Commission Information Collection Activities (FERC-725A); Comment Request; Extension, 23954-23957 [2021-09519]

Download as PDF 23954 Federal Register / Vol. 86, No. 85 / Wednesday, May 5, 2021 / Notices FERC–65 (NOTIFICATION OF HOLDING COMPANY STATUS), FERC–65A (EXEMPTION NOTIFICATION OF HOLDING COMPANY STATUS), AND FERC–65B (WAIVER NOTIFICATION OF HOLDING COMPANY STATUS) Number of respondents Annual number of responses per respondent Total number of responses Average burden & cost per response 3 Total annual burden hours & total annual cost ($) Cost per respondent ($) (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) (5) ÷ (1) FERC–65 ................................................. FERC–65A ............................................... FERC–65B ............................................... 12 4 4 1 1.25 1.75 12 5 7 3; $249.00 1; $83.00 1; $83.00 36; $2,988 5; $415.00 7; $581.00 $249.00 103.75 145.25 Total .................................................. ........................ ........................ 24 ........................ 48; 3,984.00 ........................ Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: April 29, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–09517 Filed 5–4–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP95–408–088. Applicants: Columbia Gas Transmission, LLC. Description: Annual Report on Sharing Profits from Base Gas Sales with Customers of Columbia Gas Transmission, LLC. Filed Date: 4/26/21. Accession Number: 20210426–5152. Comments Due: 5 p.m. ET 5/10/21. Docket Numbers: RP21–752–000. Applicants: ANR Storage Company. 3 The Commission staff estimates that the average respondent for this collection is similarly situated to the Commission, in terms of salary plus benefits. Based on FERC’s 2020 annual average of $172,329 (for salary plus benefits), the average hourly cost is $83/hour. VerDate Sep<11>2014 23:06 May 04, 2021 Jkt 253001 Description: Compliance filing 2021 Operational Purchases and Sales Report. Filed Date: 4/27/21. Accession Number: 20210427–5094. Comments Due: 5 p.m. ET 5/10/21. Docket Numbers: RP21–753–000. Applicants: Discovery Gas Transmission LLC. Description: Imbalance Cash-out Report for 2020 Annual Fuel Activity for Discovery Gas Transmission LLC. Filed Date: 4/27/21. Accession Number: 20210427–5138. Comments Due: 5 p.m. ET 5/10/21. Docket Numbers: RP21–754–000. Applicants: Carolina Gas Transmission, LLC. Description: Compliance filing CGT— April 28, 2021 Service Agreement Termination Notice. Filed Date: 4/28/21. Accession Number: 20210428–5032. Comments Due: 5 p.m. ET 5/10/21. Docket Numbers: RP21–755–000. Applicants: Cameron Interstate Pipeline, LLC. Description: Annual Report of Penalty Revenues of Cameron Interstate Pipeline, LLC. Filed Date: 4/28/21. Accession Number: 20210428–5293. Comments Due: 5 p.m. ET 5/10/21. Docket Numbers: RP21–756–000. Applicants: Cameron Interstate Pipeline, LLC. Description: Annual Report of Transportation Imbalances and CashOut Activity of Cameron Interstate Pipeline, LLC. Filed Date: 4/28/21. Accession Number: 20210428–5294. Comments Due: 5 p.m. ET 5/10/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 29, 2021. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2021–09482 Filed 5–4–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. IC21–19–000, RD21–4–000] Commission Information Collection Activities (FERC–725A); Comment Request; Extension Federal Energy Regulatory Commission, Department of Energy. AGENCY: Notice of information collection and request for comments. ACTION: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC– 725A (Mandatory Reliability Standards for the Bulk-Power System). This notice includes the burden totals for proposed Reliability Standard FAC–008–5. SUMMARY: E:\FR\FM\05MYN1.SGM 05MYN1 Federal Register / Vol. 86, No. 85 / Wednesday, May 5, 2021 / Notices Comments on the collection of information are due July 6, 2021. ADDRESSES: You may submit copies of your comments (identified by Docket No. IC21–19–000) by one of the following methods: Electronic filing through https:// www.ferc.gov, is preferred. • Electronic Filing: Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format. • For those unable to file electronically, comments may be filed by USPS mail or by hand (including courier) delivery: Æ Mail via U.S. Postal Service Only: Addressed to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. Æ Hand (Including Courier) Delivery: Deliver to: Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov. For user assistance, contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at (866) 208–3676 (toll-free). Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, telephone at (202) 502–8663. SUPPLEMENTARY INFORMATION: Title: FERC–725A (Mandatory Reliability Standards for the Bulk-Power System). OMB Control No.: 1902–0244. Type of Request: Three-year extension of the FERC–725A information collection requirements with no changes to the current reporting requirements. Abstract: On August 8, 2005, the Electricity Modernization Act of 2005, which is Title XII, Subtitle A, of the Energy Policy Act of 2005 (EPAct 2005), was enacted into law.1 EPAct 2005 added a new section 215 to the FPA, which requires a Commission-certified DATES: 1 Energy Policy Act of 2005, Public Law 109–58, Title XII, Subtitle A, 119 Stat. 594, 941 (2005), to be codified at 16 U.S.C. 824o. VerDate Sep<11>2014 23:06 May 04, 2021 Jkt 253001 electric reliability organization (ERO) (FERC–725) to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the ERO, subject to Commission oversight or the Commission can independently enforce Reliability Standards (FERC–725A).2 On February 3, 2006, the Commission issued Order No. 672, implementing section 215 of the FPA.3 Pursuant to Order No. 672, the Commission certified one organization, NERC, as the ERO.4 The ERO is required to develop Reliability Standards, which are subject to Commission review and approval. The Reliability Standards will apply to users, owners and operators of the BulkPower System, as set forth in each Reliability Standard. On March 16, 2007, the Commission issued Order No. 693, a Final Rule adding part 40, a new part, to the Commission’s regulations. The Final Rule states that this part applies to all users, owners and operators of the BulkPower System within the United States (other than Alaska or Hawaii). It also requires that each Reliability Standard identify the subset of users, owners and operators to which that particular Reliability Standard applies. The new regulations also require that each Reliability Standard that is approved by the Commission will be maintained on the ERO’s internet website for public inspection. In order that the Commission is able to perform its oversight function with regard to Reliability Standards that are proposed by the ERO and established by the Commission, it is essential that the Commission receive timely information regarding all or potential violations of Reliability Standards. While section 215 of the FPA contemplates the filing of the record of an ERO or Regional Entity 2 16 U.S.C. 824o(e)(3). Concerning Certification of the Electric Reliability Organization; Procedures for the Establishment, Approval and Enforcement of Electric Reliability Standards, Order No. 672, 71 FR 8662 (February 17, 2006), FERC Stats. & Regs. ¶ 31,204 (2006), order on reh’g, Order No. 672–A, 71 FR 19814 (April 18, 2006), FERC Stats. & Regs. ¶ 31,212 (2006). 4 North American Electric Reliability Corp., 116 FERC ¶ 61,062 (ERO Certification Order), order on reh’g & compliance, 117 FERC ¶ 61,126 (ERO Rehearing Order) (2006), order on compliance, 118 FERC ¶ 61,030 (2007) (January 2007 Compliance Order). 3 Rules PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 23955 enforcement action, FERC needs information regarding violations and potential violations at or near the time of occurrence. Therefore, it will work with the ERO and regional reliability organizations to be able to use the electronic filing of information so the Commission receives timely information. The new regulations also require that each Reliability Standard that is approved by the Commission will be maintained on the ERO’s internet website for public inspection. In accordance with section 39.5 of the Commission’s regulations, the ERO must file each Reliability Standard or a modification to a Reliability Standard with the Commission. The filing is to include a concise statement of the basis and purpose of the proposed Reliability Standard, either a summary of the Reliability development proceedings conducted by the ERO or a summary of the Reliability Standard development proceedings conducted by a Regional Entity together with a summary of the Reliability Standard review proceedings of the ERO and a demonstration that the proposed Reliability Standard is ‘‘just, reasonable, not unduly discriminatory or preferential, and in the public interest. RD21–4 (FAC–008–05) The proposed information collection changes in Docket No. RD21–4–000 relate to the proposed Reliability Standard FAC–008–05 (Facility Ratings) developed by the North American Electric Reliability Corporation (NERC), and submitted to the Commission for approval. The Commission received NERC’s petition to approve the proposed Reliability Standards. On February 19, 2021, NERC filed a petition seeking approval of proposed Reliability Standard FAC–008–5. NERC states that proposed Reliability Standard FAC–008–5 reflects the retirement of Requirement R7 of the currently effective standard. NERC notes that this proposal was recommended following the first phase of work under the NERC Standards Efficiency Review and that in its Order No. 873 remanding a previously proposed version of the FAC–008 Reliability Standard, the Commission agreed that the retirement of Requirement R7 from the standard would not result in a reliability gap. E:\FR\FM\05MYN1.SGM 05MYN1 23956 Federal Register / Vol. 86, No. 85 / Wednesday, May 5, 2021 / Notices In June 2019, following the conclusion of the standard development process, NERC submitted a series of standard retirement proposals to the Commission. Among the proposals, NERC submitted for Commission approval proposed Reliability Standard FAC–008–4, in which NERC proposed to retire Requirements R7 and R8 of currently effective Reliability Standard FAC–008–3. In September 2020, the Commission issued Order No. 873 regarding NERC’s retirement proposals. In this order, the Commission remanded proposed Reliability Standard FAC– 008–4 to NERC for further consideration, citing concerns with the proposed retirement of Requirement R8 of the currently effective standard. The standard drafting team determined to develop a new version of the Reliability Standard, proposed Reliability Standard FAC–008–5, in which only Requirement R7 of the currently effective standard would be proposed for retirement. Reliability Standard FAC–008–3 Requirement R7 requires Generator Owners and Transmission Owners to provide certain information to requesting Reliability Coordinator(s), Planning Coordinator(s), Transmission Planner(s), Transmission Owner(s), and Transmission Operator(s) regarding their Facilities, as follows: R7. Each Generator Owner shall provide Facility Ratings (for its solely and jointly owned Facilities that are existing Facilities, new Facilities, modifications to existing Facilities and re-ratings of existing Facilities) to its associated Reliability Coordinator(s), Planning Coordinator(s), Transmission Planner(s), Transmission Owner(s) and Transmission Operator(s) as scheduled by such requesting entities. In the years since Reliability Standard FAC–008–3 was developed, NERC has developed other Reliability Standards that render the data provision obligations of Requirement R7 redundant. Specifically, Reliability Standards MOD–032–1, IRO–010–2, and TOP–003–3 contain provisions to help ensure that the entities that have the responsibility to plan and operate the Bulk Power System have the data they need from Generator Owners and Transmission Owners for operations and planning. Requirement R1 of Reliability Standard MOD–032–1—Data for Power System Modeling and Analysis requires the Planning Coordinator and Transmission Planner to develop modeling data requirements and reporting procedures including the data listed in Attachment 1 to the standard. This data would include information on power capabilities and Facility Ratings. Requirement R2 requires the Generator Owner and Transmission Owner to provide the requested information. Requirement R1 of Reliability Standard IRO–010–2— Reliability Coordinator Data Specification and Collection requires the Reliability Coordinator to maintain a documented specification for the data necessary to perform its Operational Planning Analyses, Real-time monitoring, and Real-time Assessments. This data necessarily includes Facility Ratings as inputs to System Operating Limit monitoring. Requirement R3 requires the Transmission Owner and Generator Owner to provide requested data. Similarly, Requirement R1 of Reliability Standard TOP–003–3— Operational Reliability Data requires the Transmission Operator to maintain a documented data specification (Requirement R1) and for the Transmission Owner and Generator Owner to provide the requested data (Requirement R5). Estimate of Annual Burden: 5 The Commission estimates the burden and cost 6 for this information collection as follows. PROPOSED CHANGES TO BURDEN DUE TO DOCKET NO. RD20–4–000 ADJUSTMENTS AND CLARIFICATIONS Reliability standard & requirements Number of respondents & type of entity Annual number of responses per respondent Annual number of responses Average burden hrs. per response Total annual burden hours (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) RD21–4 Net Changes to FERC–725A, OMB Control No. 1902–0244 FAC–008–05 (Facility Ratings) 7. 1,003 (No Change) ..... 5 Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. For further explanation of what is included in the information collection burden, refer to 5 CFR part 1320. VerDate Sep<11>2014 23:06 May 04, 2021 Jkt 253001 1 1,003 (No Change) ....... 6 The Commission staff thinks that the average respondent for this collection is similarly situated to the Commission, in terms of salary plus benefits. Based on FERC’s 2020 annual average of $172,329 (for salary plus benefits), the average hourly cost is $83/hour. PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 ¥10 hrs. (Reduction) .. ¥10,030 hrs. (Reduction). 7 The type of entity effect is the NERC registered GO = Generator Owners (1,003). This reduction for 725A represent a decrease in burden but the GOs still have other obligations, so the 1,003 is included for information purpose but does not affect the overall number of entities in 725A. E:\FR\FM\05MYN1.SGM 05MYN1 23957 Federal Register / Vol. 86, No. 85 / Wednesday, May 5, 2021 / Notices IC21–19–000 Renewal of 725A Mandatory Reliability Standards that fall under FERC–725A. The following table represents the current burden associated with all Reliability standard & requirement Number of entity 8 Number of annual responses per entity Total number of responses Average number of burden hours per response Total burden hours (1) (2) (1) * (2) = (3) (4) (3) * (4) = (5) FERC–725A Mandatory Reliability Standards for Bulk Power System. RD21–4 Net Changes ............................. (3,420) .................... 1 3,420 ........................ 428.86 1,003 (No change) 1 1,003 (No Change) ... ¥10 Total for FERC–725A ....................... ................................. ........................ ................................... ........................ Note: FAC–008–05 is a part of the Bulk Power System burden totals. The net changes for the responses and hours will affect the totals for the row stated ‘‘Mandatory Reliability Standards for Bulk Power System’’. Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: April 29, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–09519 Filed 5–4–21; 8:45 am] BILLING CODE 6717–01–P 8 This is a list of NERC registered entities who under 725A need to follow the NERC Standards. BA = Balancing Authority (99); DP = Distribution Provider (373); GP = Generator Owner (1,003); Generator Operator (937); PA PC Planning Authority Planning Coordinator (65); RC = Reliability Coordinator (11); RP = Resource Planner (160); RSG = Reserve Sharing Group (11); FRSG = Frequency Response Sharing Group (1); TO = Transmission Owner (321); TOP = Transmission Operator (167); TP = Transmission Provided (201); TSP = Transmission Service Provider (71); for a sum total of (3,420). The same entity may have multiple registration obligation to follow under 725A so an individual entity’s obligation increases based on registration functions. These values were derived from the NERC Compliance data of February 5, 2021 using only unique United States registered entities. VerDate Sep<11>2014 23:06 May 04, 2021 Jkt 253001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2242–125] Eugene Water and Electric Board; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Amended Recreation and Aesthetics Management Plan. b. Project No: 2242–125. c. Date Filed: January 8, 2021. d. Applicant: Eugene Water and Electric Board. e. Name of Project: Carmen-Smith Hydroelectric Project. f. Location: The project is located on the McKenzie River in Lane and Linn counties, Oregon and occupies 624.56 acres of federal lands administered by the U.S. Forest Service. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Scarlett Philibosian, Eugene Water and Electric Board, 500 East 4th Avenue, Eugene, OR 97440; telephone (541) 685–7120; or email scarlett.philibosian@eweb.org. i. FERC Contact: Mark Ivy, (202) 502– 6156, or mark.ivy@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: June 1, 2021. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 1,466,716 hrs. ¥10,030 hrs. (Reduction). 1,456,686 hrs. eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–2242–125. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The licensees filed an amended Recreation and Aesthetics Management Plan (plan) which incorporates changes requested by the U.S. Forest Service to align the plan with current agency management strategies and proposes additional modifications, for Commission approval. The recreation facilities available at many recreation sites would E:\FR\FM\05MYN1.SGM 05MYN1

Agencies

[Federal Register Volume 86, Number 85 (Wednesday, May 5, 2021)]
[Notices]
[Pages 23954-23957]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-09519]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. IC21-19-000, RD21-4-000]


Commission Information Collection Activities (FERC-725A); Comment 
Request; Extension

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Notice of information collection and request for comments.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, the Federal Energy Regulatory Commission (Commission or 
FERC) is soliciting public comment on the currently approved 
information collection, FERC-725A (Mandatory Reliability Standards for 
the Bulk-Power System). This notice includes the burden totals for 
proposed Reliability Standard FAC-008-5.

[[Page 23955]]


DATES: Comments on the collection of information are due July 6, 2021.

ADDRESSES: You may submit copies of your comments (identified by Docket 
No. IC21-19-000) by one of the following methods:
    Electronic filing through https://www.ferc.gov, is preferred.
     Electronic Filing: Documents must be filed in acceptable 
native applications and print-to-PDF, but not in scanned or picture 
format.
     For those unable to file electronically, comments may be 
filed by USPS mail or by hand (including courier) delivery:
    [cir] Mail via U.S. Postal Service Only: Addressed to: Federal 
Energy Regulatory Commission, Secretary of the Commission, 888 First 
Street NE, Washington, DC 20426.
    [cir] Hand (Including Courier) Delivery: Deliver to: Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: https://www.ferc.gov. For user 
assistance, contact FERC Online Support by email at 
[email protected], or by phone at (866) 208-3676 (toll-free).
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at https://www.ferc.gov.

FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at 
[email protected], telephone at (202) 502-8663.

SUPPLEMENTARY INFORMATION: 
    Title: FERC-725A (Mandatory Reliability Standards for the Bulk-
Power System).
    OMB Control No.: 1902-0244.
    Type of Request: Three-year extension of the FERC-725A information 
collection requirements with no changes to the current reporting 
requirements.
    Abstract: On August 8, 2005, the Electricity Modernization Act of 
2005, which is Title XII, Subtitle A, of the Energy Policy Act of 2005 
(EPAct 2005), was enacted into law.\1\ EPAct 2005 added a new section 
215 to the FPA, which requires a Commission-certified electric 
reliability organization (ERO) (FERC-725) to develop mandatory and 
enforceable Reliability Standards, which are subject to Commission 
review and approval. Once approved, the Reliability Standards may be 
enforced by the ERO, subject to Commission oversight or the Commission 
can independently enforce Reliability Standards (FERC-725A).\2\
---------------------------------------------------------------------------

    \1\ Energy Policy Act of 2005, Public Law 109-58, Title XII, 
Subtitle A, 119 Stat. 594, 941 (2005), to be codified at 16 U.S.C. 
824o.
    \2\ 16 U.S.C. 824o(e)(3).
---------------------------------------------------------------------------

    On February 3, 2006, the Commission issued Order No. 672, 
implementing section 215 of the FPA.\3\ Pursuant to Order No. 672, the 
Commission certified one organization, NERC, as the ERO.\4\ The ERO is 
required to develop Reliability Standards, which are subject to 
Commission review and approval. The Reliability Standards will apply to 
users, owners and operators of the Bulk-Power System, as set forth in 
each Reliability Standard.
---------------------------------------------------------------------------

    \3\ Rules Concerning Certification of the Electric Reliability 
Organization; Procedures for the Establishment, Approval and 
Enforcement of Electric Reliability Standards, Order No. 672, 71 FR 
8662 (February 17, 2006), FERC Stats. & Regs. ] 31,204 (2006), order 
on reh'g, Order No. 672-A, 71 FR 19814 (April 18, 2006), FERC Stats. 
& Regs. ] 31,212 (2006).
    \4\ North American Electric Reliability Corp., 116 FERC ] 61,062 
(ERO Certification Order), order on reh'g & compliance, 117 FERC ] 
61,126 (ERO Rehearing Order) (2006), order on compliance, 118 FERC ] 
61,030 (2007) (January 2007 Compliance Order).
---------------------------------------------------------------------------

    On March 16, 2007, the Commission issued Order No. 693, a Final 
Rule adding part 40, a new part, to the Commission's regulations. The 
Final Rule states that this part applies to all users, owners and 
operators of the Bulk-Power System within the United States (other than 
Alaska or Hawaii). It also requires that each Reliability Standard 
identify the subset of users, owners and operators to which that 
particular Reliability Standard applies. The new regulations also 
require that each Reliability Standard that is approved by the 
Commission will be maintained on the ERO's internet website for public 
inspection.
    In order that the Commission is able to perform its oversight 
function with regard to Reliability Standards that are proposed by the 
ERO and established by the Commission, it is essential that the 
Commission receive timely information regarding all or potential 
violations of Reliability Standards. While section 215 of the FPA 
contemplates the filing of the record of an ERO or Regional Entity 
enforcement action, FERC needs information regarding violations and 
potential violations at or near the time of occurrence. Therefore, it 
will work with the ERO and regional reliability organizations to be 
able to use the electronic filing of information so the Commission 
receives timely information. The new regulations also require that each 
Reliability Standard that is approved by the Commission will be 
maintained on the ERO's internet website for public inspection. In 
accordance with section 39.5 of the Commission's regulations, the ERO 
must file each Reliability Standard or a modification to a Reliability 
Standard with the Commission. The filing is to include a concise 
statement of the basis and purpose of the proposed Reliability 
Standard, either a summary of the Reliability development proceedings 
conducted by the ERO or a summary of the Reliability Standard 
development proceedings conducted by a Regional Entity together with a 
summary of the Reliability Standard review proceedings of the ERO and a 
demonstration that the proposed Reliability Standard is ``just, 
reasonable, not unduly discriminatory or preferential, and in the 
public interest.

RD21-4 (FAC-008-05)

    The proposed information collection changes in Docket No. RD21-4-
000 relate to the proposed Reliability Standard FAC-008-05 (Facility 
Ratings) developed by the North American Electric Reliability 
Corporation (NERC), and submitted to the Commission for approval. The 
Commission received NERC's petition to approve the proposed Reliability 
Standards.
    On February 19, 2021, NERC filed a petition seeking approval of 
proposed Reliability Standard FAC-008-5. NERC states that proposed 
Reliability Standard FAC-008-5 reflects the retirement of Requirement 
R7 of the currently effective standard. NERC notes that this proposal 
was recommended following the first phase of work under the NERC 
Standards Efficiency Review and that in its Order No. 873 remanding a 
previously proposed version of the FAC-008 Reliability Standard, the 
Commission agreed that the retirement of Requirement R7 from the 
standard would not result in a reliability gap.

[[Page 23956]]

    In June 2019, following the conclusion of the standard development 
process, NERC submitted a series of standard retirement proposals to 
the Commission. Among the proposals, NERC submitted for Commission 
approval proposed Reliability Standard FAC-008-4, in which NERC 
proposed to retire Requirements R7 and R8 of currently effective 
Reliability Standard FAC-008-3. In September 2020, the Commission 
issued Order No. 873 regarding NERC's retirement proposals. In this 
order, the Commission remanded proposed Reliability Standard FAC-008-4 
to NERC for further consideration, citing concerns with the proposed 
retirement of Requirement R8 of the currently effective standard. The 
standard drafting team determined to develop a new version of the 
Reliability Standard, proposed Reliability Standard FAC-008-5, in which 
only Requirement R7 of the currently effective standard would be 
proposed for retirement. Reliability Standard FAC-008-3 Requirement R7 
requires Generator Owners and Transmission Owners to provide certain 
information to requesting Reliability Coordinator(s), Planning 
Coordinator(s), Transmission Planner(s), Transmission Owner(s), and 
Transmission Operator(s) regarding their Facilities, as follows:
    R7. Each Generator Owner shall provide Facility Ratings (for its 
solely and jointly owned Facilities that are existing Facilities, new 
Facilities, modifications to existing Facilities and re-ratings of 
existing Facilities) to its associated Reliability Coordinator(s), 
Planning Coordinator(s), Transmission Planner(s), Transmission Owner(s) 
and Transmission Operator(s) as scheduled by such requesting entities.
---------------------------------------------------------------------------

    \5\ Burden is defined as the total time, effort, or financial 
resources expended by persons to generate, maintain, retain, or 
disclose or provide information to or for a Federal agency. For 
further explanation of what is included in the information 
collection burden, refer to 5 CFR part 1320.
    \6\ The Commission staff thinks that the average respondent for 
this collection is similarly situated to the Commission, in terms of 
salary plus benefits. Based on FERC's 2020 annual average of 
$172,329 (for salary plus benefits), the average hourly cost is $83/
hour.
    \7\ The type of entity effect is the NERC registered GO = 
Generator Owners (1,003). This reduction for 725A represent a 
decrease in burden but the GOs still have other obligations, so the 
1,003 is included for information purpose but does not affect the 
overall number of entities in 725A.
---------------------------------------------------------------------------

    In the years since Reliability Standard FAC-008-3 was developed, 
NERC has developed other Reliability Standards that render the data 
provision obligations of Requirement R7 redundant. Specifically, 
Reliability Standards MOD-032-1, IRO-010-2, and TOP-003-3 contain 
provisions to help ensure that the entities that have the 
responsibility to plan and operate the Bulk Power System have the data 
they need from Generator Owners and Transmission Owners for operations 
and planning. Requirement R1 of Reliability Standard MOD-032-1--Data 
for Power System Modeling and Analysis requires the Planning 
Coordinator and Transmission Planner to develop modeling data 
requirements and reporting procedures including the data listed in 
Attachment 1 to the standard. This data would include information on 
power capabilities and Facility Ratings. Requirement R2 requires the 
Generator Owner and Transmission Owner to provide the requested 
information. Requirement R1 of Reliability Standard IRO-010-2--
Reliability Coordinator Data Specification and Collection requires the 
Reliability Coordinator to maintain a documented specification for the 
data necessary to perform its Operational Planning Analyses, Real-time 
monitoring, and Real-time Assessments. This data necessarily includes 
Facility Ratings as inputs to System Operating Limit monitoring. 
Requirement R3 requires the Transmission Owner and Generator Owner to 
provide requested data. Similarly, Requirement R1 of Reliability 
Standard TOP-003-3--Operational Reliability Data requires the 
Transmission Operator to maintain a documented data specification 
(Requirement R1) and for the Transmission Owner and Generator Owner to 
provide the requested data (Requirement R5).
    Estimate of Annual Burden: \5\ The Commission estimates the burden 
and cost \6\ for this information collection as follows.

             Proposed Changes to Burden Due to Docket No. RD20-4-000 Adjustments and Clarifications
----------------------------------------------------------------------------------------------------------------
                                 Number of      Annual number                    Average burden
   Reliability standard &      respondents &    of responses    Annual number       hrs. per       Total annual
        requirements           type of entity  per respondent   of  responses       response       burden hours
                              (1)............             (2)  (1) * (2) = (3)  (4)............  (3) * (4) = (5)
----------------------------------------------------------------------------------------------------------------
                           RD21-4 Net Changes to FERC-725A, OMB Control No. 1902-0244
----------------------------------------------------------------------------------------------------------------
FAC-008-05 (Facility          1,003 (No                     1  1,003 (No        -10 hrs.         -10,030 hrs.
 Ratings) \7\.                 Change).                         Change).         (Reduction).     (Reduction).
----------------------------------------------------------------------------------------------------------------


[[Page 23957]]

IC21-19-000 Renewal of 725A

    The following table represents the current burden associated with 
all Mandatory Reliability Standards that fall under FERC-725A.

----------------------------------------------------------------------------------------------------------------
                                                   Number of                     Average number
    Reliability standard &        Number of         annual      Total number of     of burden      Total burden
         requirement              entity \8\     responses per     responses        hours per         hours
                                                    entity                          response
                               (1)............             (2)  (1) * (2) = (3)             (4)  (3) * (4) = (5)
----------------------------------------------------------------------------------------------------------------
                                                    FERC-725A
----------------------------------------------------------------------------------------------------------------
Mandatory Reliability          (3,420)........               1  3,420..........          428.86  1,466,716 hrs.
 Standards for Bulk Power
 System.
RD21-4 Net Changes...........  1,003 (No                     1  1,003 (No                   -10  -10,030 hrs.
                                change).                         Change).                         (Reduction).
                              ----------------------------------------------------------------------------------
    Total for FERC-725A......  ...............  ..............  ...............  ..............  1,456,686 hrs.
----------------------------------------------------------------------------------------------------------------

    Note: FAC-008-05 is a part of the Bulk Power System burden totals. 
The net changes for the responses and hours will affect the totals for 
the row stated ``Mandatory Reliability Standards for Bulk Power 
System''.
---------------------------------------------------------------------------

    \8\ This is a list of NERC registered entities who under 725A 
need to follow the NERC Standards. BA = Balancing Authority (99); DP 
= Distribution Provider (373); GP = Generator Owner (1,003); 
Generator Operator (937); PA PC Planning Authority Planning 
Coordinator (65); RC = Reliability Coordinator (11); RP = Resource 
Planner (160); RSG = Reserve Sharing Group (11); FRSG = Frequency 
Response Sharing Group (1); TO = Transmission Owner (321); TOP = 
Transmission Operator (167); TP = Transmission Provided (201); TSP = 
Transmission Service Provider (71); for a sum total of (3,420). The 
same entity may have multiple registration obligation to follow 
under 725A so an individual entity's obligation increases based on 
registration functions. These values were derived from the NERC 
Compliance data of February 5, 2021 using only unique United States 
registered entities.
---------------------------------------------------------------------------

    Comments: Comments are invited on: (1) Whether the collection of 
information is necessary for the proper performance of the functions of 
the Commission, including whether the information will have practical 
utility; (2) the accuracy of the agency's estimate of the burden and 
cost of the collection of information, including the validity of the 
methodology and assumptions used; (3) ways to enhance the quality, 
utility and clarity of the information collection; and (4) ways to 
minimize the burden of the collection of information on those who are 
to respond, including the use of automated collection techniques or 
other forms of information technology.

    Dated: April 29, 2021.
Kimberly D. Bose,
Secretary.

[FR Doc. 2021-09519 Filed 5-4-21; 8:45 am]
BILLING CODE 6717-01-P