date: 4/30/21.
Accession Number: 20210430-5751.
Comments Due: 5 p.m. ET 5/21/21.
Docket Numbers: ER18-1535-007; ER10-1951-033; ER10-1970-021; ER10-
1972-021; ER10-1973-015; ER10-1974-026; ER10-2641-039; ER11-2192-017;
ER11-4462-054; ER11-4677-018; ER12-2444-017; ER12-676-014; ER13-2461-
016; ER14-21-009; ER14-2708-021; ER14-2709-020; ER14-2710-020; ER15-
2243-009; ER15-30-018; ER15-58-018; ER16-1440-014; ER16-1913-008; ER16-
2240-014; ER16-2241-013; ER16-2297-013; ER16-2443-008; ER16-2506-013;
ER17-1774-006; ER17-196-006; ER17-838-029; ER18-1981-009; ER18-2224-
012; ER18-2314-005; ER18-772-006; ER18-807-007; ER19-11-006; ER19-1128-
003; ER19-2266-004; ER20-1219-003; ER20-1220-003; ER20-1879-004; ER20-
1985-003; ER20-1988-004; ER20-1991-003; ER20-2012-003; ER20-2153-004;
ER20-2380-003; ER20-2648-003; ER20-792-003; ER21-183-001.
Applicants: Montauk Energy Storage Center, LLC, Mountain View
Solar, LLC, NEPM II, LLC, New Mexico Wind, LLC, NextEra Blythe Solar
Energy Center, LLC, NextEra Energy Bluff Point, LLC, NextEra Energy
Duane Arnold, LLC, NextEra Energy Montezuma II Wind, LLC, NextEra
Energy Point Beach, LLC, NextEra Energy Marketing, LLC, NextEra Energy
Seabrook, LLC, NextEra Energy Services Massachusetts, LLC, Northeast
Energy Associates, A Limited Partnership, Ninnescah Wind Energy, LLC,
North Sky River Energy, LLC, Northern Colorado Wind Energy Center II,
LLC, Northern Colorado Wind Energy Center, LLC, Northern Divide Wind,
LLC, Nutmeg Solar, LLC, Oklahoma Wind, LLC, Oleander Power Project,
Limited Partnership, Oliver Wind Energy Center II, LLC, Oliver Wind I,
LLC, Oliver Wind III, LLC, Orbit Bloom Energy, LLC, Osborn Wind Energy,
LLC, Palo Duro Wind Energy, LLC, Palo Duro Wind Interconnection
Services, LLC, Peetz Logan Interconnect, LLC, Peetz Table Wind, LLC,
Pegasus Wind, LLC, Perrin Ranch Wind, LLC, Pheasant Run Wind, LLC, Pima
Energy Storage System, LLC, Pinal Central Energy Center, LLC, Ponderosa
Wind, LLC, Pratt Wind, LLC, Quitman Solar, LLC, Red Mesa Wind, LLC,
River Bend Solar, LLC, Roswell Solar, LLC, Rush Springs Energy Storage,
LLC, Rush Springs Wind Energy, LLC, Saint Solar, LLC, Sanford Airport
Solar, LLC, Seiling Wind, LLC, Seiling Wind II, LLC, Seiling Wind
Interconnection Services, LLC, Sholes Wind, LLC, Silver State Solar
Power South, LLC.
Description: Notice of Change in Status of GridLiance Transcos
(Part 3).
Filed Date: 4/30/21.
Accession Number: 20210430-5754.
Comments Due: 5 p.m. ET 5/21/21.
Docket Numbers: ER19-2462-002; ER18-2264-007; ER19-289-005; ER11-
4111-002.
Applicants: Macquarie Energy LLC, Macquarie Energy Trading LLC,
Cleco Cajun LLC, Hudson Ranch Power I LLC.
Description: Supplement to November 30, 2020, February 2, 2021, and
March 1, 2021 Notice of Non-Material Change in Status of Macquarie
Energy LLC, et al.
Filed Date: 5/4/21.
Accession Number: 20210504-5184.
Comments Due: 5 p.m. ET 5/25/21.
Docket Numbers: ER20-1150-002.
Applicants: The Dayton Power and Light Company, PJM
Interconnection, L.L.C.
Description: Compliance filing: Dayton submits Compliance Filing
re: Refund Report in ER20-1150-001 to be effective 5/3/2020.
Filed Date: 5/5/21.
Accession Number: 20210505-5129.
Comments Due: 5 p.m. ET 5/26/21.
Docket Numbers: ER21-1225-001.
Applicants: Long Ridge Energy Generation LLC.
Description: Tariff Amendment: Deficiency Response to MBR
Application-Docket ER21-1225 to be effective 4/29/2021.
Filed Date: 5/5/21.
[[Page 25855]]
Accession Number: 20210505-5108.
Comments Due: 5 p.m. ET 5/26/21.
Docket Numbers: ER21-1832-000.
Applicants: SunEnergy1, LLC.
Description: Petition for Limited Waiver and Request for Shortened
Comment Period and Expedited Commission Approval of SunEnergy1, LLC.
Filed Date: 5/3/21.
Accession Number: 20210503-5144.
Comments Due: 5 p.m. ET 5/24/21.
The filings are accessible in the Commission's eLibrary system
(https://elibrary.ferc.gov/idmws/search/fercgensearch.asp) by querying
the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 5, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-09934 Filed 5-10-21; 8:45 am]
BILLING CODE 6717-01-P